SJDAdvisory Committee May 20061 Production & Maintenance Steven J. Durand May 2006.

Slides:



Advertisements
Similar presentations
Meeting & Exceeding Customer Expectations 2130 South Industrial Park Avenue Tempe, AZ (480) Fax (480)
Advertisements

Unlocking the Mystery of Circuit Board Failures A Case Study Presented By: Alaa Arif EDTC 560 January 15, 2007.
On-Site Services Spectrum BioScience … –Saves you time by Doing routine tasks non-core related –Saves you money… Connects you to researched sources of.
BHEL – Electronics Division, Bangalore
Procurement Part One Marketing Logistics. Procurement or Purchasing Purchasing: actual buying of materials and services. Procurement: process-oriented.
Forging new generations of engineers. Engineering Career Pathways.
INDUSTRIAL & SYSTEMS ENGINEERING
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
S Changes and Procedures
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
The Millennia Group  A vertically integrated electronics manufacturing organization providing Tier 1 capabilities to medium-sized OEMs:  Millennia Design.
MATERIAL HANDLING: PRINCIPLES & EQUIPMENT DESCRIPTION
Components of an Automated Manufacturing System
FOLUNGWIN - The New Wave! Folungwin in HK in ’89 & moved to China ‘93 The number One manufacturer of wave & reflow Over 800 Employees Over 80 Wave & 100.
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified
PC Maintenance: Preparing for A+ Certification Chapter 2: Safety and Preventive Maintenance.
SJDLO/IF/FO - May 19-20, Production & Maintenance Steven J. Durand Thursday - May 20, 2004.
Marketing Operations Financials Instructions Delete this slide and the next one from your final presentation. Delete instructions & blue type from the.
Designing Goods and Services and Process Selection
U.S. customer service and design support with Asia manufacturing. U.S. customer service and design support with Asia manufacturing. The Tecate Advantage:
Layout Strategy.
From Research Prototype to Production
Chapter 13 Inventory Systems and Supply Ordering Copyright © 2011, 2006 Mosby, Inc., an affiliate of Elsevier. All rights reserved.
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
1 Safety and Preventative Maintenance. 2 MB, One megabyte - MB or M-byte - represents about 1 million (10 6 ) bytes. Precisely, 1 MB = = 1 kB x 1 kB =
Introduction to Materials Management
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
Manufacturing is the changing of raw or processed materials into usable products. Manufacturing occurs in manufacturing plants, or factories.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
Software you can depend on.. O&M Software: The Solution to Data Management Presented by: B.J. Yoder Technical Support Specialist AllMax Software, Inc.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Computerized Manufacturing Systems
MANUFACTURING VOCATS 7.O5. MANUFACTURING is A system or group of systems used in the manufacturing process to make products for an end user.
Designing Goods and Services and Process Selection Chapter 3.
Southwold Enterprises Co.,Ltd. An outsourcing partner committed to your company.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
 Traditional concept of warehouse as store or go down  Development of modern concept of warehouse as facility Traditionally, consumer maintained his.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Designing Goods and Services and Process Selection
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
Aeronautical drafters prepare engineering drawings that detail plans and specifications used in the manufacture of aircraft, missiles, and related parts.
Network of Suppliers warehouses, operations, warehouses, distribution centers, retail outlets, and customers. Supply Chain.
Reliability Applied to KM3NET
1 Managing Operations Operations - Essential 33% budget for programming 70% maintenance 30% new development 10% administration 57% operations.
Chapter 11 Selecting the Best Alternative Design Strategy Modern Systems Analysis and Design Third Edition 11.1.
Designing Goods and Services Chapter 3, Part 1. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
ISO 9001:2008 Certified CJK Manufacturing is a professional team of thermoforming and package engineering experts for industrial, retail, electronics,
Warehousing or Direct Shipment Which one is better for your school system.
Future LBO Developments
Base Maintenance Contract (BMC) Industry Day Participants
IC3 GS3 Standard COMPUTING FUNDAMENTALS Module
Data Communication & Networking in Manufacturing System
Hailo US Tower Equipment Manufacturer
AS/RS (Automated Storage/Retrieval System)
XC Developed for a Better ISP Solution
Components of an Automated Manufacturing System
Tour of the Facility Clean Organized Facility And Latest Equipment
Jerry-Ann L. Oluya BEN-32.   Scheduling is to establish the timing of the use of equipment, facilities, and human activities in an organization. The.
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Production & Maintenance
Budget, Schedule, Contingency
Insert Product Photograph Here
L&V Manpower Development Prepared by: HR department Mar, 2013
“Your single source solution to component distribution”
The Survival Plan.
Presentation transcript:

SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006

SJDAdvisory Committee May Electronics Division Manufacturing Goals Out-source board assemblies Build modules in-house as needed Ready the facility for manufacturing ESD protected facility Production success stories

SJDAdvisory Committee May Outsource Circuit Cards - Board Vendor Provides: Fully assembled boards/cables Some assemblies tested –Flying probe tests – NRAO test fixtures ESD packaged and labeled Scheduled deliveries Hazardous chemical handling

SJDAdvisory Committee May In-house Module Assembly Preparation Trained staff Same team that built the prototypes Complete assembly drawings New soldering stations Test equipment & computers in place

SJDAdvisory Committee May Planning for Small Production Runs Goal is to produce 28 identical antennas Small quantity builds, 5-10 at a time In-house module assembly and test VLBA cable and small parts assembly

SJDAdvisory Committee May Inventory Control New and old warehouse managed by Skip Lagoyda, Business Manager Control of high dollar items PeopleSoft software re-order mechanisms

SJDAdvisory Committee May CDL / EVLA Coordination

SJDAdvisory Committee May Attributes of In-house Module Assembly Minimize module storage problems Tight engineering control Improve the design Fast turn-around time Distributed parts inventory

SJDAdvisory Committee May ESD Preparation 12 ESD stations including floor mats ESD totes and parts bins ESD shoes and wrist straps Humidity controlled facility

SJDAdvisory Committee May Solder & Flux Compatibility, and Quality Issues Trained staff Some components only available in lead-free. Can be used with ‘leaded’ solder. May require higher soldering temperatures, 20 to 30 degrees higher (Fahrenheit).

SJDAdvisory Committee May Mother Board Approach More robust design Easy to assemble

SJDAdvisory Committee May MIB Quality 1400 MIBs required for the project 34 in each antenna - in every type of module Turn-key solution –Large quantity buys lowered price per board –100% flying probe – 100% electrical test –99% yield (last run of 100 boards)

SJDAdvisory Committee May Design for Manufacturability 300 pin transponder Easy assembly 10GHz circuits Changed vendor to save $400K without a design change

SJDAdvisory Committee May Conclusion Ready to maintain production schedule Looking for cost savings Utilized every NRAO asset Manufactured for a 20 year life