32 nd meeting of the Expert Group on DA and IA for the ESI Funds Fiche No 37B Article 14(1) ESF Reg. Brussels, 15 January 2016.

Slides:



Advertisements
Similar presentations
Financial Instruments under the European Structural and Investment (ESI) Funds MS expert meeting 17 June 2013.
Advertisements

Fiche 5A Payment Application Fiche 5B Accounts 12th Meeting of the Expert Group on Delegated and Implementing Acts for the ESI Funds 28 June 2013.
European Union Cohesion Policy
© Shutterstock - olly Delegated Acts ESF Art 14.1 Expert Group on delegated and implementing acts 3 October 2013.
© Shutterstock - olly Simplification Cost Options Expert Group on delegated and implementing acts 3 July 2013.
European Territorial Co-operation Eligibility of expenditure for co-operation programmes Art. 17(1) ETC Regulation 16th meeting of the Expert Group on.
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 SEVENTEENTH MEETING OF THE EXPERT GROUP ON.
General questions from MS
Regional Policy Draft Guidance on ex-ante conditionalities Ad hoc expert meeting 6 March
Performance Framework
European Union Cohesion Policy
Research and Innovation Summary of MS questions on the Commission's proposal for DG Research & Innovation Research and Innovation Rules for Participation.
Funding Schemes. Legal and Financial Rules in the 7th Framework Programme PHOENIX Training Laulasmaa, 1 Sept 2007.
© Shutterstock - olly Simplification Cost Options Current use and perspectives June 2014.
ESIF Business Process and Simplification Nic Suggit Department of Communities and Local Government 24 April 2014.
30 th meeting of the Expert Group on DA and IA for the ESI Funds Fiche No 37 based on Fiche No 21 Article 14(1) ESF Reg. Brussels, 18 May 2015.
Reporting on financial instruments to the Commission under the Annual and Final implementation reports Directorate General for Regional and Urban Policy.
1 Eligibility: Simplified costs Lump sums grants Mathieu LEFEBVRE, Laurent SENS, ESF Coordination Unit DG Employment, Social Affairs and Equal Opportunities.
Risk analysis (UVER) Luigi Guerci. Public Investment Verification Unit (UVER) The organisational principles at the foundation of the management and control.
Guidance notes on the Intevention Logic and on Building a priority axis 27 September 2013.
Outlook on effective management of EU structural funds from to Vilnius.
Regional Policy Major Projects in Cohesion Policy Major Projects Team, Unit G.1 Smart and Sustainable Growth Competence Centre, DG Regional and Urban Policy.
Louis Vervloet, General director, ESF Agency Flanders
Expert group meeting on draft delegated act on the European code of conduct on partnership (ECCP) under cohesion policy
1 The simplified cost options: Flat rate for indirect costs, standard scale of unit costs and lump sums OPEN DAYS Workshop 06D06 – Simplification of Cohesion.
European Territorial Co-operation Eligibility of expenditure for co-operation programmes (Art. 17(1) ETC Reg. 18th meeting of the Expert Group on Delegated.
Joint Action Plans (Art CPR). …did we propose this new instrument? To focus more on outputs and results …do we believe it will work? Because focus.
Monitoring of financial instruments and provision of monitoring information to the Commission under the Annual and Final implementation reports António.
Regional Policy Management and control systems Draft Delegated Act Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 TWENTY-FOURTH.
Delegated act: use of flat rates for indirect costs in other Union policies 1.
Joint Action Plans (Art CPR). 2 Purpose of the presentation Present the “Joint Action Plan”, a potential approach on a management more focused on.
State of play of OP negotiations and OP implementation ESF Technical Working Group Luxembourg, 2 December
Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 June 2014 Financial Unit.
Major projects and revenue generating operations 11 th meeting of the Expert Group on Delegated and Implementing Acts for the ESI Funds 25 June
Draft model for the Annual and Final implementation report under the Investment for Growth and Jobs goal 12 th meeting of the Expert Group on Delegated.
Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Structured Dialogue Brussels, 19 September
Simplified Cost Options Impatto della semplificazione sulle attività dei controlli Francisco MERCHÁN CANTOS Direttore Audit DG EMPL Firenze, 21 novembre.
© Shutterstock - olly Simplified Costs Options (SCOs) The audit point of view.
Regional Policy Requirements and application of ARTICLE 55 Lisbon, 19 April 2013 Michaela Brizova DG REGIO.F1: Operational Efficiency.
© Shutterstock - olly Simplified Costs Options (SCOs)
Interreg annual meeting 2016 Brussels | 6 June 2016 Simplified cost options in Interreg CENTRAL EUROPE Luca Ferrarese | Interreg CENTRAL EUROPE Joint Secretariat.
Best practices related to procurement within a project (for part of the expenditure) implemented by the beneficiary itself (art. 67, par. 4 of Regulation.
Joint Action Plans (Art CPR). 2 Purpose of the presentation Present the “Joint Action Plan”, a potential approach on a management more focused on.
Simplified Cost Options: DG EMPL audit approach
Experiences from programming period Simplified costs
Leader ECA audit findings and possible simplification
Background Legal basis of the TA financing decision: Article 45 of Council Regulation (EC) No. 1083/2006 of 11 July 2006 laying down general provisions.
Marine Expert Group meeting Brussels, 6 November 2015
Mid-Term Review Package on the Multiannual Financial Framework (MFF)
ESF Technical Working Group Brussels, 10 October 2016
Performance Framework
Update on (draft) implementing acts (IA)
data to be recorded and stored in computerised form (DA)
ESF Technical Working Group Tallinn, 28 November 2017
Use of SCOs in the ESI funds: Survey of OPs 2017
Simplified Cost Options in the Netherlands
Simplified Cost Options
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Update on (draft) implementing acts (IA) and delegated acts (DA)
Cohesion Policy Financial Management
Management Verifications & Sampling Methods
Draft Delegated Act Financial corrections linked to the performance framework (Art. 20 of CPR) As amended after expert meeting on October 24, 2013 Veronica.
Model of Joint Action Plans
Youth Employment Initiative: technical issues
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
DG Employment, Social Affairs and Inclusion
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
European Territorial Co-operation
Implementing act on the model for the annual and final implementation report under the European Territorial Cooperation goal 12th Meeting of the Expert.
DG Regional and Urban Policy
Presentation transcript:

32 nd meeting of the Expert Group on DA and IA for the ESI Funds Fiche No 37B Article 14(1) ESF Reg. Brussels, 15 January 2016

Structure of the intervention 1. Overview of Article 14(1) ESF mechanism 2. The empowerment and the delegated act (DA) 3. The Czech Republic 4. Belgium

Part 1: Overview of Article 14(1) ESF mechanism

Article 14(1) ESF Regulation – Why? 14.1 a way to pre-approve Simplified Cost Options SCOs lead to reduced errors, less admin. burden, more focus on results. But – MS/Regions are wary of getting methodology wrong 14.1 gives legal certainty to the MS/region The possibility to apply different accounting practices to the beneficiary Greater scope to focus on results

Article 14(1) ESF Regulation Is relevant for all types of ESF operations (no minimum/maximum value). But: No cross-financing is allowed The COM will only consider assessing data set when the scheme is expected to cover more than EUR 1 million over the programming period.

Two main options for the coverage of costs with 14(1) ESF: All the eligible costs of the operation are covered and declared on the basis of Article 14(1) ESF (example 1) Part of the eligible costs are covered by Article 14(1) ESF (example 2)

Example 1 — an operation where all eligible costs are covered by Article 14(1) of the ESF Regulation Commission  Managing Authority Delegated act: EUR 700 / student who completes a training The expenditure included in a payment application sent to the Commission will be based on the justified indicator included in the DA. Managing Authority  Beneficiary The Managing Authority has four options for reimbursing the beneficiary: Option 1: the standard scale of unit costs (Article 14(1) of the ESF Regulation) is applied to the beneficiary Option 2: real costs are applied to the beneficiary Option 3: another SCO system is applied to the beneficiary Option 4: a combination of real costs and SCOs is applied to the beneficiary

Example 2– Basis for reimbursement linked to an operation where eligible costs are partly covered by a standard scale of unit costs under Article 14(1) of the ESF Regulation Commission  Managing Authority The payment application sent to the Commission includes: the operation’s direct staff costs, based on the justified indicator (delegated act: EUR 20/hour); the operation’s other direct costs, declared based on real costs; the indirect costs, declared based on a flat rate. Managing Authority  Beneficiary The Managing Authority should apply the same methodology: the operation’s direct staff costs should be based on the justified indicator (delegated act: EUR 20 / hour); the operation’s other direct costs should be declared based on real costs; the indirect costs should be declared based on a flat rate.

Part 2: The empowerment and the delegated act (DA)

Article 14(1) ESF Reg. The Commission may reimburse expenditure paid by MS on the basis of standard scales of unit costs and lump sums define by the Commission. The Commission shall be empowered to adopt DA (…) concerning the types of operations covered, the definitions of the standard scales of unit costs and lump sums and their maximum amounts, which may be adjusted according to the applicable commonly agreed methods, taking due account of experience gained during the previous programming period.

The empowerment means… While there is no obligation to act for the Commission… there is a strong political commitment from the Commission to support MS in implementing SCOs. Unit costs and lump sums included in the DA could be Designed by the Commission Based on data from the MS

Delegated Regulation 2015/2195 Made of two parts: 1. The main part applicable to all MS 2. The annexes (one per MS) 1.Sweden 2.France The DA will be amended when deemed necessary. The Czech Republic Belgium

The main part of the DA Articles 1 to 4 cover: Subject matter and scope Types of operations Definitions of standard scales of unit costs and lump sums and their amounts Adjustment of amounts

The Annex of the DA Is made of two parts: 1. Definition of standard scales of unit costs/lump sums 2. Adjustment of amounts

Part 3: The Czech Republic

Indicator 1: Created Places in Childcare Facility – PA 1

Indicator 2: Transformed Place in a children's group – PA 1

Indicator 3: Operating costs based on occupied places – PA 1

Indicator 4: Qualification of caregivers in a childcare facility – PA1

Indicator 5: Rent for facility

Part 4: Belgium (Flanders region)

Indicator 1: Individual Vocational Training with IBO – PA 1 and 3

Indicator 2: Vocational Training – PA 1 and 3

Please send your comments on the Fiche No 37b to By Thursday 21/01 cob at the latest. Thank you!