A vision for the Bulgarian waste sector National Waste Work Shop Plovdiv, 24 November 2008 Carsten Rasmussen Deputy Head of Unit European Commission DG.

Slides:



Advertisements
Similar presentations
Directorate-General for Regional Policy EUROPEAN COMMISSION Cohesion Policy and the water sector Eddy Hartog Head of Unit, DG REGIO EU Sanitation Policies.
Advertisements

Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
Waste Management in Estonia Future Challenges
Performance Based Climate Finance Facility (PBC) Alejandro Miranda Velazquez Latin American and Caribbean Forum Carbon (LACCF) 2014 Bogotá, September.
May 2005 The French Water Services: Main present challenges.
CLIMATE CHANGE – WATER SECTOR HIGH-LEVEL CONFERENCE ON WATER, CLIMATE AND HEALTH First International Forum on Development, Environment and Health Arezzo,
INTEGRATED PLANNING: THE LINKS BETWEEN URBAN WASTE MANAGEMENT, SANITATION AND ENERGY.
HIGHLIGHTS OF GHANA’S ENVIRONMENTAL FISCAL REFORM POLICY (WIP) Presented by: Ebenezer Nortey (Ministry of Finance) at UNEP Regional Workshop on Inclusive.
Progress on developing, preparing and financing environmental investment projects REPUBLIC OF MACEDONIA.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Support for programme and project development: JASPERS and ELENA Ralf Goldmann EMA network Meeting
Sustainability and ICSR. FIETS: Financial Institutional Ecological Technological Social.
How the European Social Fund can contribute to social enterprises? Workshop 7: Structural funds (ESF, ERDF) for social enterprises Strasbourg, 16 January.
   EBRD - Water Project Identification, Financing Approach and Donor Coordination in Central and Eastern Europe European Bank for Reconstruction and.
JASPERS – EBRD Role. EBRD Role in JASPERS Partner in JASPERS together with EIB and EC, member of JASPERS Steering Group Provide 5 to 8 staff years input.
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
Financing Urban Public Infrastructure
Financing Growth and Cohesion in the enlarged EU 24 November 2005 Financing urban actions and sustainable communities Financing urban actions and sustainable.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
ATLANTIC STRATEGY and EU Cohesion Policy
FINANCIAL AND REAL ECONOMY CRISIS AND STATE AID The case of Lithuania Jurgita Ratkeviciute Head of State Aid Division Competition Council.
REGIONAL POLICY EUROPEAN COMMISSION The EU Recovery Plan and the proposal amending the European Regional Development Fund Regulation.
MUNICIPAL SOLID WASTE MANAGEMENT IN ROMANIA “Achievements and Barriers” Dr.eng. Alexei Atudorei ISWA Board Member Representative of ISWA - RDN Southeast.
SME Flagship Initiative The Eastern partnership response to SME needs Oct 1st 2010 S. Marinelli DG RELEX D1 ENP – General Coordination European Commission.
National financing tools for local environmental infrastructure Emil Savov Deputy Executive Director National Association of Municipalities in Bulgaria.
EN Regional Policy EUROPEAN COMMISSION Innovation and the Structural Funds, Antwerp, 16 January 2007 Veronica Gaffey Innovative Actions Unit.
1 Mirjana Papafava, M. Econ. Head of Economic Incentives Department Ministry of Environmental Protection and Physical Planning Republic of Croatia Environmental.
JESSICA Holding Fund for Mazowieckie Voivodship Steps towards establishing Urban Development Funds Preparation of urban development projects European Investment.
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen May 2008.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Public Responsibility and Resource-Efficiency 27 September 2012 Economic and Social Committee Erik de Baedts President.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
Promoting Partnerships between Public and Private EPEC PRIVATE SECTOR FORUM Jean-Claude Banon Chairman of BUSINESSEUROPE’s Services of General Economic.
1 Workshop of the Ministry of Finance of the Czech Republic How to use European funds within a PPP project? Jana Maláčová Ministry for Regional Development/
Ukraine In-Depth Energy Efficiency Review VI International Specialized Trade Fair “ENERGY EFFICIENCY RENEWABLE ENERGY – 2013”, Kiev, 8 November 2013 Steivan.
GEF and the Conventions The Global Environment Facility: Is the financial mechanism for the Stockholm Convention on Persistent Organic Pollutants the.
13 February 2013, Bishkek Honma Masaru Director for Central Asia, EBRD © European Bank for Reconstruction and Development 2010 | EBRD’s Activities.
3 rd Athens Process Forum /24, Sofia CEER WG SEEER – Regulatory Benchmarking Standards for SEE.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
« Performing Efficient Models of Administration Capacity and Regional Reform in the European Union» European Parliament 15 October 2008 Bruxelles Romanian.
Zero Waste International Alliance, Naples, Italy 19 th February 2009 Zero Waste in Central and Eastern Europe? Where does EU money go? Ivaylo Hlebarov,
SUNREF program – Sustainable Use of Natural Resources and Environmental Finance TISIF 2015.
The Reforms In The WSS Sector In Bulgaria Eng. Ivan Ivanov President Bulgarian Water Association.
The Cohesion Fund in Poland and the Selection System for Environmental Investments Andrzej Guła Institute of Environmental Economics – Poland CEE Bankwatch.
European Commission Regional Policy Report from Workshop 3: Infrastructure and Public-Private Partnerships 1.Why talk of PPPs? make projects affordable.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
REGIONAL CONFERENCE ON THE DEVELOPMENT OF NATIONAL INTELLECTUAL PROPERTY STRATEGIES Sibiu, June, 2012 Bulgaria - National IP Strategy Zdravka Gyozlieva.
Common Legal Basis for Transit Transportation The European Union ’ s Tacis TRACECA programme for Armenia, Azerbaijan, Bulgaria, Georgia, Kazakhstan, Kyrgyzstan,
The EU Water Initiative and the EU ACP Facility New Instruments to promote sustainable development of water resources and affordable access Antonio Garcia-Fragio.
European Regional Development Fund EUROPEAN UNION Investing in your future Operational programme „Development of the competitiveness of the Bulgarian economy“
1 EU ongoing activities and financial assistance on environment to CA countries Almaty, 11 June 2014 European Union-Central Asia 3d meeting of the Working.
TAIEX Workshop on Agricultural Advisory Services in the EU Kiev, Ukraine February 2016 Peculiarities of legal regulation of the advisory service.
CROATIAN EXPERIENCE IN OPERATING AN ENERGY EFFICIENCY FUND under the regime of the EED Article 7 Vesna Bukarica, Ph.D. Head of Energy Efficiency Sector.
Outcomes of the Namibia Water investment Conference Mr Abraham Nehemia Under Secretary for Water Affairs and Forestry 14 September 2012 Ministry of Agriculture,
TAIEX – REGIO Multi Country Workshop on management practices for environmental investments 8-9 December 2015, Vilnius Presentation by BULGARIA Ministry.
Western Balkans Climate Resilience Workshop, Vienna, 11 – 12 May 2016.
November 29th, 2013 AFD Presentation & focus on Financing of Water / IRWM projects David WILLECOMME
Feasibility study to use waste as fuel for cement factories
Д-р Роланд A. Брэдшоу степени MBA, MSc, CEng, MICE
ATLANTIC STRATEGY and EU Cohesion Policy
Association of providers of communal services in Republic of Macedonia - ADKOM Business planning in Macedonia – process starting as a request of the Regulator.
Michael Jacobsen, Project Director - Water 18 MaY 2017
The European Strategy for Circular Economy – Plastics Strategy and revised Waste Legislation Joanna Drake – Deputy Director-General DG ENV, European Commission.
EBRD Support for Water Sector Projects Arthur Schankler Senior Banker Priority Environmental Investment Programme (PEIP) National Workshop Belgrade,
27 November 2014 Mantas Sekmokas
progress of the water reform in bulgaria
EC approach towards financing infrastructure projects Dagmar KALJARIKOVÁ Policy Officer for Turkey, Montenegro, REC CEE and NGOs Unit for Enlargement.
WATER UTILITY REFORM PLAN
Bulgaria – Capital Budgeting And Fiscal Institutions
Public procurement and Infrastructure implementation risk management
Presentation transcript:

A vision for the Bulgarian waste sector National Waste Work Shop Plovdiv, 24 November 2008 Carsten Rasmussen Deputy Head of Unit European Commission DG Regional Policy

Content Requirements to a functional waste sector Caracteristics of EU waste systems Waste techniques  Incineration  Mechanical Biological Treatment  Refuse Derived Fuel  Landfilling State of play of the Bulgarian waste sector  Techniques  Waste organisation  Financing Conclusions and recommendations

Conformity with the acquis Sustainability Financial viability Timely implementability

Waste Techniques Choice of technique depends on financing and availability of potential land fill site Cost trend: Incineration Most costly  Costs Incineration Landfill and MBT Landfill

Caracteristics of EU Waste Systems  Waste reduction needed, preferably upstream  Variety of techniques available for waste treatment  Incineration  Mechanical Biological Treatment  Refuse Direved Fuel  Land filling  Systems partly revenue generating  Tariff financed (in Bulgaria: tax like)

Techniques: Incineration  Incineration most expensive, but attractive in densely populated areas  Energy recovery, yes, but high costs for environmental compatibility  Negative incentives to waste reduction

Techniques: Mechanical Biological Treatment  Attractive, as it allows to increase recycling and reduce land filling  But attention to workers’ health  Expensive, but modulable: Does everybody need a Rolls Royce?

Techniques: Refuse Derived Fuel  Attractive to avoid land filling  Linked to MBT  But expensive and dependant on incineration capacity (cement factories etc)

Waste techniques Landfilling  Least expensive  Limited investments up front  Should be combined with some form of MBT

Bulgaria: State of Play  Conformity required as from accession  Waste regions  7 conform  7 en route  7 to be prepared  Beyond Sofia, large part of the country de facto facing infringement procedure  Financing available: 363 million €, plus national co-financing

Bulgaria:Waste Organisation  Waste is municipal competence  Economies of scale available, hence trend towards multi- municipal co-operation  Need to avoid the Hungarian Cheese

The Hungarian Cheese

Bulgaria: Waste Organisation (continued)  Based on our experience, we recommend a minimum of top down incentives:  Legal obligation to co-operate  Or, financial incentive, e.g. financing exclusively available to regional projects  For regional systems, need for sound cooperation organisation  E.g. holding company, owning assets  Need to protect co-operation structure from break up  financial commitment from municipalities to common organisation  Need to careful organisation of operations – private operators, public operating company  Great potential (and some risks) linked to Public Private Partnership models

Bulgaria: Financing  Need for sustainable system  Hence tariff setting must include operation and replacement  The EU financing is only available once  Don’t come back with new requests in 7 years!  Please note: No EU co-financing ever made in this sector in Slovakia  EU plus state financing not sufficient in this period  Scope for municipal co-financing  EIB and/or EBRD loans could be available

Bulgaria: Financing (continued)  Need to consider total financing needs up front  Recommend budgetary allocation to each waste region, depending on needs  7,7,7  Need for fair and transparent model  Note: Article 55 of the regulation cannot serve as a method to establish a fair and transparent national grant system

Bulgaria: Financing (continued)  Recommend model with some local financing  Co-financing could be modulated according to:  Density (natural economy of scale) and GDP (affordability)

Bulgaria Techniques Considering: costs limited funding relatively low density of population Landfills with limited, but upgradable MBT seem the obvious choice

Conclusions and recommendations to Bulgaria  Projects elaborated based on regional budget allocations  Financing only available for regional projects  Land fill with source separation, limited but upgradable MBT realistic  EU, State, Municipal (EIB-EBRD loan financed)  Tariffs including operations, replacement (amortisation)