Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.

Slides:



Advertisements
Similar presentations
CRI- Common Review Initiative Reducing Lender Review Redundancy.
Advertisements

Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
THE NSF BUDGET Overview of Agency Funding Processes Presented by Beth Blue National Science Foundation Office of Budget, Finance, and Award Management.
1 CASIP-SMEs project Project & Financial and Management Committee Meeting Luxembourg, 15th November 2012 This project is funded by the European Union Provided.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
FAIR GmbH and FAIR Project History, Status and Outlook
State Milestones Subsidized Insurance Workgroup High Level Timeline 2011 Jan 2011 Feb 2011 Mar 2011 Apr 2011 May 2011 Jun 2011 Jul 2011 Aug 2011 Sept 2011.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
PLS 121: American Politics and Government The Constitution The Budget Making Process.
Montgomery County Transit Task Force Meeting August 17, 2011.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
«Tempus IV implementation: coordination, management, reporting» Anastasia Akhramovich Deputy head of International Department Omsk State Medical Academy.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
NEGOTIATION WORKSHOP DEMYSTIFY THE PROCESS OF COLLECTIVE BARGAINING 1.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Energy for the Future Belene Nuclear Power Plant Project Status.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Overview of Thesis Submission and Examination Helen Buckley, Research Student Administrator, Graduate Studies Office (GSO).
Report on TTonT By: Jan Rozema. Contents Historical overview Status (at PFAC-02) Terms of Reference How to go onward.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
Making every vote count. United States Election Assistance Commission EAC Voting System Certification TGDC Meeting December 9-10, 2009.
BIH VIS INTERNATIONAL COMMERCIAL ARBITRATION TRAINING OCTOBER 11-14, nd Annual Willem C. Vis International Commercial Arbitration Moot.
Prokurimi Publik në Kosovë Public Procurement System in Kosovo Public Procurement activities for 2011 Mr. Safet Hoxha, President of PPRC Mr. Ilaz Duli,
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
SUMMARY ON THE SPL STUDY COLLABORATION R. Garoby – 12/12/2008 First SPL Collaboration Meeting December, CERN.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
The CED’s & DED’s role in the Tenure & Promotion of Agents
Prof. dr. Giedrius Vanagas
Transnational training seminar for potential Lead Partners and Partners to INTEREGG IIIB-CADSES procedures for 3° call for proposal CADSES implementation.
Working Party on Noise (GRB) General information and WP.29 highlights
Informal document GRE-77-18
Nominations.
The Process of Call based Project Funding by BMBF
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
doc.: IEEE <doc#>
Outline of NCL Revision with NCLRMS
doc.: IEEE <doc#>
Memorandum of Understanding
SOCIAL DIALOGUE WITHIN EUPAN
SOCIAL DIALOGUE WITHIN EUPAN
TOP6 – WP4 Coordination and Management JPICH Coordination Office
PORTUGUESE PRESIDENCY MANDATE FOR SOCIAL DIALOGUE
doc.: IEEE <doc#>
Working Party on Noise (GRB) General information and WP.29 highlights
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Draft Mandate and Proposed Approach for the Drafting Group on
Informal document GRE-79-15
Informal document GRE-81-15
IEEE IMT-Advanced Review Process
Review of the 1958 Agreement
WIGOS regulatory and guidance material
Adult Education Survey Anonymisation Point 6
Working Party on Brakes and Running Gear (GRRF) General information
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Strategic Co-ordination Group May 2009
Presentation transcript:

Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil construction Outline:

Oct. 16, 20082CBM Collaboration Meeting, Dubna, Zbigniew Majka  16 th FAIR ISC meeting on May 14 th The Convention with its five Annexes and the Final Act were prepared and until September very few amendments to these documents were made.  18 th FAIR ISC meeting on September 3 rd The FAIR ISC lernt that on September 8 was scheduled a meeting between combined delegation of XFEL ISC and BMBF with the representatives of several Russian ministries, led by Dr V. V. Nichkov, Director at the Ministry of Education and Science of the Russian Federation. The objective of the meeting was to agree on the final versions the XFEL Convention and the Articles of Association. Russian Delegate informed FAIR ISC that the Russian Side would like to have the founding documents for both projects (the Convention, the Articles of Association) as close as reasonable.

Oct. 16, 20083CBM Collaboration Meeting, Dubna, Zbigniew Majka Letter to FAIR ISC from the Chairman Jacek Gierlinski, 11 th Sept ”......Simultaneously I have asked Prof. Ö. Skeppstedt, AFI Chairman to undertake the review of these documents at the AFI meeting on 22 nd September and prepare their final versions for approval by this Committee....” The FAIR JCT, with active involvement of the officials from BMBF, has come up with the modified versions of the FAIR Convention and the Articles of Association. The FAIR AFI delegates, at the meeting on 22 nd September agreed on these final legal documents and recommend them to FAIR ISC.for approval at the meeting on October 1 st 2008.

Oct. 16, 20084CBM Collaboration Meeting, Dubna, Zbigniew Majka Resolutions from 19 th FAIR ISC Meeting on Oct. 1 st, 2008: 7. Resolution concerning legal documents: The ISC approves the version of October 1 st, 2008 of the FAIR Convention, Articles of Association and the Final Act. The ISC urges all parties involved to initiate the necessary actions (translations (due by October 13, 2008) and formal checking of the founding documents) for the intended signing of the FAIR Convention and the Final Act in February 2009.

Oct. 16, 2008CBM Collaboration Meeting, Dubna, Zbigniew Majka5 Follow-up of the 19 th FAIR ICS Meeting Time table for the translation procedure 1October th meeting of FAIR-ISC: Adopted of founding texts (Convention, Articles of Association, Final Act), finalized at the level of the Steering Committee in the English language 13 October 2008 Absolute deadline for the submission to the BMBF of non-English versions of the founding texts (i.e. in Chinese, French, German, Italian, Russian, and Spanish); an earlier submission would be preferred 17 November 2008 Termination of the refinement and cross-checking of the various language versions by the Language Services Division of German Federal Foreign Office and dispatch to the Parties concerned 01 December 2008 Return of the various language versions counter-checked by the Foreign Offices of the Parties concerned

Oct. 16, 2008CBM Collaboration Meeting, Dubna, Zbigniew Majka6 15 December 2008 Dispatch of all language versions, now edited by the German Federal Foreign Office and the Foreign Offices of the Parties concerned, to all Parties January 2009 Cross-checking conference in the German Federal Foreign Office (Berlin) with the aim of producing the final and binding versions of the founding documents (to be initialled at the end of the conference) February 2009 Signing of the FAIR Convention and the Final Act in Berlin If any of the above translations shall not reach the German BMBF in time, it will be impossible to include the corresponding state in the first batch of signatories.

Oct. 16, 2008CBM Collaboration Meeting, Dubna, Zbigniew Majka7 Next FAIR ISC meetings: 11 November 2008 at GSI. 12 December 2008 in Paris. Next FAIR-AFI meeting: 21 November 2008 at GSI

Oct. 16, 2008CBM Collaboration Meeting, Dubna, Zbigniew Majka8 Mandate of FAIR ISC for accelerator construction: “Start pre-collaboration on dedicated FAIR accelerators” Kick Off Meetings on: SIS100, September 15, 2008 Super-FRS & CR, October 8 and 9, Conclusions from the meetings:  The participating partners are able, willing and prepare to realize their EoIs  The present Master Schedule (e.g. first experiments at Super-FRS in 2013/2014) is realistic if work starts in Jan  Taking up the work requires funds to the participating labs. As any in-kind contributor is funded by his agency directly:  no cross financing for in-kind contributions  some labs expect start of work in 2010 earliest due to information by their funding agencies.

Oct. 16, 2008CBM Collaboration Meeting, Dubna, Zbigniew Majka9 GSI Director & FCC Head signing the Contract with Architects “Ion42 GBR” Architect Contract Awarded Also contracts with 14 engineering Companies („planners“) signed on July 22, 2008

Oct. 16, 2008CBM Collaboration Meeting, Dubna, Zbigniew Majka10 Achieved: Application to start ZBau procedure July 2007 ISC mandate for GSI to take measures on CC (Sept. 2007) EU-wide call for Steering company Contract award to Drees&Sommer (July 2007) EU-wide call for construction planning (Sept. 2007) Contract award to engineering companies (July 2008) Start planning phase (July 2008) Next Steps Approval documents incl. Drawings for review (Dec. 2008/Jan. 2009) Technical report by hbm (baufachliche Prüfung) (Feb. 2009) Application for building permit (March 2009) Actual cost estimate as part of approval documents Decision (#10 ZBau): Commitment on cost coverage Building permit (Sept. 2009) Call for tender site preparation (2009) Begin site preparation (autumn 2009) Prepare execution documents (March – Dec. 2009) Call for tender construction work (late autumn 2009) Award construction contracts (earliest: end 2009 – beginning 2010…) Begin executive work (early 2010). Detailed cost estimate Feb Expect 1. building permit: Sept Start site preparation: end 2009 Start “digging / pouring concrete” starts: in 2010 Availability of buildings for start with S-FRS: end of 2012 Installation and commissioning of SFRS: up to end 2013 Start first experiments: End 2013/early 2014

Oct. 16, CBM Collaboration Meeting, Dubna, Zbigniew Majka Thank you!

Oct. 16, 2008CBM Collaboration Meeting, Dubna, Zbigniew Majka12

Oct. 16, 2008CBM Collaboration Meeting, Dubna, Zbigniew Majka13

Oct. 16, 2008CBM Collaboration Meeting, Dubna, Zbigniew Majka14