Aquarius Simulation Studies Gary Lagerloef Aquarius Principal Investigator Algorithm Workshop 9-11 March 2010.

Slides:



Advertisements
Similar presentations
F. Wentz, T. Meissner, J. Scott and K. Hilburn Remote Sensing Systems 2014 Aquarius / SAC-D Science Team Meeting November ,
Advertisements

Calibration and Validation Studies for Aquarius Salinity Retrieval Shannon Brown and Sidharth Misra Jet Propulsion Laboratory, California Institute of.
Aquarius Status Salinity Retrieval and Applications D. M. Le Vine NASA/GSFC, Greenbelt, MD E. P. Dinnat, G. Lagerloef, P. de Matthaeis, H. Kao, F.
The Aquarius Salinity Retrieval Algorithm Frank J. Wentz and Thomas Meissner, Remote Sensing Systems Gary S. Lagerloef, Earth and Space Research David.
Maintaining and Improving the AMSR-E and WindSat Ocean Products Frank J. Wentz Remote Sensing Systems, Santa Rosa CA AMSR TIM Agenda 4-5 September 2013.
Sea water dielectric constant, temperature and remote sensing of Sea Surface Salinity E. P. Dinnat 1,2, D. M. Le Vine 1, J. Boutin 3, X. Yin 3, 1 Cryospheric.
Cold Sky Calibration Aquarius: D. M. Le Vine MWR: J. C. Gallo.
Scatterometer Algorithm Simon Yueh, Alex Fore, Adam Freedman, Julian Chaubell Aquarius Scatterometer Algorithm Team July 19, 2010 Seattle.
Roughness Correction Working Group Report July 21, 2010 Seattle 6 th Aquarius/SAC-D Science Team meeting.
Aquarius/SAC-D Mission Validation Working Group Summary Gary Lagerloef 6 th Science Meeting; Seattle, WA, USA July 2010.
Aquarius/SAC-D Mission Mission Simulators - Gary Lagerloef 6 th Science Meeting; Seattle, WA, USA July 2010.
Aquarius/SAC-D Mission Error Validation and Early Orbit Corrections Gary Lagerloef 6 th Science Meeting; Seattle, WA, USA July 2010.
Aquarius/SAC-D Mission Error Validation and Early Orbit Corrections Gary Lagerloef 6 th Science Meeting; Seattle, WA, USA July 2010.
This poster concerns the on-orbit validation of the antenna beam pointing and corresponding instantaneous field of view (IFOV) earth location for the CONAE.
MWR Algorithms (Wentz): Provide and validate wind, rain and sea ice [TBD] retrieval algorithms for MWR data Between now and launch (April 2011) 1. In-orbit.
May 15, 2013 Space Weather Product Team (SWPT) Making Sense of the Nonsensical.
Determining the accuracy of MODIS Sea- Surface Temperatures – an Essential Climate Variable Peter J. Minnett & Robert H. Evans Meteorology and Physical.
Ifremer Planning of Cal/Val Activities during In orbit commisioning Phase N. Reul, J. Tenerelli, S. Brachet, F. Paul & F. Gaillard, ESL & GLOSCAL teams.
Aquarius Algorithm Meeting To Do Lists. From Frank Wentz:  Implement Ruf RFI flagging  Implement other QC flags  Further test review, and finalize.
MWR Roughness Correction Algorithm for the Aquarius SSS Retrieval W. Linwood Jones, Yazan Hejazin, Salem Al-Nimri Central Florida Remote Sensing Lab University.
SMOS QWG-5, 30 May- 1 June 2011, ESRIN Ocean Salinity 1 1.Commissioning reprocessing analysis 2.New processor version: improvements and problems detected/solved.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
John T. Gunn, AVDS Manager Earth & Space Research 1910 Fairview Ave. E., Suite 210 Seattle, WA Ph: ; 1 st Joint GOSUD/SAMOS.
Evaluation of Microwave Scatterometers and Radiometers as Satellite Anemometers Frank J. Wentz, Thomas Meissner, and Deborah Smith Presented at: NOAA/NASA.
Calibration and Validation Studies for Aquarius Salinity Retrieval PI: Shannon Brown Co-Is: Shailen Desai and Anthony Scodary Jet Propulsion Laboratory,
SCIENCE PROCESSING OVERVIEW David Le Vine Aquarius Deputy PI 07 July 2009.
T. Meissner, F. Wentz, J. Scott, K. Hilburn Remote Sensing Systems ESA Ocean Salinity Science and Salinity Remote Sensing Workshop November.
SPCM-9, Esac, May 3 rd, 2012 MODEL-INDEPENDENT ESTIMATION OF SYSTEMATIC ERRORS IN SMOS BRIGHTNESS TEMPERATURE IMAGES J. Gourrion, S. Guimbard, R. Sabia,
Level 2 Algorithm. Definition of Product Levels LevelDescription Level 1 1A Reconstructed unprocessed instrument data 1B Geolocated, calibrated sensor.
OS-ESL meeting, Barcelona, February nd, 2011 OTT sensitivity study and Sun correction impact J. Gourrion and the SMOS-BEC team SMOS-BEC, ICM/CSIC.
Ocean Surface Topography Calibration and Performance Assessment of the JMR and TMR Shannon Brown, Shailen Desai, Wenwen Lu NASA Jet Propulsion Laboratory.
An Intercalibrated Microwave Radiance Product for Use in Rainfall Estimation Level 1C Christian Kummerow, Wes Berg, G. Elsaesser Dept. of Atmospheric Science.
Aquarius Algorithm Workshop Santa Rosa, CA 9 March 2010 College of Engineering Department of Atmospheric, Oceanic & Space Sciences Chris Ruf University.
SMOS QWG-6, ESRIN October 2011 OTT generation strategy and associated issues 1 The SMOS L2 OS Team.
Space Reflecto, November 4 th -5 th 2013, Plouzané Characterization of scattered celestial signals in SMOS observations over the Ocean J. Gourrion 1, J.
Workshop Agenda: Day One 9:30 IntroductionLagerloef / Le Vine 9:45 Workshop objectivesG. Feldman 10:00 Overview of the Aquarius Data Processing System:G.
The New Geophysical Model Function for QuikSCAT: Implementation and Validation Outline: GMF methodology GMF methodology New QSCAT wind speed and direction.
Cal/Val Discussion. Summary No large errors in rain, freshening observed by Aquarius can be significant and real (up to about 3 hours on average after.
Design Features of a Boresighted GPM Core Radiometer Christopher S. Ruf Dept. of Atmospheric, Oceanic & Space Sciences University of Michigan, Ann Arbor,
Simulator Wish-List Gary Lagerloef Aquarius Principal Investigator Cal/Val/Algorithm Workshop March GSFC.
2014 Aquarius / SACD Science Team Meeting Agenda and Objectives Summarize the completion of NASA’s Aquarius 3-year prime salinity measurement mission (November.
SMOS QWG-9, ESRIN October 2012 L2OS: Product performance summary v550 highlights 1 The SMOS L2 OS Team.
Page 1 Validation Workshop, 9-13 th December 2002, ESRIN ENVISAT Validation Workshop AATSR Report Marianne Edwards Space Research Centre Department of.
VIIRS Product Evaluation at the Ocean PEATE Frederick S. Patt Gene C. Feldman IGARSS 2010 July 27, 2010.
Improved Aquarius Salinity Retrievals using Auxiliary Products from the CONAE Microwave Radiometer (MWR) W. Linwood Jones Central Florida Remote Sensing.
Mission Operations Review February 8-10, 2010 Cordoba, ARGENTINA SECTION 16.x Aquarius Science Commissioning and Acceptance Draft 2 Prepared by: Gary Lagerloef,
National Aeronautics and Space Administration Aquarius Validation Data System Overview and Status Algorithm Workshop March 21-22, 2007 John Gunn Earth.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Faraday Rotation David Le Vine Aquarius Algorithm Workshop March 9-11, 2010.
T. Meissner and F. Wentz Remote Sensing Systems 2014 Aquarius / SAC-D Science Team Meeting November , 2014 Seattle. Washington,
Level 2 Scatterometer Processing Alex Fore Julian Chaubell Adam Freedman Simon Yueh.
ADPS Science Software Development Bryan Franz NASA Ocean Biology Processing Group Aquarius Data Processing Workshop, NASA/GSFC, March 2007.
SeaWiFS Calibration & Validation Strategy & Results Charles R. McClain SeaWiFS Project Scientist NASA/Goddard Space Flight Center February 11, 2004.
The Inter-Calibration of AMSR-E with WindSat, F13 SSM/I, and F17 SSM/IS Frank J. Wentz Remote Sensing Systems 1 Presented to the AMSR-E Science Team June.
A step toward operational use of AMSR-E horizontal polarized radiance in JMA global data assimilation system Masahiro Kazumori Numerical Prediction Division.
Combining Altimeter-derived Currents With Aquarius Salinity To Study The Marine Freshwater Budget Gary Lagerloef Aquarius Principal Investigator Yi Chao.
6th Aquarius/SAC-D Science Meeting July 2010 Seattle, Washington, USA MWR Calibration pre-launch & post launch Juan Cruz Gallo (CONAE) Linwood Jones.
Aquarius Level 0-to-1A Processing Rule #1: save everything from the Level 0 data. Rule #2: never forget Rule #1! The objective is to ensure that the Level.
South Pole North Pole South Pole DD, K CONAE Microwave Radiometer (MWR) Counts to Tb Algorithm and On orbit Validation Zoubair Ghazi 1, Andrea Santos-Garcia.
SMOS Science Meeting September 2011 Arles, FR Simulating Aquarius by Resampling SMOS Gary Lagerloef, Yann Kerr & Eric Anterrieu and Initial Results.
A New Ocean Suite Algorithm for AMSR2 David I. Duncan September 16 th, 2015 AMSR Science Team Meeting Huntsville, AL.
Dependence of SMOS/MIRAS brightness temperatures on wind speed: sea surface effect and latitudinal biases Xiaobin Yin, Jacqueline Boutin LOCEAN.
Universitat Politècnica de Catalunya CORRECTION OF SPATIAL ERRORS IN SMOS BRIGHTNESS TEMPERATURE IMAGES L. Wu, I. Corbella, F. Torres, N. Duffo, M. Martín-Neira.
Mission Operations Review 08 – 10 February 2009 Falda del Carmen, Córdoba, ARGENTINA SECTION 16 Aquarius Launch and Commissioning Operations Ron Boain,
T. Meissner, F. Wentz, J. Scott, K. Hilburn Remote Sensing Systems 2014 Aquarius / SAC-D Science Team Meeting November , 2014.
GPM Microwave Radiometer Vicarious Cold Calibration
Roughness Correction for Aquarius (AQ) Sea Surface Salinity (SSS) Algorithm using MicroWave Radiometer (MWR) W. Linwood Jones, Yazan Hejazin Central FL.
Frank Wentz and Carl Mears Remote Sensing Systems, Santa Rosa CA, USA
Aquarius SSS space/time biases with respect to Argo data
Launch and On-orbit Checkout
Presentation transcript:

Aquarius Simulation Studies Gary Lagerloef Aquarius Principal Investigator Algorithm Workshop 9-11 March 2010

Algorithm Workshop 2 Santa Rosa, 9-11 March 2010 G. Lagerloef, et al. Simulator studies Salinity Satellite Mission Outline IOC phase preparation –Crossover analysis –AVDS matchups & other de-bias approaches On-orbit anomalies and calibration drifts Potential scenarios (i.e. with noise/error) –Insert arbitrary biases in all 12 channels Timetable between now and ORR (Sep 2010)

3 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie Early Orbit and Commissioning C-3

4 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie Aquarius Instrument Commissioning Timeline

5 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie Aquarius Commissioning Science Tasks

6 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie

Remove orbit errors Beam 2 SSS (with constant and harmonic errors added) Adjusted Beam 2 SSS (with constant and harmonic errors removed) Beam 1 SSS (with harmonic errors added) Adjusted Beam 1 SSS (with harmonic errors removed) Continue algorithm development and test with new simulator data

8 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie 1 March 2010: Science simulator – CY2007 Level 2 (swath) and Level 3 (gridded map) files released 9-11 March 2010: Aquarius algorithm science team workshop, Santa Rosa, CA 30 March 2010 until Launch: – Operational simulator generates daily files, – Analysis and evaluation by science team 1 April – to – ORR: (September) – Science team develops and tests Aquarius commissioning phase analysis tools. – Use simulators and tools to develop and test case studies, anomalies and rehearsals July 2010: Aquarius/SAC-D Science Team meeting, Seattle ORR: Final commissioning phase plan; analysis tools tested and ready. Science Implementation Milestones

Algorithm Workshop 9 Santa Rosa, 9-11 March 2010 G. Lagerloef, et al. Simulator studies Salinity Satellite Mission Approaches to De-biasing Each radiometer needs to be independently calibrated First try to remove the gross offsets in the initial retrieved SSS –Use reference salinity field globally –AVDS matchups – tabulate for each beam –Cross-over analysis to remove residual inter-beam biases With time, work through the re-calibration of retrieval coefficients Buoy Obs. Search Radius Match-up processing One match-up file per buoy observation contains all the satellite data in the search radius Subsequent processing to generate the optimal weighted average satellite observation per buoy Global tabulations Match-up processing One match-up file per buoy observation contains all the satellite data in the search radius Subsequent processing to generate the optimal weighted average satellite observation per buoy Global tabulations

Algorithm Workshop 10 Santa Rosa, 9-11 March 2010 G. Lagerloef, et al. Simulator studies Salinity Satellite Mission Potential scenarios / rehearsals Simulate certain special situations to test and analyze Develop and test analysis tools Demonstrate we can address these issues at ORR Insert arbitrary biases in all 12 channels Simulate arbitrary drifts in all 12 channels Orbit harmonics calibration drifts (1-4 harmonics, e.g.) Simulate a complete cold sky maneuver Solar flare RFI Attitude offsets Channel failure –H or V channel –P or M channel Other suggestions … lunar, bi-static solar reflection, diffuse galaxy refl.

Algorithm Workshop 11 Santa Rosa, 9-11 March 2010 G. Lagerloef, et al. Simulator studies Salinity Satellite Mission Approach Generate a set of special case 7-day cycles –Specify cases: biases, drifts, etc Decide who generates them? ADPS or RSS? Generate these scenarios with either the 2007 simulator or the operational simulator. Timetable: –30 May: Produce scenarios (L2 files) –June-July: Analysis; preliminary results at July Science meeting –August: Assess results (special workshop?) –September: ORR

Algorithm Workshop 12 Santa Rosa, 9-11 March 2010 G. Lagerloef, et al. Simulator studies Salinity Satellite Mission Other issues Filename convention: add cycle/orbit numbers ? –103 orbits per cycle –When to start cycle #1? Alternative retrievals –1st Stokes only –H or V only –Use Tp and Tm –Different algorithms for different beams depending on specific channel behavior.

Algorithm Workshop 13 Santa Rosa, 9-11 March 2010 G. Lagerloef, et al. Simulator studies Salinity Satellite Mission Back-up Slides with detail activities for each commissioning phase Science Task

14 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie Science Task 1 Task: Generate simulated data for radiometer (TA) and scatterometer (sigma0); Simulation reflects actual orbit and spacecraft attitude; 7-10 days of data simulated; Prepared 5 days prior to instrument turn-on (for use by engineering team) and updated as necessary. Available to engineering team on location at MOC. Objectives: Engineering: Simulated TA and sigma0 for the engineering team to use during on-orbit check out to judge reasonableness of the actual measured signals; Science: A reference signal for use by science team to begin evaluation of the science quality of the first signals. Representative Roles and Responsibilities: Wentz: Radiometer TA simulations; Yueh: Scatterometer Sigma0 simulations.

15 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie Science Task 2 Task: Examine radiometer data to judge whether or not the radiometer data is reasonable Begins on day 4 after radiometer is completely turned on; Continues through end of commissioning (PLAR); Initially, thermal stability may not be ideal. Objectives: Collect reference data prior to the turn on of other instruments (Scat and CONAE) as baseline to judge interference; Collect data to assess acceptance criteria for PLAR; Representative Roles and Responsibilities: Wentz: Examine TA to asses pointing accuracy; Le Vine: Evaluate T3 and retrieved Faraday rotation; Ruf: Evaluate RFI environment and detection algorithm; Brown: Compare histograms of actual and model TB; Lagerloef: Start processing AVDS matchups.

16 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie Science Tasks Task: Examine scatterometer data during turn on of the instrument Days 5-7 during 3-day turn-on sequence for the scatterometer; Radiometer is on and collecting data. Objectives: Examine radiometer data for evidence of scatterometer interference (engineering team will also be looking at raw data); Examine scatterometer data for reasonable behavior. Representative Roles and Responsibilities Yueh and scatterometer engineering team: Examine loopback power, noise only measurements and echo power; Yueh: Analyze correlation of sigma0 with winds (NCEP). Radiometer team (Wentz, Le Vine, Brown, others): Examine radiometer data before and after scatterometer turn-on for evidence of interference.

17 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie Science Task 6 Task: Examine Aquarius instrument data (scatterometer and radiometer) for nominal behavior Days 8-10 after both instruments are turned on completely; First nominal operation; Objectives: Continue with radiometer science data evaluation begun in Task 2; Begin evaluation of scatterometer data in nominal mode; First look at instrument stability; Comparison of data at reference sites and at cross-over points. Representative Roles and Responsibilities Ruf: Collect data for first look at “vicarious” calibration; Le Vine: Compare Faraday rotation retrieved from T3 with in situ (ground sounders) truth; Wentz: Pointing accuracy and effect of Sun; Yueh: First look at roughness correction for radiometer.

18 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie Science Task 7 Task: Nominal Aquarius instrument operation (radiometer and scatterometer) and CONAE instrument turn on; Day 11 - TBD: Nominal Aquarius operation CONAE instruments start turn on. Science team activities continue from previous tasks. Objectives: Examine radiometer data for evidence of interference from CONAE instruments; Generate first 7-day global map of SSS Continue to collect data to assess acceptance criteria for PLAR. Representative Roles and Responsibilities Science Team: Coordinate data collection with CONAE instrument turn-on to search for evidence of interference; Lagerloef: Generate reference SSS map from Argo data and de- bias Aquarius SSS output; Yueh: Roughness correction and correlation of sigma0 with NCEP and other sources of data on winds.

Algorithm Workshop 19 Santa Rosa, 9-11 March 2010 G. Lagerloef, et al. Simulator studies Salinity Satellite Mission 1.We will begin processing AVDS matchups as soon as the radiometer subsystem is turned on, including the warm-up transients. 1.Use in situ SSS and SST to estimate expected TAs for comparison to observed TAs, as well as comparing derived SSS. 2.Examine trends in observed vs expected TA difference vs wind speed. 2.We will compute cross-over differences between ascending and descending passes to: 1.Monitor the drifts and offsets of channels relative to each other 2.Look for solar interference signature 3.Examine consistency to TA differences for various channels vs incidence angle difference and pointing accuracy 4.Detect and remove retrieved SSS biases between channels and produce a preliminary composite SSS map. 3.Data Requirements: L2 science data file immediately after processing 4.Tools: 1.AVDS-ADPS matchup processing is mature – will continue testing with operational simulator. 2.AVDS matchup processing tools are being written – designed to tabulate satellite-in situ differences and ancillary data. 3.Analysis tools will be developed in an evolutionary process as we work with matchups with the operational simulator.

20 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie Post-launch in-orbit checkout simulation: During the period from launch to L+25 days, the science team will compute simulated Tb and σ 0 based on the final orbit after maneuvers (Science Task 1) – These data will provide “Expected Values” for each beam along-track to compare quantitatively with observations for both the engineering and science acceptance analyses The science team will carry out an analysis sequence (Science Tasks 2-7) at each stage of the instrument turn-on sequence Acceptance criteria are limited: – The timeline only allows for one 7-day cycle after the instrument is fully turned on – Assess whether the data are “as expected” in qualitative terms and the sensor is “calibrate-able” – Gross geographical and geophysical features are as expected, biases can be removed, stability is reasonable, polarization differences are appropriate, etc. (details below) Science Commissioning Approach

21 of 7 February 8-10, 2010 Section 16 – AQ Launch & Commissioning Ops Mission Operations Revie Engineering Evaluation of the Instrument Complete – Internal checks are complete and nominal (temperature, voltage, currents, telemetry) – Instrument L3 requirements are met Antenna deployment is nominal Thermal control system nominal Radiometer Specific Criteria – Radiometer internal performance nominal (consistent with observations pre-launch) Gain, NEDT, Counts Level, Noise Diode Ratios – Radiometer gain stability nominal at the operational thermal set point – Antenna Pointing Verified (scenes and transitions where expected) – Interference from Scatterometer or other SAC-D instruments within specifications – Predictable Science Response (consistent with simulations) Land - ocean features evident in radiometer brightness temperature (Tb) both in contrast and location; Relative polarization levels (V compared to H) for each beam are consistent with the emissivity model; Relative levels of Tb among beams is consistent with emissivity model (e.g. V-pol signal increasing and H-pol decreasing with increased incidence angle); The 3 rd Stokes signal consistent with expectation (small signal varying with Faraday rotation); – Reasonable initial “first-look” 7-day salinity map consistent with climatology Scatterometer Specific Criteria – Receiver gain and receiver noise within expected range – Transmit power-receive gain product (loopback) within expected range – Losses of cables between RFE and OMT are stable (inferred from CND; applies to radiometer) – Antenna pointing stable (land-water signals as expected and repeatable) – σ 0 of ocean and land within expected range for each beam. Preliminary Acceptance Criteria