March 15,2005 Working Groups Physics J. Hobbs V.Buescher (deputy) Physics Groups Spokespersons T. Wyatt D.Denisov Trigger Silicon Layer O Online L3/DAQ.

Slides:



Advertisements
Similar presentations
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Advertisements

Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
DZero RunIIb Director’s Review February 3, Run IIb Project Status Vivian O’Dell.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
1 DØ trigger system 3 levels L1 deadtimeless L1 deadtimeless L2 100  s L2 100  s L3 farm, 50 Hz L3 farm, 50 Hz Brown involvement L2 STT L2 STT L1CTT.
September 16, 2002 ID Groups Physics Coordinator B. Klima Software and Computing A. Boehnlein, J. Qian Physics Groups Spokesmen G. Blazey J. Womersley.
Electroweak Physics at the Tevatron Adam Lyon / Fermilab for the DØ and CDF collaborations 15 th Topical Conference on Hadron Collider Physics June 2004.
Nick Hadley Maryland DØ Effort Maryland DOE Review August 30, 2005.
September 1, 2012 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, R. Van Kooten Physics Groups Spokespersons G. Bernardi D. Denisov.
January 26,2007 D0 Collaboration Organization TeV Working Groups Physics J. Hobbs R. Van Kooten Physics Groups Spokespersons T. Wyatt D. Denisov Online.
July 7, 2012 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, C. Schwanenberger Physics Groups Spokespersons G. Bernardi D. Denisov.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
9/14/2001D0 Simulation Tasks Q.Li 1 Simulation Tasks Status Qizhong Li Fermilab Sept. 14, 2001 D0 Collaboration Meeting.
EPS 2003, July 19, 2003David Buchholz, Northwestern University Performance of the D0 Experiment in Run II Detector Commissioning and Performance Accelerator,
BEACH Conference 2006 Leah Welty Indiana University BEACH /7/06.
Nick Hadley Run II Physics (I) Nick Hadley The University of Maryland New Perspectives 2000 Fermilab - June 28, 2000.
Scientific Highlights : CDF Experiment 1.Introduction 2.CDF Run-II detector 3.Phyiscs highlights B Physics, Top, Higgs, … to be continued by Rob October.
Aug 1, 2009 D0 Collaboration Organization TeV Working Groups Physics A. Juste Physics Groups Spokespersons D. Denisov S. Soldner-Rembold Production Speakers.
August 27,2007 D0 Collaboration Organization TeV Working Groups Physics A. Juste, S. Soldner-Rembold Physics Groups Spokespersons D. Denisov D. Wood Production.
Aug 2005 Working Groups Physics J. Hobbs V.Buescher (deputy) Physics Groups Spokespersons G. Blazey T. Wyatt Trigger Silicon Layer O Online L3/DAQ Trigger.
Fermilab Roles in DØ Physics Adam Lyon for the DØ Fermilab Group May 2006 Outline  Introduction to the Fermilab Group at DØ  Highlight Fermilab’s role.
December 28, 2009 D0 Collaboration Organization TeV Working Groups Physics G. Bernardi, M. Verzocchi Physics Groups Spokespersons D. Denisov S. Soldner-Rembold.
September 1, 2009 D0 Collaboration Organization TeV Working Groups Physics G. Bernardi, M. Verzocchi Physics Groups Spokespersons D. Denisov S. Soldner-Rembold.
A Graphics Sampler for the D  Detector G. Alverson, K. Bos, T. Burnett, F. Canelli, D. Coppage, L. Duflot, Y. Gershtein, N. Graf, S. Hagopian, P. Hamel,
10-25 years of DØ FranceE. Kajfasz1 -France RunII RunIITracking Hard/Soft-ware with.
SIST 2004 SIST Ayodele Onibokun August 10, 2004 Based on the code developed by: Henry Barnor, Fermilab Summer Student D ø Calibration Database Browser.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
September 19,2006 TeV Working Groups Physics J. Hobbs R. Van Kooten Physics Groups Spokespersons T. Wyatt D. Denisov Trigger Silicon Layer O Online L3/DAQ.
Elizabeth Gallas August 9, 2005 CD Support for D0 Database Projects 1 Elizabeth Gallas Fermilab Computing Division Fermilab CD Grid and Data Management.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
L3 Filtering: - short- and medium term plans - how you can help out All-D  Meeting: 14 th March 2003 Terry Wyatt (FNAL-CD/Manchester) on behalf of the.
DZero RunIIb PMG June 7, Run IIb Project Status Vivian O’Dell.
DZero Run IIb PMG February 25, Run IIb DZero PMG  Status overview, issues (Kotcher)  Schedule, project status (Freeman)  AOB Jon Kotcher Fermilab.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
The Online Central Tracker of D0
DZero Run IIb PMG January 28, Agenda Run IIb D-Zero PMG January 28, 2003  Overview, issues (Kotcher)  Project status (O’Dell)  Trigger technical.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
FNAL PMG Feb 5, DØ RunIIb Trigger Upgrade WBS 1.2 Paul Padley, Rice University for the DØ Trigger Upgrade Group.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
V. O’Dell, D0 RunIIb PMG 4-Feb Dzero Run IIb PMG  Agenda u Overview & Management News: V. O’Dell u Trigger Upgrade Status:P. Padley u Silicon closeout.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
India in DØ Naba K Mondal Tata Institute, Mumbai.
Aurelio Juste (Fermilab) Rencontres de Moriond, March OUTLINE Tevatron Run 2 The upgraded DØ Detector Status Performance First Physics Results Outlook.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
The DØ Silicon Track Trigger Wendy Taylor IEEE NSS 2000 Lyon, France October 17, 2000  Introduction  Overview of STT  STT Hardware Design u Motherboard.
Levan BabukhadiaICHEP02 – 31 st International Conference on High Energy Physics, Amsterdam, 24 – 31 July, 2002 CHEP02 – 31 st International Conference.
February 3, 2005DZero Run IIb Director's Review1 Standing Committee on Upgrade Installation to Physics Commissioning  Charge: u Convened by spokespersons.
10/24/2003Yu Chul Yang(CHEP,KNU) Accelerator & Detector 1.Accelerator 2. Tevatron 3. Detector 4. CDF Detector.
September 1, 2014 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, R. Van Kooten Physics Groups Spokespersons D. Denisov P. Grannis.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
DZero Run IIb PMG December 10, Agenda Run IIb D-Zero PMG December 10, 2002  ESAAB news (Lab, Project, DOE)  Project status, overview (Kotcher)
Director’s Review July 15, Installation and Technical Commissioning of D0 RunIIb L0 Silicon and Trigger Upgrades Schedule & Costs R.P. Smith for.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
Run 2 Jets at the Tevatron Iain Bertram Lancaster University/DØ Experiment PIC2003  Inclusive Cross Section  Dijet Mass  Structure.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
20 April 2002Bill Lee APS 1 The D0 Silicon Track Trigger Bill Lee Florida State University.
Research Program Brendan Casey DOE Annual Program Review September
DØ and CDF Detectors/Computing Bill Lee Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Electron Triggering and B-Physics at L3 (B  J/  K s, where J/   e  e  ) Abid Patwa, André Turcot, and Sailesh Chopra B-id Vertical Review DØ, Fermilab.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Search for Standard Model Higgs in ZH  l + l  bb channel at DØ Shaohua Fu Fermilab For the DØ Collaboration DPF 2006, Oct. 29 – Nov. 3 Honolulu, Hawaii.
Kevin Burkett Harvard University June 12, 2001
DØ Upgrade Run II Introduction Physics Goals Tevatron Upgrade
The Silicon Track Trigger (STT) at DØ
Presentation transcript:

March 15,2005 Working Groups Physics J. Hobbs V.Buescher (deputy) Physics Groups Spokespersons T. Wyatt D.Denisov Trigger Silicon Layer O Online L3/DAQ Trigger Subdetectors Run IIb Upgrade V. O’Dell R. Lipton (deputy) DAQ/Online Installation Production Run Coordinators W. Lee T. Yasuda Speakers Bureau Chair: A.Zieminski Advisory Council Chair: H.E.Fisk Institutional Board Chair: J.-F.Grivaz H.Schellman Algorithms Groups Executables Editorial Boards Online Monitoring Analysis Outreach and Public Tour Area G. Snow D. Lincoln Data Quality S.Kappler M. Ford Technical Integration Coordinator G. Ginther Software Algorithms M. Hildreth Computing and Core Software G.Davies Special Projects M.Johnson Subdetectors D0 Organization AFEII-t Trigger Board/TM Authorship Committee Chair: A.Jonckheere

March 15,2005 Run IIb Project V. O’Dell, Project Manager R. Lipton, Deputy PM T.J. Sarlina, Assistant PM M. Johnson,Technical Coordinator D. Knapp, Budget Officer S.Wright, Adminstration Trigger Installation D. Edmunds L. Bagby Silicon Installation Mechanical: W. Cooper Electrical: L. Bagby Readout K.Hanagaki R. Sidwell Sensors M. Demarteau R. McCarthy Mechanical Design & Fabrication W. Cooper Detector Modules & Integration L. Bagby Installation R. Smith DAQ/Online S. Fuess Silicon Layer 0 A. Bean (R. Lipton) Technical Organization Simulation E. Barberis, M. Hildreth Spokespersons T. Wyatt, D.Denisov —————— Trigger Coordinator: N. Varelas Administration (A. Bean) Network & Host Systems J. Fitzmaurice DAQ/Online Management (S. Fuess) L3 Systems G. Watts Control Systems F. Bartlett G. Savage V. Sirotenko Trigger P. Padley D. Wood L1 Track Trigger M. Narain D. Lincoln L1 Cal Upgrade M. Abolins H. Evans L1 Cal/Track Match K. Johns L2  upgrade R. Hirosky Silicon Track Trigger U. Heintz Administration (D. Wood) Technical Integration Coordinator G. Ginther Special Projects M.Johnson Data Quality S.Kappler M. Ford (deputy) Detectors Muon: (T. Diehl) CFT/PS: (M. Corcoran) SMT: (M.Kirby) CTT: (M.Corcoran) Cal: (J.Sekaric) (P.Verdier) Lum: (G.Snow) FPD: (M.Begalli) RecoCert Manager: D. Lam Run Coordinators W. Lee, T. Yasuda Electrical Operations: J. Anderson Mechanical Operations: R. Rucinski Online W.Lee Luminosity Monitor Y.Enari FPD A. Brandt L3/DAQ A. Garcia-Bellido G. Watts Global Monitoring E. Cheu SMT D.Tsybychev M. Kirby Fiber Tracker/ Preshowers J. Warchol —————— CFT J. Warchol CPS A. Magerkurth FPS A. Patwa Calorimeter N. Buchanan —————— L1 Cal D. Edmunds ICD A. White Central Muon A. Ito —————— PDT’s M. Wobisch P.Kasper Trigger counters (A. Ito) A. Evdokimov Forward Muon D. Denisov —————— MDT detectors V. Abazov MDT Electronics P. Neustroev Pixel detectors V.Evdokimov Pixel electronics T. Fitzpatrick Solenoid R. Smith L1 CTT S. Gruenendahl L1 Muon J. Temple L2 A.Kryemadhi AFEIIt A. Bross P. Rubinov TripT L. Bellantoni AFEII P. Rubinov Code Development TBA L2STT U.Heintz

March 15,2005 Computing and Core Software Computing and Core Software G. Davies Computing Planning Board Chair: D.O’Neil Spokespersons MC Production J. Snow JIM/Runjob/d0tools/d0rte/SAM Integration I.Bertram Code Development Infrastructure & Builds A. Jonckheere Online/L3 S. Fuess SAM Liaison S. Fu Databases J.Linnemann, I.Mandrichenko Offline Shifts D. Zieminska Data Processing Infrastructure M. Diesburg, D. Wicke Clued0 D. Shpakov Central Systems J. Boyd Analysis Tools R. Illingworth, A. Lyon User Requirements S. Hagopian Analysis Production

March 15,2005 Calorimetry (Calgo) P. Verdier J. Stark Muon B.Tuchming R. Stroehmer Tracking (Tralgo) M.Strauss P. Ratoff Alignment / Calibration T. Yasuda Integration together with Physics groups Integration with Trigger subsystems and Trigger Board Software Algorithms Software Algorithms M. Hildreth Reconstruction Q. Li Level 3 filtering D. Bauer P. Johnsson Trigger Studies Group M.Kopal R.Schwienhorst ExecutablesAlgorithms Groups Generators D0GSTAR D0SIM PMCS SMT / CFT Global Tracking Vertexing Event display (L. Duflot) Calibration: (J. Stark), M. Verzocchi CAL/ICD: (J. Stark) CPS: A. Magerkurth FPS: (A. Patwa) EM ID: J. Hays, C. Schwanenberger  ID: O. Atramentov, (Y. Maravin)  ID: A. Patwa, S. Protopopescu Jet ID: M. Andersson ME T ID: (P. Verdier) E-flow: A. Goussiou, A. Schwartzmann PDT / MDT / MSC / A   ID Spokespersons b tagging H. Greenlee A. Haas Simulation A. Kharchilava T. Kuhl MC Request Coord. T. Adams MCMeisters: A. Vartapetian, TBA

March 15,2005 Joint CDF/DØ Tevatron Physics Working Groups Spokespersons Triggermeisters J.Leveque A. Pompos Trigger Board Chair: M.Verzocchi Physics Coordinator J. Hobbs V.Buescher (deputy) B Physics H. Evans S.Burdin New Phenomena V. Büscher J-F. Grivaz QCD TBA M. Zielinski Tevatron Electroweak Working Group S. Eno M. Grünewald A. Juste A. Quadt Higgs N. Varelas TBA Physics Organization CDF Luminosity L. Mundim G. Snow Common Samples R. Hauser Y. Sharyy B Physics B. Casey G. Borissov Higgs G. Bernardi S. Choi New Phenomena J.-F. Grivaz A. Meyer QCD D. Alton V. O’Dell Top G. Guterriez C. Tully Electroweak D. Denisov I. Iashvili Editorial Boards Jet Energy Scale A. Juste C. Royon Trigger Studies Group M.Kopal R.Schwienhorst

March 15,2005 ES&H responsibilities during operations Spokespersons Particle Physics Division Fermilab Director Associate Director for Research Mechanical Department Electrical Department DØ Experiment Department Shift Captain Shift Physicists Technical Personnel Technical Integration Coordinator Run Coordinator Organization chart for DO operations plan