Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.

Slides:



Advertisements
Similar presentations
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Advertisements

Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
International Civil Aviation Organization
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N FAA/NASA Weather Information Communications Flight.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
The Future of PETAL Technology
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
International Civil Aviation Organization
SC-214 / WG-78 Mgt Meeting Nov 2010 Rockville, MD – Lockheed Martin.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
Federal Aviation Administration FAA Labs in a Distributed and Collaborative Environment to Support V&V William J. Hughes Technical Center October 10, 2012.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
ATN 2001, London - 18 Sep 01 1 PETAL II Extension Architecture, Integration and Testing Prepared by Martin Adnams/Isabelle Herail.
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
10 Dec 15 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada January 2016 AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone)
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
WORKING GROUP I (WG-I) AEEC IPS Update
Presented By: Peter Muraca FAA Technical Center Atlantic City, NJ USA
International Civil Aviation Organization
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications
International Civil Aviation Organization
Presented by Thales Avionics ATN 2003 London, UK September 2003
Mini Global Demonstration
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
International Cooperation
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
The Air Ground Datalink Server (AGDS)
International Civil Aviation Organization
NEXCOM Next Generation Air/Ground Communications Appendix G
Ground based ATN Router Requirements
Presented at ICAO ACP WG-I By Robin Hughes
International Civil Aviation Organization
Future Communications Infrastructure – An update
9/17/2018 Boeing ATN/IPS (Aeronautical Telecommunications Network/Internet Protocol Suite) Activities Title Option 1: Environment, Health & Safety Standard.
IBAC – CNS/ATM Datalink Briefing
15-19 Nov 2010 Rockville, MD – Lockheed Martin
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
DATA LINK IMPLEMENTATION IN EUROPE
ATN Subnetwork Implementation:
P AIRPORT SURFACE DATALINK
International Civil Aviation Organization
Presentation transcript:

Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris Date:January 2011

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Agenda Validation of SC-214 / WG-78 services Data Comm Lab capabilities To be done / Work in progress Data Comm Lab working environment –THALES avionics and ground test equipment –Honeywell avionics –Rockwell Collins avionics –FAA Tech Center ground system Data Comm Lab Architecture Prototype and Validation Roadmap 2

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Data Comm Lab – Validation of Services 3 CMCPDLCADS-CFIS End system applications DLIC ACM ACL AMC DCL D-TAXI D-OTIS 4D-TRAD FLIPINT WP 1 WP 2 DLIC ACM ACL AMC DCL D-TAXI D-ATIS Lab Validation Capabilities Standards June 2011 Complete by:Services It is anticipated that such services will be validated by other validation projects as part of SESAR. This also holds true for the validation of D-OTIS. The time-frame for this validation will be 2013 ?? Services Validation Capabilities

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) FAA Data Comm / Industry Partnerships (OTAs) Rockwell Collins –RTCA SC-214 / EUROCAE WG-78 WP-1 avionics Honeywell –RTCA SC-214 / EUROCAE WG-78 WP-1 avionics THALES –RTCA SC-214 / EUROCAE WG-78 WP-1 & 2 avionics –Ground System (WP-1 and WP-2) 4 Data Comm LAB Tech Center

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Data Comm LAB capabilities to Date Air / Ground VDL Mode 2 Infrastructure –Air / Ground Router with Park-Air radio interface –Ground / Ground Router for routing and discovery –RF radio cloud –Addressing Plan for end to end connectivity (routing / discovery and forwarding) CMA (end system application) –Based on ICAO DOC 9880 end system requirements –Based on RTCA SC-214 ATS Interop Requirements PM_CPDLC (end system application) –Based on ICAO DOC 9880 integrity algorithm –Based on RTCA SC-214 ATS Interop Requirements 5

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Data Comm LAB capabilities to Date (cont..) PM_CPDLC end system integration –Integrated Tech Center CPDLC end system with both Rockwell Collins, and Honeywell CPDLC end systems Via air / ground infrastructure –Developed logging and tracking database for all message exchanges at all levels of the protocol stack Developed GUI –Contains the entire RTCA SC-214 / EUROCAE WG-78 message set for generation / scripting, and display of messages –Developed supportive test tools under the GUI to allow for greater flexibility in decoding and encoding of messages Installed and Integrated THALES Air FANS workstation with Ground FANS workstation –As an initial delivery under the OTA –Supports RTCA SC-214 / EUROCAE WG-78 DCL service 6

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) To be done / Work in progress Develop common TEST procedures / cases (in progress) –Addresses the Interoperability Requirements –Test procedures / cases must be common across all platforms Develop Traceability Matrix Document (in progress) –Traces the Test procedures / cases with Ground System requirements, and SC- 214 requirements Develop PM_FIS (end system application) (in progress) –Based on ICAO DOC 9880 for technical requirements –Based on RTCA SC-214 for SPR, and Interop requirements –D-OTIS service under FIS (will develop D-ATIS initially for validation) Implement Link 2k+ backwards compatible requirements (in progress) –As part of the ATS interop for validation 7 Target: Jan 21, 2010 Target: Mar 24, 2011 Target: Apr 25, 2011 Target: Feb 11, 2011

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) To be done / Work in progress (cont.) Implement FANS Accommodation (in progress) –Based on Interop Requirements –FANS Interop for validation Develop Data Comm Gateway (in progress) –Supports integration of DESIREE for Data Comm outreach program –Provides interface to NIEC –Other interfaces (as necessary) Develop LAB Access Point with external partners –EUROCONTROL Experimental Center (EEC) –Oak City IFCET lab –Boeing –Airbus –Others (as necessary) 8 Target: Feb 18, 2011 Target: Mar 31, 2011 Target: May 27, 2011

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) To be done / Work in progress (cont.) Actual Validation Conduct and Reporting (WP-1) –Begin conduct January 2011 –Plan quick look reports / results March 2011 –Plan to submit Final report June

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Thales Air and Ground System 10 Initial delivery Included: Ground System Simulation and Test Facility based on THALES Air Ground Data link Server (AGDS) and message test tools HMI Dual-Stack system ATN Baseline1 CM/CPDLC/ADS-C message set (DO-280/ED-110B) Planned deliveries Include: Ground WP-1 (March 2011) A/G DSP (March 2011) AIR WP-1 (DCL only, May 2011) AIR full WP-1 (June 2011) Full WP-2 (Nov / Dec 2011)

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) 11 Tha les Air/Ground – system example Airborne Simulator Air Ground Datalink Server and Ground Simulator Tool Ground Segment Simulation and Test Facility CMU HMI Pre-production CMU VDL/2 radio Data Service Simulator Airborne Segment Simulation and Test Facility RX/TX Coax + Attenuators Ground System Simulation and Test Facility based on THALES Air Ground Data link Server (AGDS) and message test tools HMI Dual-Stack system ATN Baseline1 CM/CPDLC/ADS-C message set (DO-280/ED-110B) Planned deliveries: Ground WP-1 (March 2011) A/G DSP (March 2011) AIR WP-1 (DCL only, May 2011) AIR full WP-1 (June 2011) Full WP-2 (Nov / Dec 2011) Initial delivery:

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Honeywell Avionics Deliveries Included Link (July 2010) SC-214 WP-1 (Dec 2010) CM PM_CPDLC Link Services build WP-1 Services build 12 Ship-sets Include: Mark II CMUs MCDUs, VDRs APMs Cockpit Printers Gables Radio Tuning Panels I/O Junction Panels

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Rockwell Collins Avionics 13 Deliveries Included Link (July 2010) SC-214 WP-1 (Dec 2010) CM PM_CPDLC PM_FIS Link Services build WP-1 Services build Ship-sets Include: CMU-900 VHF-2100 (VDRs) IDC 900 (CDU) APM-900 Junction and Tuning Panels

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Tech Center Ground System Available NOW CM PM_CPDLC WP-1 SC-214 Services Comm Infrastructure G/G routers, A/G routers VDL Mode 2 GS (park-air radios RF cloud GUI (text based) In Progress / Planning : 14 Develop common TEST procedures / cases Develop Traceability Matrix Document Develop PM_FIS (end system application) Implement Link 2k+ backwards compatible reqs. Implement FANS Accommodation requirements Develop Data Comm Gateway (for DESIREE) Develop LAB Access Point with external partners

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) 15

Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) RTCA SC-214/EUROCAE WG-78 Prototype/Validation Roadmap Rockwell Avionics (WP-1) Validation Phase – procedures and conduct Tech Center Ground system (WP-1 & WP-2) RTCA SC-214/EUROCAE WG-78 Green Cover Aug 2010 Test Syntax (all messages) Dec 2010 (Blue Label # 2) WP-1 Services June 2011 Test WP-2 Nov 2010 Test Plan / Procedures FRAC process 2009 Honeywell Avionics (WP-1) Dec 2010 (Build # 2) WP-1 Services July 2010 (Build # 1) Limited Services ASN.1 syntax Thales Avionics (WP-1 & WP-2) WP-2 (avionics) May /78 DCL ATN/FANS June 2011 Full WP-1 Services ATN/FANS Dec 2011 Full WP-2 Services ATN/FANS WP-1, WP-2 Test Plan, procedures, scenarios Prototype & Validation Plan v1.0 (Sept 2009) 16 July 2010 (Blue Label # 1) Limited Services ASN.1 Syntax Dec 2010 Test WP-1 Prototype & Valid Plan v2.0 (Dec 2010) WP-1 services (avionics) Thales Ground System (WP-1 & WP-2) WP-2 (ground system) Dec /78 DCL ATN/FANS March 2011 Full WP-1 Services ATN/FANS Nov 2011 Full WP-2 Services ATN/FANS Dec 2010 (Phase 4) WP-1 Services Aug 2010 (Phase 3) Limited Services ASN.1 Syntax Sept 2011 (Phase 5) WP-2 Services + A/G Subnetwork May 2010 (Phase 2) Lab tools/infra Feb 2010 (Phase 1) Initial Lab Env. WP-2 (ground system) …….Data Comm demos/trials… 