1 Ukraine Higher Education Final conference Kiev 12 November 2015 European Investment Bank 03/02/2016
2 European Investment Bank
Project 7 universities 147 buildings m2 of the surface to be refurbished The project’s objective is to improve the quality of teaching, learning space and academic research facilities at the seven universities while reducing the operating costs of the universities through energy efficiency and energy savings elements 03/02/20163 European Investment Bank
Current situation Deferred maintenance Critical technical conditions of the heating, ventilation and electric systems Air quality Waste of the energy and high maintenance costs due to low energy performance of buildings 03/02/20164 European Investment Bank
03/02/20165 European Investment Bank
Costs The total investment volume of the Programme has been estimated at some EUR 175m. The investments will include the refurbishment and modernization of research laboratories, acquisition and installation of research equipment, and in particular the rehabilitation of university facilities, with particular strong focus on energy efficiency measures. 03/02/20166 European Investment Bank
Financial structure Investment costs: Technical Assistance: 03/02/20167 European Investment Bank Finance Institution / donor Total (EUR m) EE component (EUR m) %Non EE component (EUR m) % EIB10163%6175%4050% E5P106%6% 12%00% Promoter5031%1013%4050% Total Finance Institution / donor Total (EUR m) EIB (EPTATF)0.5015% NIF (potential)2.7585% Total3.25
8 European Investment Bank Thank you for your attention! Gabriela Ciumac – Loan Officer European Investment Bank Lending operations in Neighbouring Countries Public sector - East Tel: /02/2016