John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.

Slides:



Advertisements
Similar presentations
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Advertisements

GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons.
Super BigBite concepts Bogdan Wojtsekhowski, JLab
General Considerations Jian-ping Chen SoLID-SIDIS Collaboration Meeting.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Development plan and quality plan for your Project
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
SBS PMP STATUS JOHN J. LEROSE 4/25/2012 received from Bob McKeown 4/12/2012.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
SBS Management John J. LeRose Project Manager. Good News/ Bad News We are an official DOE program (project(s), whatever…) – Good because we are more likely.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
Address Recommendations Jian-ping Chen, JLab SoLID Collaboration Meeting May 14-15, 2015.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
Thomas Jefferson National Accelerator Facility Page 1 Bob May ESH&Q Deputy Internal Assessment Process BNL Accelerator Safety Workshop Aug 17-19, 2009.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Transverse Momentum Dependence of Semi-Inclusive Pion and Kaon Production E : Spokespersons Peter Bosted, Rolf Ent, Hamlet Mkrtchyan 25.5 days.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
Dual Target Design for CLAS12 Omair Alam and Gerard Gilfoyle Department of Physics, University of Richmond Introduction One of the fundamental goals of.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  WBS’s  WBS 1  Funding profile  Schedule  Critical.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
Modifying the PMP (remove some GEM’s add a scintillator coordinate detector) -JJL (8/29/2012)
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Hall A Installation Review John J. LeRose 2/25/2009.
Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
Thomas Jefferson National Accelerator Facility Page 1 IPR September 28-30, 2010 John LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Thomas Jefferson National Accelerator Facility Page 1 John LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab September 22-24, 2009 Physics.
Update/Overview of SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting Dec , 2012.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Stephen Wood NPS Collaboration Meeting November 19, 2014 Hall C Status And Lab Perspective on NPS.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Head, Office of Project Management Oversight (OPMO)
Electronics for GEM R&D at the University of Virginia
Jefferson Lab Reliability Task Force and Initiatives
Hall A Compton Electron detector overview
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Preparations for a Lehman Review
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Project Management Issues John N. Galayda, SLAC April 24, 2002
SOLID Collaboration Meeting
Conventional Facilities
Test Beamline System Requirements and Charge to PDR Committee
TDIS mTPC update Nilanga Liyanage and Kondo Gnanvo UVa
Presentation transcript:

John J. LeRose 1

 Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S 2

SBS Organization Associate Director Experimental Physics R. Ent (Acting) Director H. Montgomery Deputy Director Science & Tech R. McKeown Hall A Leader R. Michaels (Acting) Project Manager J. LeRose Collaboration Committee Experiment spokespersons, etc.. GEM Detectors N. Liyanage (U.Va) Electronics M. Khandaker (NSU) Trigger System R. Gilman (Rutgers) Detector Stands C. Perdrisat (W&M) Magnet/Infrastructure Installation R. Wines (JLab) External Review Panel Appointed as needed Internal Review Panel Appointed as needed Project Scientists B. Wojtsekhowski (principal) G. Cates K. de Jager 3

 Multiphased  SBS Basic  Neutron Form Factor measurement  Proton Form factor measurement  Multiphased  SBS Basic  Neutron Form Factor measurement  Proton Form factor measurement 4

 Construct a multipurpose spectrometer system capable of handling high momentum with large solid angle and momentum acceptance and extreme rate capabilities in the detectors.  Make precise measurements of the neutron and proton form factors.  The neutron form factor measurements only require a partial completion of the SBS  The proton form factor measurement will require its full capability.  Construct a multipurpose spectrometer system capable of handling high momentum with large solid angle and momentum acceptance and extreme rate capabilities in the detectors.  Make precise measurements of the neutron and proton form factors.  The neutron form factor measurements only require a partial completion of the SBS  The proton form factor measurement will require its full capability. 5

 Modified 48D48 magnet (from BNL)  Associated platforms, shielding, power supply, target chamber, and beamline  GEM detectors for high rate position tracking  Associated GEM electronics (front end processing and DAQ)  Trigger electronics  Modified 48D48 magnet (from BNL)  Associated platforms, shielding, power supply, target chamber, and beamline  GEM detectors for high rate position tracking  Associated GEM electronics (front end processing and DAQ)  Trigger electronics 6

7 Work Breakdown Structure

8 The basic instrumentation needed to do any experiment with SBS

9

10 Accelerator Schedule

11 Risk EventCost of Event Likelihoo d of Event Mitigation Strategy Magnet Risk<1%None Platform Risk<1%None Beamline Risk<1%None

12WBS2. Neutron Form Factor 2.2Detectors2.2.1GEM's2.2.2 GEM electronics InstitutionWBSProductdateNSU2 Front-End-Electronics and Data Acquisition electronics 8/30/2014 UVa2GEM's8/30/2014

13

14

15 Risk Event Cost of Event Likelihood of Event Mitigation Strategy Failure of GEM Foil $2k~12% Will have spares available 30% extra foils/20% extra chamber modules Failure of GEM Electronics Module $2k~3% Plan to make spare modules

16 WBS 3

17

18 ScheduleSchedule Accelerator Schedule

19 Risk Event Cost of Event Likelihood of Event Mitigation Strategy Platform Risk <1%none Beamline Risk <1%none Failure of GEM Foil $2k~12% Will have spares available 30% extra foils/20% extra chamber modules Failure of GEM Electronics Module $2k~3% Plan to make spare modules Trigger Risk <1%none

20 from project management link to pdf file

21

22 In general risks are all small In general risks are all small Magnet and platform are very low risk GEM’s are low risk, but expect some failures Will deal with GEM risk by preparing ~20% spares (electronics and GEM Chambers) In general risks are all small In general risks are all small Magnet and platform are very low risk GEM’s are low risk, but expect some failures Will deal with GEM risk by preparing ~20% spares (electronics and GEM Chambers)

23

24 All phases of the SBS program will be carried out in accordance with the Jefferson Lab Environment, Health and Safety (EH&S) policies and procedures as documented in the Jefferson Lab “EH&S Manual” including obeying all local, state and federal regulations. SBS program work will be conducted under the laboratory’s existing Integrated Safety Management (ISM) Program. ISM is an integral part of Jefferson Lab’s management structure spelled out in detail in the “EH&S Manual”, the “Quality Assurance Manual”, and various management manuals and training documents. Proposed program work will be performed under the standards and codes set forth in the TJNAF DOE JSA contract, Federal Occupational Safety and Health Act (OSHA), 29 Code of Federal Regulations (CFR) 1926, 10 CFR851, and Virginia OSHA as supplemented by Jefferson Lab work rules. All experiments will be subjected to the JLab Physics Division “Readiness Review” process.

25  A management plan exists  Yes, it’s still under development  Costs are assessed  Risks are assessed  A detailed schedule exists  EH&S issues are addressed  A management plan exists  Yes, it’s still under development  Costs are assessed  Risks are assessed  A detailed schedule exists  EH&S issues are addressed PMP

26

27

28