News Y2K June 25, 2007. Summary of June 12 Face-to-Face Meeting.

Slides:



Advertisements
Similar presentations
U.S. Department of Energy Brookhaven Science Associates BNL’s Role in High Energy Physics Thomas B.W. Kirk Associate Director for High Energy and Nuclear.
Advertisements

European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Fermilab Steering Group develop roadmap for accelerator-based HEP.
1 August 7, 2006 David Hitlin DOE Annual Program Review David Hitlin DOE Annual Program Review August 7, 2006.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
F Future of Neutrino Program at FNAL NuMI Off-Axis Meeting Hugh Montgomery January 12, 2004.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Presentation of Charge and Overview of Steering Committee Report Steve Holmes Accelerator Advisory Committee Meeting (
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Long Range Planning Pier Oddone September 24, 2007.
Round-table: Discussion on Future Machines. With the discovery of the Higgs Boson Self-consistent model (SM) accounting for all Particle Physics phenomena.
Physics Priorities S. Dawson July 11, 2007 Fermilab Steering Committee Meeting.
F FNAL Hugh Montgomery Fermilab October, f October 27,28, 20062Collider International Finance Committees Organisation Issues Fermi Research Alliance.
F Fermilab: The Future Fermilab Users Meeting Hugh Montgomery June 3, 2003.
F FNAL Hugh Montgomery Fermilab October, f October20,22, 20052Collider International Finance Committees New Director Pier Oddone –July 1, 2005 Organization.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
F Project X Overview Dave McGinnis October 12, 2007.
INFN Working Group High Intensity Frontier (HIF).
Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Fermilab Steering Group develop roadmap for accelerator-based HEP.
Neutrino Physics Opportunities for Fermilab Steering Group 6/12/07 Andy Lankford UC Irvine.
Accelerators in our Future ILC and Beyond Barry Barish Caltech Neutrino Telescope - Venice 13-March-09.
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
Staging of a Neutrino Factory (and beyond…) Mark Palmer Director, US Muon Accelerator Program NuFACT 2014, Glasgow, August 25-30, 2014 NUFACT2014 XVIth.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Summary Comments and Discussion Pier Oddone 40 th Anniversary Users’ Meeting June 8, 2007.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
J. Corlett. September 24, 2007 Report of the Fermilab Accelerator Advisory Committee on the Fermilab Steering Committee Report P5 Meeting Fermilab September.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
Programs with a High Intensity Proton Source “Introduction” Young-Kee Kim P5 Meeting at Fermilab January 31, 2008.
A vision for Fermilab Presentation to the National Academy Panel EPP 2010: Elementary Particle Physics In the 21 st Century Pier Oddone, 5/16/05.
P5 Report: The Particle Physics Roadmap 1 A. Seiden Fermilab May 14, 2007.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Intensity Frontier Physics with a Mega-Watt Proton Source R. Tschirhart Fermilab Science & Technology Review November
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
Opportunities from the Intensity Frontier to the Energy Frontier J.P.Delahaye/SLAC.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
DOE Mini-Review Summary and Management Updates Mark Palmer Fermilab March 15, 2013.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
A Muon-based Accelerator Staging Scenario (MASS)
LHeC Coordination Meeting, 9 June 2017
Jan 2016 Solar Lunar Data.
Future Flavor Physics At Fermilab?
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Yet Another Report from DOE Office of High Energy Physics
Snowmass on the Mississippi
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
GOMACTech-04 Technical Program Committee Timeline
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
SuperKEKB Proto-collaboration
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

News Y2K June 25, 2007

Summary of June 12 Face-to-Face Meeting

June 12 th Meeting Agenda TimeTopics 8:30 – 12:00 Energy Frontier – ILC, LHC, and beyond 1. ILC R&D, System Test, Industrialization  ILC Scenarios 2. LHC accelerator upgrades 3. R&D steps needed for colliders beyond ILC and LHC 1:00 – 4:00 Physics Opportunities beyond Energy Frontier 1. Physics Review:, , K, B, C, … 2. Required Facilities: a) Reconfiguration of existing accelerator complex b) New accelerators Review of Required Facilities 4:00 – 6:00Sketching Possible Roadmaps 6:00 – 6:30Final Report Format

Physics Opportunities Accelerator Based, Not Energy Frontier –Neutrino Physics –Precision measurements involving charged leptons and quarks Needed Facilities –High intensity, , K, anti-proton beams –High luminosity colliders

Criteria –Will the physics be important in a global context when the experiment is done? –Can it be done uniquely or substantially better at Fermilab than at other labs? –Is the experiment unique in its physics reach? Timeline –Near term ( ) Experiments that could start construction “soon” –Mid term ( ) Physics Opportunities: Criteria

“Reconfiguration of existing accelerator complex” followed by “higher intensity proton sources” offers a rich program of neutrino, kaon and muon physics in near and longer term –Physics driver is search for Beyond the Standard Model Physics “Antiproton source” offers short term (and small scale) opportunity for hyperon CP violation Longer term (and larger scale) opportunities: –Flavor physics at Super B factory –Electroweak Precision at Giga-Z –Need community-wide input on priorities Physics Group: Conclusions

ILC Scenarios Considered EDR 1. Baseline (Technically Driven Schedule) ConstructionRun EDRConstructionFunding Cycle 2. ILC Slow by ~2 years (e.g. waiting for LHC results, …) EDRConstructionFunding Cycle 3. ILC Slow by ~5 years (e.g. waiting for LHC results, international agreements, …) EDR 4. LHC says we need > 1 TeV Funding Cycle EDR Complete, LHC 1st Data Can we see the horizon? ILC Decision 5. ILC Offshore: To be discussed

FY In all scenarios Energy Frontier TevatronRun LHC detector upgradeFundCyc.Build Run CLIC, Muon Collider, VLHCR&D Advanced AcceleratorR&D Neutrino MINOS, MiniBooNE, SciBooNERun MINERvABuild Run NOvABuild Run Particle Astrophysics 1. ILC baseline scenario ILCEDR FundCyc.Build Run sNuMI ++FundCyc.Build Run 2. ILC slow LHC Results, … ILCEDR R&D FundCyc.Build LHC UpgradeFundCyc.Build Run sNuMI ++FundCyc.Build Run non accelerator research 3. ILC slow R&D, fund, build, … ILCEDR R&D FundCyc.Build LHC UpgradeFundCyc.Build Run Project X (8GeV & 120 GeV intense proton sources: ILC-like) FundCyc.Build Run 4. LHC says need > 800 GeV 5. ILC Off-shore

End Game of FNAL Strategic Plan / Roadmap

Communicated with –Fermilab Program Advisory Committee –Fermilab Accelerator Advisory Committee Chair –P5 Chair –HEPAP Chair –Robin Staffin

Steering Group Final Report to Pier Oddone –August 1, 2008 –Physics opportunities  accelerator facility roadmap  examples of experiments/physics along the roadmap Fermilab Accelerator Advisory Committee (AAC) meeting –Review of the accelerator facility roadmap –August 8-10, 2007 Fermilab Program Advisory Committee (PAC) meeting –Review of the physics roadmap –Early November, 2007 (TBD)

P5 –Steering Group Report to P5 (final report) September 24-25, 2007 –P5 review of the FNAL roadmap Recommendations from FNAL AAC and PAC as input ~Feb, 2008 HEPAP –Steering Group Report to HEPAP (progress report) July 13, 2007 –Steering Group Report to HEPAP (final report) November 2008 –P5 Report to HEPAP ~July 2008

Jul 2007 Aug 2007 Sep 2007 Oct 2007 Nov 2007 Dec 2007 Jan 2008 Feb 2008 Mar 2008 Apr 2008 May 2008 Jun 2008 Jul 2008 Jun 2007 P5 Review FNAL AAC Review SG Report to P5 FNAL PAC Review SG Report to HEPAP Steering Group (SG) Report to Pier Oddone Good timing for FY10 Budget Preparation SG Report PAC P5 Report to HEPAP SG Report to HEPAP

Report from Accelerator Subgroups 4, 5

Subgroup 4 (Accelerator Facilities) Steve Hohmes got FNAL people to look into various options which were presented to the Steering group: –Dave McGinnis is leading effort to come up with a more complete concept on Project X, including synergies with ILC. –Mike Syphers is leading effort to understand utilization of the Tevatron as either a high intensity 800 GeV fixed target machine, or a 120 GeV stretcher ring. –Sergei Ngaitsev is identifying possible synergies between SuperB factory and an ILC damping ring. Steve will present these efforts on July 9-10 meeting.

Subgroup 5 (Beyond ILC) This week’s activities –Meeting with Bob Palmer to understand what is needed for muon collider stay alive