1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

Presented by YOUR NAME THE DATE
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
RETS – REMP Workshop NRC Activities June 25, 2007 Presented by Steve Garry.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Temporary Configuration Change Mike Hayes Exelon Nuclear.
Integration of Quality Into Accident Investigation Processes ASQ Columbia Basin Section 614 John Cornelison January 2008.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Controlling Hazardous Energy
Fermi Case Study Flow Variance ≥ 2% Obtaining NRC relief to allow for use of a 2.78% total flow reference band for Fermi RHR Service Water Pumps ISTOG.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
4. Quality Management System (QMS)
Copyright  1999 Business & Legal Reports, Inc. BLR’s Safety Training Presentations Control of Hazardous Energy (Lockout/Tagout) 29 CFR
January 5, Review of Emergency Operations Plan Tasks and Citations Tips & tools for creating your plan and avoiding deficiencies.
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Module 7: Construction Phase
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
Lockout/Tagout Authorized Employee Slide Show Notes
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
1/05 School Safety Training Control of Hazardous Energy (Lockout/Tagout) WAC
FDA Regulatory review in Minutes: What Product Development Executives Need-to-Know. Specifically, frequent causes of recalls and related areas that investigators.
Definitions, Goals and Objectives
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
A SUMMARY OF CDBI FINDINGS IN SERVICE TESTING OWNERS GROUP December 2010 Clearwater, Florida.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
What is your IST Organizational Culture like? by NextEra Energy Seabrook Station LLC Bob Parry, Tim Couture, and Debbie Masters Inservice Test Owner’s.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
1 FSIS Notice Notice of Reassesment for E. Coli O157:H7 Control And Completion of Checklist for all beef operations.
ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
QUALITY MANAGEMENT STATEMENT
1 CDBI Inspection Insights for 2008 Kelly Clayton Senior Reactor Inspector Engineering Branch 1 Region IV.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
2010 CMBG Conference Temporary Design Changes Tony Hathcock Duke Energy - Oconee June , 2010 Charlotte, NC.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
1 ISTOG QUESTIONS ISTOG QUESTIONS IST Program Plan Submittals to Regulators: Prior to OM-2001, and going back to ASME Section XI, there.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
School Safety Training Control of Hazardous Energy (Lockout/Tagout) WAC
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Failure Modes, Effects and Criticality Analysis
Pilot Component Design Basis Inspection (CDBI) and Equipment Qualification (EQ) Program Inspection Feedback CONFIGURATION MANAGEMENT BENCHMARKING GROUP.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Lock Out Tag Out Affected Employees.
Planning meetingCertification audit, stage 1 Pre-audit (optional) Document review Prior to every certification audit a planning meeting is conducted where.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Flooding Walkdown Guidance
NRC CM Pilot Inspections Methodology and Results
Standards and Certification Training
Ageing Management Session Name: Principles of Ageing Management
Control of Hazardous Energy
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Presentation transcript:

1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee

2 What Happened? Quarterly Containment Spray pump and Valve Test was scheduled following corrective maintenance on a non-IST component. NRC Resident Inspector questioned Control Room staff on preconditioning related to the use of IST components for tagout boundaries for component corrective maintenance.

3 M RWST PI PI PI ICS Pump 1B ICS Pump 1A M M M M M M M CI-1001A CI-1001B ICS-201 ICS-202 From Refuel Canal To SI From RHR Hx From RHR Hx ICS-2B ICS-2A ICS-5A ICS-6A ICS-6B ICS-5B Restricting Orifice PI Containment RHR-400B RHR-400A Additive Standpipe Additive Pump Additive Tank Filter LI LI LI PI PI Valves in Question FI FI ICS-200B ICS-200A ICS-210B ICS-210A ICS-7A ICS-7B ICS-102 Gasket Repair

4 Initial Response IST Owner Contacted and replied that since the valves were closed they were preconditioned. Condition Report generated. IST Owner discussed issue with NRC Resident.

5 First Discussion Provided Inspector Part 9900 and NUREG 1482 Informed Inspector I couldn’t speak for work control procedures Didn’t Mention Program Definition

6 Part 9900 Technical Guidance Maintenance - Preconditioning of Structures, Systems, And Components Before Determining Operability Preconditioning – The alteration, variation, manipulation, or adjustment of the physical condition of an SSC before Technical Specification surveillance or ASME Code testing.

7 Part 9900 Technical Guidance Acceptable Preconditioning – The alteration, variation, manipulation, or adjustment of the physical condition of an SSC before Technical Specification surveillance or ASME Code testing for the purpose of protecting personnel or equipment or to meet the manufacturer’s recommendations.

8 Part 9900 Technical Guidance Unacceptable Preconditioning - The alteration, variation, manipulation, or adjustment of the physical condition of an SSC before Technical Specification surveillance or ASME Code testing that will alter one or more of an SSC’s operational parameters which results in acceptable test results.

9 Part 9900 Technical Guidance Unacceptable Preconditioning – Could mask the actual as found condition of the SSC and possibly result in an inability to verify the operability of the SSC. Could make it difficult to determine whether the SSC would perform its intended function during an event in which the SSC might be needed.

10 Part 9900 Technical Guidance Does the practice performed ensure that the SSC will meet testing acceptance criteria? Would the SSC have failed the surveillance without the preconditioning?

11 Part 9900 Technical Guidance Does the practice bypass or mask the as- found condition? Is preventive maintenance routinely performed just before the testing? Is the preventive maintenance performed only for scheduling convenience?

12 Operability Determination Compared historical stroke times Answered five questions from NRC Inspection Manual Part 9900 to document preconditioning was acceptable

13 Inspector Feedback Any IST Procedural Controls? Work Management Procedural Controls? How can you justify acceptability of preconditioning after the fact?

14 NUREG 1482 Para “the staff considers unacceptable preconditioning of pumps and valves in the IST program to include such activities as …(2) Operation of a pump or valve shortly before a test, if such operation could be avoided through plant procedures with personnel and plant safety maintained.”

15 KPS “OLD” Program Definition Preconditioning – The act of exercising or placing a component in service for the purpose of enhancing the results of an inservice test. The act of preconditioning could mask a degrading condition that may otherwise be detected when testing a component in the “as found” condition.

16 KPS “Old” Program Definition (Cont.) The exercising of a component when required by an Operations Procedure for system reconfiguration shall not constitute or be considered as preconditioning. It is an expectation to perform tests in the “as found” condition but not a Code requirement except for relief valves. Activities, which may be considered as preconditioning, should be justified.

17 Subsequent Discussions Plant Manager initially agreed that what occurred sounded like preconditioning Industry Response (ISTOG) provided data to the contrary. None of the responses (approximately 20) considered preconditioning in tagging evolutions

18 Subsequent Discussions Senior Resident presented to Plant Management that IST “Didn’t care about preconditioning because it isn’t a Code requirement.” Provided Junior Resident information from 2002 Pump and Valve Symposium Seabrook Resident “Contacted”

19 Subsequent Discussions It became apparent that the KPS response to the original concern was not done correctly. Each piece of the puzzle was presented to the Resident by one group or individual at a time. This led to more questions and misunderstandings. A more unified approach including all work groups may have prevented violation.

20 Subsequent Discussions Potential Work Planning Procedure Violation Involved Discussion with Work Week Coordinators and Supervisor/Manager Resulted in the conclusion that no procedural violation occurred

21 Inadequate Procedure Violation “The inspectors determined, following review of plant procedures, interviews with plant management, and a review of NRC guidance on preconditioning, that plant procedures were not adequate to support proper consideration of preconditioning.

22 Inadequate Procedure Violation These procedures did not discuss or provide a definition for acceptable versus unacceptable preconditioning, did not provide guidance on the scope of components which should be included in such consideration, and did not identify which personnel were responsible for the consideration of potential preconditioning.

23 Inadequate Procedure Violation Therefore, the inspectors determined that, due to inadequate procedures, adequate consideration of preconditioning of ICS-202 and ICS-2B during maintenance activities was not given before the surveillance procedure that tested these valves was conducted”

24 Corrective Actions Revised definition of preconditioning in IST Program to match Part 9900 Guidance “Benchmarked” Seabrook’s Preconditioning Procedural Guidance Revised work management procedures Added IST Program Technical Position

25 “As Found” The physical state of a component after a period of normal service without repairs or adjustments that could affect its operation. Normal service includes component operation when required by an operating procedure or non-routine operation of the component to establish required system conditions for corrective maintenance activities.

26 Corrective Actions Key is to document potential concerns in work planning documents and/or procedures Raise Awareness to ensure everyone has a similar understanding

27 Continuing Evaluation Reviewing Scheduling Typically maintenance items performed early in work week and surveillances performed late in work week. This results in many preconditioning concerns/questions. Reversing schedule should minimize preconditioning concerns.

28 Do Over??? NRC Inspection Team Questioned EDG Test Sequence Fire Protection Trip Test performed prior to Quarterly “slow” start test that timed an IST cooling water valve.

29 Do Over??? 2001 Evaluation of test sequence “Missed the Mark” Requested meeting with Senior Resident to better understand concern Senior Resident Informed team that sequence was “Acceptable Preconditioning” based upon difference in periodicity of tests

30 Do Over??? NRC Senior Resident Informed KPS that we may have a “Risk” violation based upon excessive unavailability time caused by test sequence Recommended evaluating merging of tests Will monitor our evaluation/response

31 Questions? Does ISTOG want to pursue submittal of position to EPRI? Has anyone has similar experiences? Is there value in distributing as INPO OE?