Prompt Calibration Loop 11 February 2011. Overview Prompt calibration loop in SCT –Provides ATLAS with conditions data used for the bulk reconstruction.

Slides:



Advertisements
Similar presentations
VISTA RDC rdc.eortc.be EORTC Remote Data Capture System For trials that started before 01/01/2009.
Advertisements

Scheduling Discoverer Reports Scheduling Standard Reports Printing & Re-printing Standard Reports Focus on Reports Session 2 To print: Right click Choose.
ALEPH version 21 Task Manager. New Task Manager Interface Admin tab 2 The Task Manager interface has been removed from the ALEPH menu, and is now found.
Batch Process Overview. Batch Processes 2 What Do You Mean By Batch Processing? Allows for Mass Entry of Data All Processing of the Data Happens Without.
11 CSC DQA Status Ken Johns, Venkat Kaushik, Caleb Lampen, Xiaowen Lei (U. Arizona)
CSC DQA and Commissioning Summary  We are responsible for the online and offline DQA for the CSC system, a US ATLAS responsibility  We are ready for.
EORTC Remote Data Capture System For trials with electronic queries
CSC Online and Offline DQA Status Ken Johns, Venkat Kaushik, Xiaowen Lei (U. Arizona)
New School Websites Teacher Pages. Visit the SCUSD Website for videos tutorials: For more information.
A walkthrough of the SageQuest Mobile Control Online & ESC integration.
Creating a Client for Mortgage and Protection. Click here to enter a new client.
O FFLINE T RIGGER M ONITORING TDAQ Training 30 July 2010 On behalf of the Trigger Offline Monitoring Experts team.
131 Agenda Overview Review Roles Lists Libraries Columns.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
CERN - IT Department CH-1211 Genève 23 Switzerland t Monitoring the ATLAS Distributed Data Management System Ricardo Rocha (CERN) on behalf.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
1 Module 2: Introduction to Cayuse424. Objectives 2 Welcome to the Introduction to Cayuse424 Module. In this module you will learn:  How Cayuse424 supports.
Comm Operator Tutorial How to send the same data at fixed interval time automatically Serial Port Tool
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Introduction to Member Bridge An overview of features and uses for APNA Members Member Bridge.
2nd September Richard Hawkings / Paul Laycock Conditions data handling in FDR2c  Tag hierarchies set up (largely by Paul) and communicated in advance.
An Introduction to CCP4i The CCP4 Graphical User Interface Peter Briggs CCP4.
Offline shifter training tutorial L. Betev February 19, 2009.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
What information do student accounts have? Where do students find class information?
What is Web Site Administration Tool ? WAT Allow you to Configure Web Site With Simple Interface –Manage Users –Manage Roles –Manage Access Rules.
DDM Monitoring David Cameron Pedro Salgado Ricardo Rocha.
11/25/2015Slide 1 Scripts are short programs that repeat sequences of SPSS commands. SPSS includes a computer language called Sax Basic for the creation.
1 Installation Training Everything you need to know to get up and running.
1 Chapter Overview Defining Operators Creating Jobs Configuring Alerts Creating a Database Maintenance Plan Creating Multiserver Jobs.
Run Coordination Summary of the May 14, 2004 Run Coordinator Meeting CT-EC2 Run Preparation Meeting May 17, 2004 Slide 1 Peter Loch University of Arizona.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
The Report Generator Viewing Student Outcomes. Install the Report Generator In a browser, go to Click.
Conditions Metadata for TAGs Elizabeth Gallas, (Ryan Buckingham, Jeff Tseng) - Oxford ATLAS Software & Computing Workshop CERN – April 19-23, 2010.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
Internal and Confidential Cognos CoE COGNOS 8 – Event Studio.
D Q 20 Oct. 2007Quality flags, D.Verkindt1 Quality flags in Virgo Data Base D. Verkindt, LAPP On behalf of the Virgo « data quality task force »
SCT DQ Training DQ Training 2011 Dr. Petra Haefner.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
FACEBOOK Material adapted from
Michele de Gruttola 2008 Report: Online to Offline tool for non event data data transferring using database.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
EOVSA Pipeline Processing System J. McTiernan EOVSA Prototype Review 24-Sep-2012.
Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.
Pavel Nevski DDM Workshop BNL, September 27, 2006 JOB DEFINITION as a part of Production.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
ConTZole Tomáš Kubeš, 2010 atlas-tz-monitoring.cern.ch An Interactive ATLAS Tier-0 Monitoring.
Reporter Training for High School RIO TM
Petra HaefnerSCT Expert Training SCT Expert Training Data Quality 1.
Joe Foster 1 Two questions about datasets: –How do you find datasets with the processes, cuts, conditions you need for your analysis? –How do.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
Monitoring of L1Calo EM Efficiencies
Logging Into Windows XP for first time (labs only!)
MICE Computing and Software
Presentation Overview
Offline shifter training tutorial
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
Bomgar Remote support software
How to Fix Canon Printer Offline Error. Set Canon Printer from Offline to Online on Windows 7  In case the printer is set Offline an error message will.
CMS Pixel Data Quality Monitoring
Student Introduction to CORE ELMS
Error Diagnosis System
Presentation transcript:

Prompt Calibration Loop 11 February 2011

Overview Prompt calibration loop in SCT –Provides ATLAS with conditions data used for the bulk reconstruction at Tier0 (& reprocessing) Noisy strip map (only as of today) –Provides SCT with key variables to monitor the performance Noisy strip/chip, dead strip/chip, noise occupancy, efficiency, bytestream errors etc. Offline jobs to create the outputs run automatically on TMS (Task Management System). –DQ shifter monitors the job status. All outputs are manually uploaded to COOL database –DQ shifter uploads the outputs to COOL. 2

Bulk Reconstruction at Tier0 “Bulk reconstruction” at Tier0 –Tier0 runs reconstruction on RAW data for each run. –The outputs are distributed to Tier1s for physics analysis. Run-calibration-reconstruction cycle –A run finishes. –A fixed 36 hours is given to subsystems, as offline calibration period. – Reconstruction starts. 3 time run 1 reconstruction 1 calibration 1 (36 hours) reconstruction 2 calibration 2 (36 hours) run 2run 3 Prompt calibration loop has to be completed within 36 hours

Prompt Calibration Loop For a given run, prompt calibration loop has to be completed within 36 hours. 3 steps –Processing : Offline calibration jobs run automatically. –Outputs : Appear on a dedicated Web page. –Uploads : Uploads to COOL database on the Web page. 4

Processing 5 TypeComments Noisy stripUsed for bulk reconstruction Dead stripPerformance monitoring Dead chipPerformance monitoring Noise occupancyPerformance monitoring Raw occupancyPerformance monitoring EfficiencyPerformance monitoring Bytestream errorPerformance monitoring For a given run, 7 types of jobs are defined.

Shifter’s Work Go to SCT-dedicated upload Web page (See page 7). –Log in. –Check a list of runs in recent 2 days on ATLAS RunQuery, which are in prompt calibration loop period (36 hour time- window for each run). –Upload the outputs if available. –Contact experts for any questions/problems. Go to Task Lister Web page (See page 8). –Monitor jobs for a list of runs are defined/running/done. –Contact experts for any questions/problems. 6

Upload Page 7 Upload test flag (NoisyStrip only), checkbox, log Last run uploaded for noisy strip Check cron job Log in Send message to experts Tabs to select types (NoisyStrip is selected in this page) Click for uploads Link to ATLAS RunQuery Link to documentation etc Select tag (default is selected)

8 Job Monitoring on Task Lister Tasks done Tasks running Tasks defined Type sctns : NoisyStrip, 2 jobs (tag c0, c00) sctdc : DeadChip, 1 job sctds : DeadStrip, 1 job sctno : NoiseOccupany, 2 job (tag c0, c00) sctro : RawOccupancy, 1 job scteff : Efficiency, 1 job sctbse : BSErrors, 1 job Select “sctcalib” NOTE : don’t care “#Events=0”