Doc.: IEEE 802.11-09/0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc January 2009 Agenda Date: 2009-10-20 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0075r1 Submission January 2009 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc January 2009 Agenda Date: Authors:
Advertisements

Doc.: IEEE /0348r0 Submission March 2015 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 Proposed Tiger Team actions Date: Authors:
Doc.: IEEE /0510r1 Submission Apr 2015 Andrew Myles, CiscoSlide 1 IEEE 802 JTC1 statement for IEEE 802 EC review of subgroups 10 April 2015 Authors:
Doc.: IEEE r0 Agenda July 2013 Marc Emmelmann (FOKUS)Slide 1 Report on the TGai Berlin AdHoc in July 2013 Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE /0642r0 Submission May 2008 Jesse Walker, Intel CorporationSlide 1 IEEE JTC1 Ad Hoc Mid-Week Status May 2008 Date:
Doc.: IEEE /1041r2 Submission September 2008 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGv September Agenda Date: Authors:
Doc.: IEEE Submission March 2003 Carl R. Stevenson, Agere Systems Motion to Motion by: StevensonSeconded.
Doc.: IEEE /1444r4 Submission Jan 2013 Adrian Stephens, Intel CorporationSlide Jan 2013 Motions Date: Authors:
Doc.: IEEE /1224r1 Submission September 2008 Jesse Walker, Intel CorporationSlide 1 IEEE TGw October Agenda Date: Authors:
Doc.: IEEE /0765r0 Submission July 2005 Jesse Walker (Intel Corporation) Slide 1 Motion Move To form an IEEE Study Group to receive WLAN.
Doc.: IEEE /0225r0 Report and Minutes March 2005 Pat R. Calhoun, AirespaceSlide 1 Report of TGv – March 2005 DATE: January 205 Author(s) NameCompanyAddressPhone .
Doc.: IEEE /0795r2 Submission July 2014 The China NB contributed a variation on the “usual comment” on IEEE China NB comment on
Doc.: IEEE /0456r0 Submission April 2008 Jesse Walker, Intel CorporationSlide 1 Geneva JTC1/SC6 Liaison Report Date: Authors:
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /2448r0 Submission September 2007 Ganesh Venkatesan (Intel Corporation)Slide 1 Waikoloa Report Date: Authors:
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
Doc.: IEEE /0858r0 Submission July 2008 Jesse Walker, Intel CorporationSlide 1 IEEE 802 Presentation for Xi’an Meeting Date: Authors:
Doc.: IEEE /1149r0 Submission November 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Chair’s Opening Report Notice: This document has been.
Doc.: IEEE /0173r0 Submission Jan 2010 Andrew Myles, CiscoSlide 1 Closing Report Date: Authors:
Doc.: IEEE /0355r0 Submission Mar 2010 Andrew Myles, CiscoSlide 1 JTC1 ad hoc March 2010 agenda 5 March 2010 Authors:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0680r0 Submission May 2008 Jesse Walker, Intel CorporationSlide 1 IEEE JTC1 Ad Hoc Closing Report Date: Authors:
Doc.: IEEE /0013r0 Submission January 2009 Stephen McCann, RIMSlide 1 TGu Motions Date: Authors:
Doc.: IEEE /1041r1 Submission September 2008 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGv September Agenda Date: Authors:
Doc.: IEEE /0667r1 Submission aa – Robust Audio Video Transport Streaming San Francisco Opening Report Date: Authors: July 2009.
Doc.: IEEE /0667r0 Submission aa – Robust Audio Video Transport Streaming San Francisco Opening Report Date: Authors: July 2009.
Doc.: IEEE /1444r1 Submission Jan 2013 Adrian Stephens, Intel CorporationSlide Jan 2013 Motions Date: Authors:
IEEE TGw March Agenda Date: Authors: May 2008
IEEE 802 Process for Interactions with ISO/IEC JTC 1/SC 6
JTC1/SC6 Chair’s Closing Report
IEEE 802 JTC1 Standing Committee formalization proposal
802.11F Meeting Report March 2001 Month 1998 doc.: IEEE /xxx
JTC1 Chair’s Opening Report
IEEE 802 Process for Interactions with ISO/IEC JTC 1/SC 6
IEEE 802 JTC1 Standing Committee July 2018 opening report for EC
JTC1 Milestones Completed all work scheduled for Cairns meeting
IEEE TGw May Closing Report
JTC1 Chair’s Closing Report
IEEE JTC1 Ad Hoc March Agenda
IEEE TGw September Agenda
IEEE JTC1 Ad Hoc Mid-Week Status May 2008
JTC1 Ad Hoc November Agenda
IEEE 802 JTC1 Standing Committee Mar 2017 closing report
JTC1 Ad Hoc January 2009 Closing Report
IEEE JTC1 Ad Hoc March Agenda
JTC1 Ad Hoc July 2009 Closing Report
IEEE 802 Process for Interactions with ISO/IEC JTC 1/SC 6 & 7
IEEE 802 JTC1 Standing Committee LS Recommendation
Video Transport Streaming SG Orlando Opening Report
July 2018 doc.: IEEE r0 July 2018 PAR Review SC - Meeting Agenda and Comment slides - July 2018 – San Diego Date: Authors: Jon.
JTC1 Chair’s Opening Report
Motion Booklet for IEEE TGbc
TGu Motions Authors: March 2010 Date: March 2010
TGu Teleconference Motions
JTC1 ad hoc closing report (May11)
JTC1 Ad Hoc November Agenda
IEEE TGw November Agenda
IEEE TGw January Agenda
IEEE TGw July Agenda Date: Authors: July 2008
JTC1 Chair’s Closing Report
IEEE TGv November 2010 Agenda
May 2008 Closing Plenary Motions
IEEE 802 JTC1 Standing Committee Mar 2017 closing report
Future of the JTC1 Ad Hoc Date: Authors: May 2009
Future of the JTC1 Ad Hoc Date: Authors: May 2009
IEEE JTC1 Ad Hoc Closing Report
JTC1 Ad Hoc November Closing
TGaf Waikoloa Closing Report
Presentation transcript:

doc.: IEEE /0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc January 2009 Agenda Date: Authors:

doc.: IEEE /0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 2 Abstract This presentation contains the IEEE JTC1 Ad Hoc agenda, motions, and straw polls for March 2009.

doc.: IEEE /0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 3 JTC1 Ad Hoc Agenda Tuesday 8:00 – 10:00 –Call to Order –Roll Call –Select recording secretary –Modify and approve Agenda –Chair’s Welcome, Status, Review of Objectives –Review outcome of progress since January 2009 meeting –Develop positions and next steps –Recess until 08:00 Thursday (estimated time) Attendance reminder: **for each timeslot*** (Documents: Thursday 08:00 – 10:00 –Call to Order –Roll Call –Select recording secretary –Develop positions and next steps to recommend to WG and 802 LSMC –Motions to the WG, as needed –Adjourn

doc.: IEEE /0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 4 Motion Move to adopt the agenda in this submission. Mover: Seconder: Result: by unanimous consent

doc.: IEEE /0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 5 JTC1 March Meeting Status Since the January Meeting –Incorporated comments from Paul Nikolich/Geoff Thompson into document to respond to liaison request from SC6 –Review of 11-09/0207r0, 11-09/208r0, 11-09/209r0 from SC6 –Discussion of FDIS fast track process with IEEE Staff (Jodi Haasz) Meeting Objectives for Vancouver –Ratify liaison letter 11-09/0168r4 –Develop response to 11-09/207r0, 11-09/208r0, and 11-09/209r0 –Decide whether to progress to fast track

doc.: IEEE /0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 6 Submissions

doc.: IEEE /0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 7 Notes Do we need to find a forum to respond to China’s assertions that there are structural problems in i? Consensus of group is to follow advice of IEEE staff and not progress IEEE to fast track at this time

doc.: IEEE /0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 8 Motion Motion: Move to request the WG to approve the following motion: Mover: Seconder: Result:

doc.: IEEE /0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 9 Straw polls Straw Poll: Yes: No: Abstain:

doc.: IEEE /0350r0 Submission March 2009 Jesse Walker, Intel CorporationSlide 10 May Meeting Planning Objectives –Develop further positions, as needed