Metro Highway Program Presentation to CMAA Abdollah Ansari

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Los Angeles County Metropolitan Transportation Authority Simulating I-710 Corridor Presented in the Western ITE Annual Meeting Santa Barbara, California.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Los Angeles County Metropolitan Transportation Authority Douglas R. Failing, P.E. Executive Director, Highway Program Public Private Partnerships CTF Transportation.
1 HACIA NETWORKING EVENT Jose Rios, P.E.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Douglas R. Failing, P.E. Executive Director, Highway Program LA Metro’s Highway Program LA Metro’s Highway Program May 10, 2013 Construction Management.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
By Jerry R. Wood Director of Engineering Gateway Cities Council of Governments for OLDA/PEROW September 12, Congestion Hot Spots for the SR-91 /
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Department of Transportation Final Recommendation of SR-710 Pasadena Working Group Regarding Proposed Alternatives for SR-710 North Project Council Meeting.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Current Construction Projects Major Projects Pinellas County.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
Los Angeles County Metropolitan Transportation Authority ACEC-LA Luncheon February 12, 2014 Frank Quon, P.E. Executive Officer, Highway Program.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
MOBILITY 2030: THE METROPOLITAN TRANSPORTATION PLAN FOR THE DALLAS-FORT WORTH METROPOLITAN AREA North Central Texas Council of Governments Transportation.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
San Bernardino Associated Governments Garry Cohoe, Director of Freeway Construction April 13, 2010.
LA Metro’s Highway Program May 29, 2014
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
High Desert Corridor -New State Route 138/E-220 Agency coordination Meeting March 2011 “We’re here to get you there!”
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Department of Transportation Submittal of Comments to Caltrans Regarding the Draft Environmental Impact Report/Environmental Impact Statement and Proposed.
Transportation Finance Advisory Committee May 18, 2012.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
State Route 99 Corridor Update Kome Ajise District 10 Director Caltrans.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Program Manager Administrator
MED SR 18 Corridor Project MED PID October 13, 2015.
Metric to English Conversion California Bridge Construction Forum March 8, 2006 Mark Leja, Chief, Division of Design California Department of Transportation.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Improvements to Stockton Street
Orange County Transportation Authority
TVTC Impact Fee Update Nexus Study January 30, 2008
Interstate 15 North Phase 4
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
River to Sea TPO Meeting US 92/International Speedway Boulevard
Florida Transportation Commission FY 2009
SB 1 and Capital Program Update
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

Metro Highway Program Presentation to CMAA Abdollah Ansari Deputy Executive Officer Metro Highway Program December 2015

Measure R Tax Dollars at Work

Current Workload Over 300 Projects Program Value $36 Bil.

Funding For Highway Projects Numbers are rounded

Highway Projects

Construction Completed or In Progress Widening and HOV Lanes Widening and HOV Lanes Early Action Projects Widening Direct HOV Connector

Phases of Project Development Process Project Initiation Documents (PID) Project Approval/Environmental Document (PAED) Plans, Specifications, and Estimates (PS&E) Construction North County

HDC High Desert Corridor Project Summary 63 miles - Highway, Expressway, Tollway, High Speed Rail, Bikeway, and energy production and/or transmission corridor In PAED phase Connecting North LA County and SB County (Victorville) Transit connection between the CHSR and the XpressWest Secured Funds-$30 Million (Measure R) Estimated cost: $8.9 bil. Status Update The Preferred Alternative selected in July 2015 - all components included. Final EIR/EIS in early 2016

HDC High Desert Corridor

Northwest SR-138 Project Summary Status Update 36 miles from Interstate 5 to State Route 14 PA/ED in progress Freeway/Expressway/conventional highway $25M Measure R through PA&ED Funding for subsequent phases needs to be determined Estimated Project Cost: $700 Million Status Update Final EIR/EIS approval in early 2017

Northwest SR-138 Alternatives Studied

I-5 North HOV (HOT) Lanes Project Summary 14 miles widening and HOV lanes from SR-14 interchange to Parker Road Potential construction as or conversion to HOT lanes Modification of 8 bridges, pavement rehabilitation, auxiliary lanes between interchanges, and installing a new fiber network Estimated Cost of the Widening Project: $784 Million Study Area Status Update Final design to start in early 2016 for 2.5 years

State Route 710 Project Summary Study Area Status Update $780M in Measure R funds In Environmental phase Preliminary Cost Estimate: $6Billion 5 Alternatives Under Study: No Build Alternative Transportation System Management/Transportation Demand Management (TSM/TDM) Bus Rapid Transit Freeway Tunnel Light Rail Transit Alternative Study Area Status Update Comment period ended in early August Final EIR/ Approval in May 2017

I-710 South Project Summary 18 miles between the Ports of Long Beach and Los Angeles and the SR-60 Alternatives being pursued: Alt. 5C: One lane + other upgrading Alt. 7: 5C + 4-lane freight corridor Estimated High Cost: $8 billion Project funded through PA&ED phase Includes “Early Action” Projects Study Area Status Update Final EIR/EIS: November 2017

I-605 “Hot Spots” Project Summary Study Area 2012 Feasibility Study 91 60 5 405 Study Area 2012 Feasibility Study Identified congestion hot spots along I-5, SR-91, I-605, and I-405 Freeway widening/additional lanes, ramp reconfigurations, arterial intersection enhancements, signage, and safety features PIDs and PA/EDs in progress for various projects Estimated total cost of projects in the corridor: $6+ billion Status Update Various projects upcoming and in progress

I-605/I-5 Interchange PAED contract was awarded in November 2015 4-year study to be completed by Summer 2019 Next step: PS&E Estimated Construction Cost: $1.2 billion Paramount Slauson Florence I-105

I-605/SR-91 Interchange PAED for Westbound SR-91 improvements between Shoemaker and I-605 in Procurement. Next steps: PS&E Possible PAED for the remainder of the interchange – RFP in 2016 Estimated Construction Cost: $100+ Million

I-605/SR-60 Interchange PSR-PDS Completed in 2015 PAED RFP in 2016 3-Yr. Study Anticipated Next Step: PS&E Estimated Construction Cost: $900+ Mil. Santa Anita Ave. Turnbull Cnyn. Rd. Rose Hills Rd.

I-710/SR-91 Interchange PSR-PDS Contract Awarded in November 2015 15-month study period Estimated Construction Cost: $430 mil. Del Amo Rosecrans Central Paramount

I-605/I-405 Interchange Add 2 lanes on I-405 from the Orange County Line to Improvements to local interchanges Feasibility study completed Next Step: PSR-PDS Date TBD Estimated Construction Cost: $580+ Million

SR-71 Improvements Upgrade from 4-lane expressway to 8-lane freeway Phase 1: Mission Blvd. to SR-60 Phase 2: Mission Blvd. to I-10 Estimated Construction Cost: $340+ Million

Estimated Construction Start Dates Project Estimated Construction Start* HDC 2023 Northwest SR-138 2021 I-5 North HOV (HOT) Lanes 2019 State Route 710 (North) I-710 (South) I-605/I-5 Interchange Improvements I-605/SR-91 Interchange Improvements 2022 I-605/SR-60 Interchange 2024 I-710/SR-91 Interchange 2025 I-605 Corridor Arterial Improvements Var. As early as 2016 SR-71 Improvements 2020 (Phase 1) I-605/I-405 Interchange Improvements 2026 * All dates subject to availability of finds and completion of earlier milestones.

Local Projects Subregional Highway Operational Improvement Projects I-605 Arterial Improvement Projects Roadway widening/Improvements Traffic signal Synchronization/updating Bicycle lanes local interchange improvements Bridge Improvements Soundwalls

For more information on Metro Highway Program Projects, Please visit: https://www.metro.net/projects/category/interstate_projects/