Doc.: IEEE 802.11-09/0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE 802.11 TGz Montreal Agenda Date: May 10, 2009 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to.
Advertisements

Doc.: IEEE /0693r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOKoden Techno Info.
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0726r0 Agenda June 2015 Dorothy Stanley, HPSlide 1 IEEE TGmc July 2015 Agenda Date: Authors:
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /1522r5 Agenda January 2016 Dorothy Stanley, HPESlide 1 IEEE TGmc January 2016 Agenda Date: Authors:
Doc.: IEEE /1522r0 Agenda January 2016 Dorothy Stanley, HPESlide 1 IEEE TGmc January 2016 Agenda Date: Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /1588r4 Agenda January 2015 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmc January 2015 Agenda Date: Authors:
Doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /0077r1 Submission May 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for May 2013 Notice: This document has been prepared to assist.
Doc.: IEEE /0382r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOAlliedtelesis R&D.
Doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:
TGv Closing Report March 2008
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IEEE TGz Vancouver Agenda
TGaf San Francisco Closing Report
TGz Los Angeles Closing Report
TGaf Waikoloa Closing Report
TGs San Diego Closing Report
TGz Closing Report Date: Authors: September 2007 Month Year
TGz Closing Report Date: Authors: September 2007 Month Year
TGae Closing Report – March 2010
IEEE TGz Hawaii Agenda Date: September 7, 2008 Authors:
TGae Closing Report – May 2010
TGs Atlanta Closing Report
TGz Beijing May 2010 Closing Report
TGs Waikoloa Closing Report
TGaf Geneva Closing Report
IEEE TGaf Waikoloa Closing Report
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
IEEE TGaf Dallas Closing Report
TGz Los Angeles Closing Report
TGaf San Antonio Closing Report
IEEE TGaf Singapore Closing Report
TGaf Waikoloa Closing Report
IEEE TGaf DRAFT Meeting Plan and Agenda
IEEE TGz Taipei Agenda Date: Authors: July 2007
IEEE TGz Taipei Agenda Date: Authors: July 2007
IEEE TGz Orlando Agenda
TGz Closing Report Date: Authors: November 2007 Month Year
TGz Closing Report Date: Authors: November 2007 Month Year
IEEE TGaf Palm Springs Closing Report
TGu Teleconference Motions
IEEE TGz Jacksonville Agenda
TGak November Closing Report
TGae Closing Report – July 2010
TGm Closing Report – May 2010
IEEE TGz Jacksonville Agenda
2019 March TGba Closing Report
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
TGz Closing Report Date: Authors: November 2007 Month Year
TGae Closing Report – July 2011
TGae Closing Report – January 2011
IEEE TGz Taipei Agenda Date: Authors: July 2007
IEEE TGmc January 2016 Agenda
TGaf San Antonio Closing Report
IEEE TGz Jacksonville Agenda
802.11af Liaison Report Date: Authors: January 2013
TGae Closing Report – November 2011
TGs San Diego Closing Report
IEEE aj May Closing Report
July 2009 Closing Report Date: Authors: July 2009
TGae Closing Report – September 2010
Presentation transcript:

doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:

doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, Qualcomm TGz Montreal Agenda Monday May 11 – pm2 –Approve Montreal agenda –Approve Vancouver minutes, Telecon minutes –LB 143 comment resolution z-tgz-lb143-draft40-comments.xls Tuesday March 10 – pm1, pm2 –LB 143 comment resolution Wednesday March 11 – am1 –LB 143 comment resolution Thursday March 12 – am1, pm2 –LB 143 comment resolution –Approve teleconferences –Adjourn Slide 2

doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, Qualcomm Motion 1 Approve TGz Montreal agenda in 09/0547r0 Move: Second: Result: Slide 3

doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, Qualcomm Motion 2 Approve TGz Vancouver minutes in 09/0329r0 and TGz telecon minutes in 09/0478r0 Move: Second: Result: Slide 4

doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, Qualcomm Motion 3 Approve TGz teleconferences –Tuesday, noon ET, 1 hour Move: Second: Result: Slide 5

doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, Qualcomm Motion 4 Approve comment LB143 resolutions – z-tgz-lb143-draft40-comments.xls Move: Second: Result: Slide 6

doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, Qualcomm Motion 5 Having approved comment resolutions for all of the comments received from LB143 on TGz Draft 4.0 as contained in document z-tgz-lb143-draft40-comments.xls, Instruct the editor to prepare Draft 5.0 incorporating these resolutions and, Approve a 15 day Working Group Recirculation Ballot asking the question “Should TGz Draft 5.0 be forwarded to Sponsor Ballot?” [Moved by Menzo Wentink on behalf of TGz] TGz vote: Moved:, Seconded:, Result: y-n-a Slide 7

doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, Qualcomm TGz Timeline Initial Working Group Letter Ballot: March 08 Re-circulation Working Group Letter Ballot: September 08 Form Sponsor Ballot Pool: December 08 Initial Sponsor Ballot: March 09 Re-circulation Sponsor Ballot: May 09 Final WG Approval: July 09 Final EC Approval: July 09 RevCom/Standards Board Approval: September 09 IEEE Publish: January 10 Slide 8