Manchester Christmas meeting 2006: The ILC interaction region and beyond Rob Appleby Happy New Year everyone!

Slides:



Advertisements
Similar presentations
Ideas and Speculations for the Headon Extraction Line L. Keller Oct. 19, Give up the 3.5 m Separation between the Charged Dump and the Incoming.
Advertisements

DRAGAN TOPREK Manchester University Accelerator Physics Group supervisor: Dr. Rob Appleby.
Considerations on ILC Crossing Angle K. Yokoya LCWS13, BDS, Tokyo Univ. 2013/11/12 LCWS Yokoya1 Motivation Gamma-gamma collider CLIC.
Zero Degree Extraction using an Electrostatic Separator Take another look at using an electrostatic separator and a weak dipole to allow a zero degree.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Recirculating pass optics V.Ptitsyn, D.Trbojevic, N.Tsoupas.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Beam Crossing Angle for  Tohru Takahashi Hiroshima University International Linear Collider January 2005 MDI Workshop SLAC.
SLC  Testbed Proposal Jeff Gronberg  working group SC Linear Collider Retreat June 26 – 29, 2002.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
ILC Beam Delivery System Layout and Lattice Design Deepa Angal-Kalinin ASTeC, Cockcroft Institute Cockcroft Institute SAC th November 2006.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Overview of Extraction Line Designs and Issues
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
LDC Meeting Vienna 17. November 2005 Karsten Büßer LDC Machine Detector Interface Update.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
D. Trbojevic, N. Tsoupas, S. Tepikian, B. Parker, E. Pozdeyev, Y. Hao, D. Kayran, J. Beebe-Wang, C. Montag, V. Ptitsyn, and V. Litvinenko eRHIC and MeRHIC.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
ILC luminosity optimization in the presence of the detector solenoid and anti-DID Reine Versteegen PhD Student CEA Saclay, Irfu/SACM International Workshop.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Preliminary Result on L*=1.5m CEPC Interaction Region Yiwei Wang, Dou Wang, Sha Bai Yingshun Zhu, Teng Yue CEPC acc. meeting, 5 September 2014.
Accelerator WG 5 summary Interaction region, ATF2 and MDI Deepa Angal-Kalinin, Lau Gatignon, Andrei Seryi, Rogelio Tomas IWLC
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
Re-design of extraction line for single stage BC
Yingshun Zhu Accelerator Center, Magnet Group
Interaction Region and Detector
Machine Detector Interface Design Updates
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
Interaction Region of gamma gamma colliders
M. Sullivan International Review Committee November 12-13, 2007
The Interaction Region
Beam Delivery update Andrei Seryi December 12, 2005
The small crossing angle layout - where are we and what do we do now?
Y. Iwashita, T. Mihara, S.Nakamura,
The PEP-II Interaction e+e- Factories Workshop
Introduction to particle accelerators
Updates on IR and FF for super-B factory
The 2mrad horizontal crossing angle IR layout for the ILC
The 2mrad crossing angle alternative
BDS civil construction Single IR upgrade scenarios discussion
First look at final focus part of super-B factory
Interaction Region Design Options e+e- Factories Workshop
NLC 2001 Beam Delivery Layout
IR Lattice with Detector Solenoid
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Presentation transcript:

Manchester Christmas meeting 2006: The ILC interaction region and beyond Rob Appleby Happy New Year everyone!

This is my first Christmas meeting … I spend a large fraction of my time working on the International Linear Collider (ILC) [What else? Theoretical beam dynamics, LHC] The UK is heavily involved in the beam delivery system, which starts from the end of the linac and finishes at the dumps A lot of work has been done on the layout of the beam interaction regions (IRs), where the two beams collide…

ILC baseline layout e-e- e+e+ Baseline (supported by the GDE) –two BDSs, 20/2mrad, 2 detectors, 2 longitudinally separated IR halls

The baseline design of the IRs The baseline design consists of two independent interaction regions, with two independent detectors BUT, there is considerable pressure to reduce this to a single IR layout Hence, the baseline specifies two alternatives two BDSs, 20/2mrad, 2 detectors in a single IR z=0 Single IR/BDS, collider hall long enough for two push-pull detectors The next couple of slides take a closer look at the IRs and extraction lines of the two baseline crossing angles

Design features of 20mrad extraction line Key design feature Incoming and outgoing beams do not see the same magnets

l*=3.51m 9m  optical transfer SC QD (r  35mm) 215 T/m warm QF (r ~ 10mm) 150 T/m 2 mrad ~ 6-7 mrad to beam diagnostics 2mrad Extraction Line Key design feature Incoming and outgoing beams share the same magnets. This is a direct consequence of the small crossing angle

SC super septum quadrupole and Panofsky septum quadrupole designs under study for the first extraction magnets where horizontal separation is limited. Super Septum Quadrupole B. Parker Warm : Panofsky Quadrupole C. Spencer

What else could we do? The choice of 2mrad and 20mrad has emerged from a long (and ongoing) debate Other alternatives are –Colliding the beams head-on (tried for the TESLA project…very hard but not dead yet!) –Pushing the 20mrad down, but still having separate magnets…gives you 14mrad (this is under study and favoured by our US colleagues) –7mrad, 25mrad….all have some advantages Finally, if we drop to 1 IR…what do we choose?

Once the beam has been extracted, the show is not quite over 1 ! 1: This is not generally appreciated, even among accelerator physicists!

How do you dump a 20MW particle beam? A water dump was used at the SLC. It was rated to 2MW but only ever used to 800kW. This jump to 20MW is considerable

Summary The ILC IR baseline has taken a long time to reach the current point, and there is a long way to go. Currently the configuration is 2mrad and 20mrad, but the number of IRs and the choice of crossing angle may chance, and is a very contentious point Finally, we also need to worry about dumping the charged particle beam – the UK is now taking a strong lead in this aspect of the ILC