CALICE SiW EcalAboud Falou/ LAL-Orsay 03-06-081 Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Manchester 09/sept/2008 A.Falou & P.Cornebise {LAL-Orsay} 1 SLAB Integration & Thermal Measurements Slides Overview Thermal Measurements (Demonstrator)
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
FEV Boards status N. Seguin-Moreau on behalf of
Thermo-mechanical activities at Valencia V. Castillo, C. Lacasta, A. Oyanguren, P. Ruiz PXD support (IFIC - Valencia) 26/7/2011.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Rémi CORNAT (IN2P3/LLR) - CALICE electronics meeting - LAL, June 2 nd ECAL electronics Rémi CORNAT LLR (CNRS/IN2P3) -Roadmap -Mechanics -LV Power.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Thursday Sept 17, 2009CALICE week IPN Lyon1 EUDET Module Plans of integration and assembly Julien Bonis SLAB assembly : Process phases.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
M. Sannino for S. Cuneo - I.N.F.N. Genova1 Rich2 MAPMT Housing & Cooling Outdated designs and what is needed to get a final executive design Imperial College.
– EUDET module – Report from Mechanics Brainstorming Marc Anduze – 30/06/2009 Laboratoire Leprince Ringuet Ecole polytechnique - Palaiseau.
Spacing of Cu clamp = 10” Clamp plate width = 2.5”, thickness = 0.375” Thickness of conductor insulation = 0.03” Thickness of coil ground wrap = 0.03”
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Monday June 8, 2009CALICE SiW ECAL Meeting ULC London EUDET prototype Thermal drain and plans for module assembly Julien Bonis CAD model.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
CALICE calorimeters Power Issues Kieffer Robert IPN Lyon « Linear Collider Power Distribution and Pulsing workshop » May 2011, LAL
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Thermal jumble! (Action list review) C. Marinas IFIC-Valencia DEPFET-Valencia 1 Valencia
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
Liverpool March 09 Irradiation Meeting. Graham Beck (QMUL) 1 Dissipated Power: Sensor (at -10C, 200V bias, after protons/cm 2 ) ~ 1W (×3 for.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
ECAL EUDET MODULE Summary talk
The CSOI approach for integrated micro channels
Hybrid Pixel R&D and Interconnect Technologies
? ENDCAP: Mechanics IFIC-Valencia.
CALICE Collaboration Meeting at UT Arlington
CALICE Collaboration Meeting KEK/Japan – April 2015
Module/Ladder Assembly
Ecal Front End Electronics
Manufacturing Processes
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step I assembly} Flip Soft Ladder {A.S.U up side down tilt} Main Integration Cradle Thermal & Integration Training Mockup

CALICE SiW EcalAboud Falou/ LAL-Orsay SLAB cross section/ thickness budget  Outer envelop (housing) : 100 µm {omega shape clamped to H+W stave}  Heat shield (Cu) : 400 µm  Electrical non-conductor foam : 150 µm {Thermal diffuser & conductor material}  PCB : 800 µm (tolerances : ± ?) but chips embedded in PCB ?  Thickness of glue : <100 µm ? study of the size of dots  Thickness of wafer : 320 µm  Kapton ® film HV feeding : 100 µm - OK (DC coupling)  Thickness of W : 2100 µm (± 80 µm)

CALICE SiW EcalAboud Falou/ LAL-Orsay Space Frame Ladder A.S.U interconnection & HV feeding  Std Aluminum structure : free access to A.S.U interconnection, HV feeding & DIF + Terminal boards. 1.HV kapton clamping to the space frame ladder 2.unit-1 A.S.U insertion into the ladder & HV connection {disconnection process to be studied} 3.unit-2 A.S.U insertion, into the ladder & HV connection 4.unit-1 to unit-2 interconnection {kapton bridge technique could answer major specifications} 5.Electrical qualification & unit-3, unit-4, etc… insertion 6.Full electrical qualification after DIF + Terminal boards integration

CALICE SiW EcalAboud Falou/ LAL-Orsay Flip Soft Ladder full sensitive SLAB handling  Std Aluminum structure : adequate ‘soft rubber’ edges as direct contact with sensitive SLAB components 1.Mechanical connection of the flip soft ladder to the space frame ladder {all sensitive parts are ‘sandwich’ maintained in-between} 2.Clamping of the sensitive parts to the flip soft ladder 3.Removal of the space frame ladder {full access to HV kapton feeding} 4.Sensitive SLAB + soft ladder clamping to integration cradle {to be operated ‘under’ the cradle, H+W structure already installed} 5.180° up side down tilt of the assembly and soft ladder removal {HV kapton feeding & sensitive SLAB safely clamped to the cradle}

CALICE SiW EcalAboud Falou/ LAL-Orsay Main Integration Cradle H+W structure, sensitive SLAB & Thermal shielding  Std Aluminum structure : fully adapted to the H+W structure which is the direct support of sensitive SLAB & thermal shielding 1.Lateral & ‘opposite’ clamping of the H+W structure to the main cradle {sensitive slab + soft ladder free access to H+W structure} 2.After soft ladder removal, summary electrical checking of all sensitive parts {A.S.U + HV feeding + DIF + terminal boards} 3.Electrical insulator foam application {no glue required} 4.Cupper shielding insertion {possible thermal grease but no glue required} 5. Cu full clamping to H+W structure with omega shape housing {H+W lateral grooves are used to clamp Ω enveloppe}

CALICE SiW EcalAboud Falou/ LAL-Orsay Thermal & Integration training Mockup mechanical handling & thermal measurements  Heat dissipation 14.4mW/PCB : PCB ( µm), kapton heaters, T°C sensors, data controller, etc… 1.One PCB, 8 kapton heaters, 8 T°C sensors (strain gages) {thermal setup in progress at LAL-Orsay} 2.Cupper shielding, electrical insulator foam & Ω shape housing will be added to complete the setup 3.LPSC cooling device & alveolar structure could be integrated to the this thermal setup {real state confinement at LAL, LPSC or LLR}