HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.

Slides:



Advertisements
Similar presentations
Antonin Vacheret DAPNIA/SPhN, CEA Saclay.HAPPEX II Jlab Hall A Electron detectors for HAPPEX2 and He Installation in HRS Linearity tests 4.
Advertisements

Bob MichaelsParity Collab. Mtg. May 17, `07 Integrating Compton DAQ and Analysis Bob Michaels with Reminder about Nov 2006 Results Specification of new.
Beam Monitors Info from John Musson on new cavity receivers Other monitor issues.
18 Bit ADC Status Collaboration meeting May 18, 2007.
Robert J. Feuerbach Jefferson Lab Constructed from contributions from the HAPPEX Collaboration Hall A Collaboration Meeting December 5, 2005 HAPPEX-II.
Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Lumi Analysis for HAPPEx III / PREX Presented by: Luis Mercado UMass - Amherst 5/18/2007.
Analog-to-Digital Converter (ADC) And
LSU 06/04/2007Electronics 71 Analog to Digital Converters Electronics Unit – Lecture 7 Representing a continuously varying physical quantity by a sequence.
Noise Analysis for PREx - Pb Radius Experiment Presented by: Luis Mercado UMass - Amherst 6/20/2008.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 24, 2007.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Tests of a 10cm by 10cm triple GEM detector
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
TRIUMF Qweak Electronics Des Ramsay Nov Status of Electronics November, 2008  36 VME modules (# 001 and # ) delivered to JLab  001, 003,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Diana Parno – July 22, 2008 January PREx Test Run: Compton Photon Analysis Diana Parno Carnegie Mellon University HAPPEX Collaboration Meeting.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
LIGO-G0200XX-00-M LIGO Scientific Collaboration1 First Results from the Mesa Beam Profile Cavity Prototype Marco Tarallo 26 July 2005 Caltech – LIGO Laboratory.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Diana Parno – 18 April 2009 Compton Photon Detector Upgrade Diana Parno 18 April 2009 HAPPEX Collaboration Meeting.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Detectors for PREx Collaboration Meeting, April 17-18, 2009 Piotr Decowski, Smith College Krishna Kumar. UMass.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
PREX Issues. Outline New issue: souce systematics and Aug. 07 run. Update on old issues. Progress at SU.
CALO Meeting–September 2 nd 2015 Calorimeter Upgrade Electronics: June 2015 Test Beam E. Picatoste Universitat de Barcelona, Institut de Ciències del Cosmos.
SKIROC ADC measurements and cyclic ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting Orsay June.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
Moller Polarimeter Upgrading for PREx in 1)Mollar Analysis & Upgrading Works during/after 2009 PVDIS 2)Flash ADC based DAQ dead-time measurement.
Beam Position Reconstruction Pengjia Zhu 02/15/2012.
HAPPEX/Lumi PMT Studies Luis Mercado UMASS 7/10/09.
PMT test device setup functionality –reproducibility of output signal –dynamic range –limitations –test duration conclusion T. Wälchli, TT-Meeting Brussels,
LUIS MERCADO UMASS 7/10/09 HAPPEX DAQ / 18-bit ADCs.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
1 DCD Gain and Pedestal Spread
Quiz: AC & DC Specifications TIPL 4002 TI Precision Labs – ADCs
PreShower Characterisations
Analog FE circuitry simulation
Data Acquisition (DAQ) Status
M. Jones B. Wojtsekhowski
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
during Fall GMp run (high current)
Noise Analysis for PREx - Pb Radius Experiment
Polarized Source Development Run Results
Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster
BCM test in low current for g2p
Possible parasitic measurement during Fall GMp run
Plans for the 2004 CSC Beam Test
Presentation transcript:

HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09

Full DAQ System

 Crate currently used in electronics lab for testing.  Plan to move crate into the Hall in early June.  Left Arm Detectors.

 Will house Luminosity Monitor connections, Cavity Monitors and Right Arm Detectors.  Proper Lumi-ADC setup was tested Jan’08 to achieve minimum pedestal noise.

 Needs to be revived.  Will have different configurations with and without Qweak Crate to facilitate standalone tests.  Should we only use Helicity signals in this crate like during HAPPEX run?

 Recently underwent a test with 1 kHz MPS sequence.  DAQ starts to breaks down at 3 kHz.  Concluded we can run at 2 kHz, or 200 Hz with ovs of 10, or 240 Hz with ovs of 8.  Maybe higher but needs to be investigated.

Current Plans  Revive synchronization checks.  Replace many 16-bit ADCs with new 18-bit boards.  Basic DAQ should be ready for testing by mid-July.

Future Tests  High rate deadtime.  Checks of new helicity sequence board.  Synch checks.  Pedestal Studies (helicity-correlated noise).

Latest 18-bit ADC Tests

New 18-bit ADCs  Received four brand new boards a couple of weeks ago.  Performance matches previous tests with prototypes.  Will be receiving 10 more new boards by June 1st.

Testing of 18-bit boards.  Setting and recording proper pedestals offsets.  Studying pedestal noise with respect to gain setting (as low as 12ppm).  Testing linearity of current mode for use with Luminosity Monitors.  Comparing results with previous study done with 16-bit ADCs.

Integration Time (IT) Study  Have had problems in the past with gross nonlinearities at high end of ADC range.

Integration Time (IT) Study  Redid test using new 18-bit ADCs, with some changes: Sample more IT values by taking smaller steps up the IT ladder. More data points for higher IT values to get better error bar. Go up to K signal to see if it gets worse at the higher end.

Integration Time (IT) Study Residuals are less than 0.1% Local slopes vary by ~0.4%

Integration Time (IT) Study Residuals are less than 0.1% Local slopes vary by ~0.4%

PMT Linearity  Past tests have shown nonlinearities in PMT output dependant on input and gain.  Want to make sure we get similar results with new 18-bit ADCs.  Showed that results matched in good and bad linearity regions.

PMT Linearity (Formalism)  A PMT’s non-linear response can be expressed as follows:  Experimental asymmetry can be approximated:

Experimental Test Setup

PMT Linearity (w. 16bit ADC) Input = 12nA HV = 370 Output = uA B*N_0 = -5.25%

PMT Linearity (w. 18-bit ADC) Input = 12nA HV = 370 Output = uA B*N_0 = -5.14%

Good PMT Linearity Input = 2nA HV = 727 Output = uA B*N_0 = 0.7%

Good PMT Linearity Input = 2nA HV = 727 Output = uA B*N_0 = 0.77%

Ongoing Developments  Revive all HAPPEX DAQ crates and test their performance.  Will need to modify 18-bit ADCs to match replaced 16-bit boards.  Want to document good linearity regions for all available LUMI PMTs.

Acknowledgements  Krishna Kumar  Kent Pashke  Dustin McNulty  Robert Michaels  HAPPEX/PREX Collaboration