Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Questions about AVR & PSS
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Goshen Area Bus Reconfiguration
Public Service Company of New Mexico
TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Midwest Energy, Inc. Transmission Planning and Expansion
Customer Meeting April 28, 2010 Torrington, WY. Agenda Introductions Accomplishments Update on Torrington Area PVVC Overview PVVC Schedule and Cost Estimates.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
Presentation to WECC TSS May 8, 2015
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
Energy Gateway Gateway West Project Gateway South Project
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Rocky Mountain Power Five Year Study Kick Off Meeting.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Panhandle Renewable Energy Zone (PREZ) Study
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
DISTRIBUTED GENERATION ISSUES Technical Issues Non-Technical Issues.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Nodal Planning Go Live Austin, TX February 3, 2011
Project Costs 2016 Transmission & Distribution Benchmarking
Electric Utility Master Plan Update
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
I-5 Corridor Reinforcement Project
Planning Committee- Map
Key Biscayne Substation
Presentation transcript:

Transmission Capital Project Updates

Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue on key segments including Gateway West, Gateway South, Oquirrh – Terminal, and Boardman to Hemingway 2

Main Grid System Reinforcement Projects On-going reinforcement projects in all states. Projects include: – NERC TPL improvements (N-1, N-1-1) Reconductoring for higher capacity New substations Substation transformer capacity increases New circuit breakers and bus configurations Reliability / Voltage improvements – Capacitor banks – Reactors – Synchronous condenser 3

Main Grid System Reinforcement Projects Cont. Key On-going or Upcoming Projects Include: – Goshen Area Load Tripping RAS (ID) – Goshen-Jefferson-State Line 161 kV Reconductor (ID) – Casper Sub Install kV 250 MVA Transformer (WY) – Standpipe Substation New 230 kV Sub (WY) – Ben Lomond to Parrish 138 kV Line (UT) – Union Gap – Add kV Capacity (WA) – Vantage – Pomona Heights 230 kV line (WA) – Sams Valley kV New Sub (OR) – Snow Goose kV New Sub (OR) 4

Generation Interconnection & Customer Driven Projects PacifiCorp is obligated to interconnect generation customers The transmission facility additions for interconnections shall maintain or improve the level of system reliability Qualifying Facility generation interconnection requests continue to be a significant number of the requests moving forward Network Customer Projects are being constructed to meet actual and studied/forecasted load requirements 5

Generation Interconnection & Customer Driven Projects Cont. Key On-going or Upcoming Projects Include: – Pavant-Flowell-Fillmore 138 kV Rebuild (UT) – Hurricane West (Purgatory Flat substation) New Delivery Point (UT) – St. George Sub Install kV Transformer (UT) – Wallula to McNary 230 kV Line (WA/OR) 6

Local Transmission Reinforcement Projects Local Transmission and Substation system reinforcement projects are on-going in all states – Projects are identified in the Five Year Area Planning studies – Actual loading levels + forecasted load determines timing of the projects – Projects include: Substation transformer capacity additions New substations and load transfers Transmission line reinforcements to increase capacity Voltage conversions 7