Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.

Slides:



Advertisements
Similar presentations
Edoardo Cardelli – Dipartimento di Fisica – Università di Cagliari Università degli Studi di Cagliari Dipartimento di Fisica Detector Quality Control Edoardo.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Resistive Plate Chambers for CMS (Pre-assembly Jobs done at BARC) Archana Sharma, Suman B.Beri P.U, Chandigarh & L.M.Pant BARC, Mumbai.
7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
CMS - PAVIA1 Engineering Design Review RPC - BAKELITE.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
G.Bencivenni LNF-INFN, GEM Training Session – CERN, 16, Feb THE LHCb EXPERIENCE WITH THE ASSEMBLY OF THE GEM (*) G. Bencivenni LNF - INFN Italy.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano 2, P. de Simone 1, F.Murtas 1, D.Pinci 3, M. Poli-Lener 1, D. Raspino 2 and B.Saitta.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Test Beam the μ-RWELL Test Beam the μ-RWELL G. Bencivenni (a), R. de Oliveira (b), M. Gatta (a), G. Felici (a), G. Morello (a), M. Poli Lener (a) (a),
Construction and first commissioning of the self-stretched gas electron multiplier (GEM) detector J. Twigger, V. Bhopatkar, J. Wortman, M. Hohlmann 77th.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Plans for MPGD Radiation hardness tests for full detectors and components Matteo Alfonsi,Gabriele Croci, Elena Rocco, Serge Duarte Pinto, Leszek Ropelewski.
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
30 October 2003V.Souvorov / B.Schmidt - MWPC PRR CERN site1 MWPC Aging Studies Outline: Overview of aging tests done Results in terms of gain variations.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
XI Workshop on Resistive Plate Chambers and Related Detectors, INFN, 5-10 February, Aging test of high rate MRPC Wang Yi Department of Engineering.
Carlo Gustavino INFN-LNGS On behalf of the OPERA RPC group IX International Workshop on Resistive Plate Chambers and Related Detectors Mumbai, February.
Leaks in box 2 Inside of box 2 has been cleaned from wax
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
Ti/SS transitions A.Basti INFN-PISA*
Quality Control Chamber Production
Production ad Quality control of RPCs for the CMS muon barrel system
Quality Control in Straw Production
Performance of an Automated Water Based Cooling System for CBM MuCh
On behalf of the GEMs for CMS Collaboration
Development of Gas Electron Multiplier Detectors for Muon Tomography
(On Behalf of CMS Muon Group)
Presentation transcript:

Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector concern:  Gas chamber leakage  Gain uniformity with X-ray

Checks on panels All panels will be checked for planarity with a 3-D machine at LNF. The measure will be performed on a grid of 35 points. The planarity requirement is ≤ 50 µm 3-D machine Preliminary measurements have been done on the panel pre-production resulting better than 30 µm

GEM foil HV test: conditioning (I) All GEM foils are tested before frame gluing in order to check their quality. The test, sector by sector, is performed in a gas tight box. The voltage to each GEM sector is applied through a 500 M  limiting resistor in order to avoid GEM damages in case of discharges. N 2 Flow The gas tight plexiglass box is flushed for about 1 hour with nitrogen in order to reduce the humidity < 5%, before the GEM test humidity probe HV supply R= 500 MH 

GEM foil HV test: Conditioning (II) Voltage is applied on each sector (18 steps): 1.50 V up to 400 V (  20 s) V up to 500 V (  1 min) V up to 600V (  2 min) acceptance requirements: leakage current < 2nA AND # of discharges <3 The GEM sector pass the step Yes the voltage ramp-up on the sector is suspended and the test will be repeated later No Test duration  3 hours  with two test stations: up to 4 GEM foils/day

This procedure has been tuned on a pre-production of 11 GEM foils GEM foil HV test: conditioning (III) The average number of discharges per sector on the whole procedure comes out to be. If the test is repeated a second time, the total number of discharges goes down to. This behaviour could be due to microscopic dust that are softly burned with high voltage and then removed from the GEM surfaces by N 2 continuous flow. Number of discharges 1 st HV tour 2 nd HV tour Histograms are filled with the total number of discharges occurred in each sector during ramp-up (18 HV steps)..

Ambient parameters (T and P) are monitored with additional sensors Gas leak test (I): system set-up Both test and reference chambers are inflated in parallel, up to an overpressure of  5 mbar. The difference between  P(S1) e  P(S2) measures the gas leak rate of the test chamber Test duration  2 hour foam box for thermal insulation N2N2 Ref chamber S1S2 T, P Chamber to test P atm The gas leak rate measurement of a chamber is generally referred to that one of a reference chamber (same volume, “no leak”) in order to take into account atmospheric pressure and temperature variations.

Gas leak test (II): procedure to define reference chamber <1 mbar/day Equal value of T/p The fitted points at equal T/p give the leak rate of the chamber <1 mbar/day. This allows to keep humidity under 100 ppm V with a 100 cc/min gas flow. The gas leak rate is obtained measuring the gas over pressure  p inside the chamber looking at time periods with equal T/p value. The red band represents the instrument sensitivity (  (T/p)  3x10 -4 ). Time (min) T/p (°K /mbar )  p (mbar)

Collimator diameter  5 mm X-ray test(I): system setup The gain uniformity, pad by pad, is measured with a high intensity 5.9 keV X-ray tube Gas humidity and temperature are monitored with a probe mounted on the gas line outlet. Also atmospheric pressure is recorded X-Y plane moved with step-motors Test duration: 16 hours

A gain uniformity < 12% (with edge effects, 6% without) X-ray test(II): measurements The current signal induced on the single pad is read-out with a current- meter (nA sensibility) and it is corrected for T and p variations Due to effective beam spot in the border pads