10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009.
ILC Electron and Positron Sources Wei Gai for the ILC e- and e+ collaboration PAC review, 2012 KEK, Japan.
Linear Collider Positron Source and Central Integration Update N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
October 27, DESY TBR Central Region Integration Issues 1 Mark Palmer Cornell University.
Cost Impacts of two e- ML cycles at sqrt(s) < 250 GeV purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius,
Linear Collider Positron Source System Integration Jim Clarke, James Jones, Ian Bailey, Leo Jenner, James Rochford,Alexander Mikhailichenko, John A. Osbourne,
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
ILC undulator based RDR e+ source: Yields and Polarizations for QWT capturing and different drive beam energy: Wei Gai, Wanming Liu Argonne National Lab.,
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
10/9/2014LCWS14 : Accelerator : ADI / M. Woodley1 / 14 Status of ILC Decks.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
1 Report on the AAP Review Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Positron source beamline lattice Wanming Liu, ANL
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Ian Bailey Cockcroft Institute/ Lancaster University IWLC October 21 st, 2010 Overview of Undulator-Based Sources for LC.
An Overview of the ILC Cryogenic System Tom Peterson, Fermilab LCFOA at SLAC 1 May 2006.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Pictorial Damping Ring DC03 Layout (A. Wolski, M. Korostelev)
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
N.Solyak, RTMLLCWS’08, Chicago Nov.16-20, RTML progress 2008 Nikolay Solyak.
N.Solyak, RTMLLCWS'11, Sept.26-30, Granada 1 Nikolay Solyak, Valery Kapin FERMILAB * CERN RTML upgrade New design of ILC RTML in central integration region.
Linear Collider Positron Source System Integration Jim Clarke, James Jones, Ian Bailey, Leo Jenner, James Rochford, Alexander Mikhailichenko, John A. Osbourne,
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Baseline Technical Review – Central Region Accelerator Systems
Specifications for Central Region Layout
ILC-CR-0004 Main Linac extension: Implementation status
Integration Ideas for the Central Region Some old some new
RTML Design and Cost reduction Nikolay Solyak Fermilab
AD & I : BDS Lattice Design Changes
Accelerator Physics Technical System Group Review
Electron Source Configuration
Linear Collider Positron Source Update
ILC Cryogenics -- Technical Design Report Planning
Linear Collider Positron Source and Central Integration Update
Central Region Working Group
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Presentation transcript:

10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb

10/02/2011 Global Design Effort 2 Positron Source close out Positron Source is broken down into the following parts o Undulator Area Undulator Protection Undulator Matching Fast Abort Dump o Auxiliary Source o Target Area o Capture Area o ‘Positron Source’ Dogleg o Transfer Line (PTRAN 1 and 2) o 5GeV Booster o Positron Line Transfer (PLTR) Spin Rotation Energy Compression

10/02/2011 Global Design Effort 3 Positron Source close out Each section has a list of: – Work done, –Improvement suggestion and –Work to be done There are 2 documents pertinent to this work: –Document list – contains the majority of documents used to perform the work –ILC Central Integration Close Out report – provides an overview of the work done for the Central Integration task

10/02/2011 Global Design Effort 4 Positron Source – General View Positron Source side of ILC including BDS, RTML, Positron Source and Damping Ring extract End of Main LINAC I.P. Undulator Area Positron ‘Production Area’, incl. AUX Source, Target, Capture, 400MeV Pre-Accelerator and ‘Positron Source’ Dogleg Fast Abort ‘smudge’ PTRAN 1 5GeV Booster Tune-up ‘smudge’ PTRAN 2 PLTR ‘smudge’ Damping Ring extract ‘smudge’

10/02/2011 Global Design Effort 5 Positron Source – Undulator Protection Model created using the lattice design from 09/09/2009 (Positron Source – SB2009 simplified.xlsx) End of Main LINAC Costing is based on specified magnets (SB2009 CostsV2a.xls) and Magnets_uberSummary_allStyles and vacuum_Positron_source_vacuum _cost_estimate_04_Nov_2009.xlsx Heat – Power load estimate (Positron Source Global Heat Load Summary.xlsx) based on ILC Magnet Power Supply List.xls and other magnet data available This area can be optimised according to in conjunction with the Fast Abort Dump. These sections have been ‘copied’ from the RDR Tune-Up line and undergone an initial optimisation process.

10/02/2011 Global Design Effort 6 Positron Source – Undulator Matching Model created using the lattice design from 09/09/2009 (Positron Source – SB2009 simplified.xlsx) Costing is based on specified magnets (SB2009 CostsV2a.xls) and Magnets_uberSummary_allStyles and vacuum_Positron_source_vacuum _cost_estimate_04_Nov_2009.xlsx Heat – Power load estimate (Positron Source Global Heat Load Summary.xlsx) based on ILC Magnet Power Supply List.xls and other magnet data available This area can be considered complete. There may be a change in position (relative to I.P.) due to BDS optimisation.

10/02/2011 Global Design Effort 7 Positron Source – Fast Abort Model created using the lattice design from 09/09/2009 (Positron Source – SB2009 simplified.xlsx) Costing is based on specified magnets (SB2009 CostsV2a.xls) and Magnets_uberSummary_allStyles and vacuum_Positron_source_vacuum _cost_estimate_04_Nov_2009.xlsx Heat – Power load estimate (Positron Source Global Heat Load Summary.xlsx) based on ILC Magnet Power Supply List.xls and other magnet data available This area must be revised. Some criteria to bear in mind are the shielding requirement and separation from Undulator section.

10/02/2011 Global Design Effort 8 Positron Source – Undulator Model created using the lattice design from 09/09/2009 (Positron Source – SB2009 simplified.xlsx) Costing is based on information supplied by RAL colleague and includes Cryo and Power supply Heat – Power load estimate (Positron Source Global Heat Load Summary.xlsx) established from information supplied by RAL colleagues The Undulator area has been extended to an effective 235m (306m physical) and the magnet length (at end of 3 Undulator string) increased. The Undulator prototype is now not far of completion). See: _-_7th_Positron_Source_Meeting_-_DESY_-_4m_module_-_Owen_Taylor.ppt

10/02/2011 Global Design Effort 9 Positron Source – Dogleg Model created using the lattice design from 09/09/2009 (Positron Source – SB2009 simplified.xlsx) Costing is based on specified magnets (SB2009 CostsV2a.xls) and Magnets_uberSummary_allStyles and vacuum_Positron_source_vacuum _cost_estimate_04_Nov_2009.xlsx Heat – Power load estimate (Positron Source Global Heat Load Summary.xlsx) based on ILC Magnet Power Supply List.xls and other magnet data available The dogleg provides a 1.5m beam offset. For the 10Hz low energy operation this must be revised. An Additional beam line is required and a 5Hz switching magnet. See 10HZ Low Energy Operation.pptx Photon Beam pipe 40m Drift

Switched Mode 10 To IP Undulator BDS High Power Dump 150 GeV Electron Transport to Dump (Switched Mode) Switching Magnet (5 Hz) Jim’s 10Hz proposal:

10/02/2011 Global Design Effort 11 Positron Source – AUX Source Model created using KAS Layout.pdf (Axel’s e- source basis) Costing is based on specified magnets (SB2009 CostsV2a.xls) and Magnets_uberSummary_allStyles and vacuum_Positron_source_vacuum _cost_estimate_04_Nov_2009.xlsx and ML info. Heat – Power load estimate (Positron Source Global Heat Load Summary.xlsx) based on ILC Magnet Power Supply List.xls and other magnet data available. Cryomodule data from ML 989 Criteria All LCW NOV 27B 2006 Updated Oct pdf The AUX source is at this moment in time not much more than an artists impression. The lattice needs to be designed. It is feasible to utilise the photon vacuum vessel and the distance to the target needs to be defined. 40m Drift

10/02/2011 Global Design Effort 12 Positron Source – Target Area The Target Area has seen a lot of work during Positron Source workshops. The remote handling enclosure is not shown. The target requires a redesign to cater for the AUX source. Latest workshop info: 40m Drift Photon Collimator Target QWT Standing Wave Accelerator (SLAC model )

10/02/2011 Global Design Effort 13 Positron Source – Capture Area An additional Electron Dump is required due to the AUX source. The lattice needs to be designed as the illustration is a re-arrangement of the RDR layout (400 MeV in middle of chicane). 40m Drift Photon Dump End of Positron Source Dogleg Capture Chicane 400MeV Travelling Wave Accelerator Electron Dump

10/02/2011 Global Design Effort 14 Positron Source – PTRAN 1 Again, this area is a best guess as far as CAD is concerned. The Positron Transfer (PTRAN1) is the same as the RDR where a Quad is followed by a drift. Lattice needs to be designed. PTRAN 1 End of Positron Source Dogleg Electron BDS 400MeV Travelling Wave Accelerator Tune Up dump or diagnostics required after 400MeV? No info

10/02/2011 Global Design Effort 15 Positron Source – End PTRAN1 – 5GeV Booster The lattice needs to be designed. The 5GeV Booster section can still move up or down the beam line (PTRAN). Tune Up Dump Mattison magnets (e- BDS) Currently 60 Magnet – Drift strings Cryomodule info from Main LINAC WG for cost and Power/Heat Load estimates Tune Up Dump branch off (e-BDS) 5GeV Booster start

10/02/2011 Global Design Effort 16 Positron Source – 5GeV Booster End The lattice needs to be designed. The 5GeV Booster section can still move up or down the beam line (PTRAN). Currently shown just upstream of e-BDS Tune up dump for radiation and CF&S reasons. Cold Box at each end of a 11 Module string Tune Up Dump (e-BDS) Tune Up Dump sweepers(e-BDS) 5GeV Booster end e-BDS

10/02/2011 Global Design Effort 17 Positron Source – End PTRAN2 The lattice needs to be designed. Depending on the 5GeV Booster location, it is envisaged to have 118 magnet – drift strings. RTML for illustration Currently 118 Magnet – Drift strings Positron Transfer Branch point, worked out from DR Injection point and offset and angle multiple (Spin Rotation). PTRAN Dump e-BDS RTML for illustration

10/02/2011 Global Design Effort 18 Positron Source – PLTR The lattice needs to be designed. This area is a pure guesstimate and place holders have been used for the cost and Power/Heat load estimates. Elevator from 1.1m to 2.4m Energy Compression RTML illustration Spin Rotation Damping Ring Septums, Injection Point at Z= -80.9m and X= 90m

10/02/2011 Global Design Effort 19 Positron Source notes Notes to accompany slide numbers: Slide X, comment