Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Project Management Concepts
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
WebCast 5 May 2003 NERC Cyber Security Standard Overview of Proposed Cyber Security Standard.
1 Susan Weigert, Project Officer GSEGs Overview of GSEG Management.
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
S/W Project Management
Texas Regional Entity Compliance Report TAC July 9, 2009.
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
Prepared by Opinion Dynamics Corporation May 2004.
PRODUCT TRANSFER.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU. Quality Assurance José Viegas Ribeiro IGF, Portugal SIGMA.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
May 16, 2007 Board of Directors Texas Regional Entity Division Update Sam R. Jones ERCOT President & CEO.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
ERCOT RMR Contract Status Report Presented To The ERCOT Board Of Directors December 17, 2002 Sam Jones, COO.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
1 Business Integration Update to PRS September 20, 2012.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
NERC Reliability Standards - Development Process: Involvement & Needs Presentation to MOSC January 14, 2004 Khaqan Khan Independent Electricity Market.
ERCOT PROGRESS REPORT Board of Directors Austin, Texas October 15, 2002.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
ERCOT Operational Audit 2005 August 1 - August 19, 2005.
Standards Review Subcommittee Update August 17, 2010.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
1 TAC Report to the ERCOT Board February 16, 2005.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
System Operations Report To The Board Of Directors September 21, 2004 Sam Jones, COO.
1 Nodal Credit Update at WMS June 16, 2010.
PMO Update to RMS Troy Anderson Program Management Office December 7, 2005.
TEXAS NODAL Market Design Structure and Process August 19, 2003.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
1 TAC Report to the ERCOT Board November 14, 2006.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
= © Property of ERCOT 2001 ERCOT Response to the Nov. 5, 2002 Operational Audit Briefing to ERCOT Board of Directors November 19, 2002.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
ERCOT Wholesale Market SubcommitteeJanuary 12, ERCOT Wholesale Market SubcommitteeJanuary 12, ERCOT/IMM/PUCT Proposal for Redaction of State.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
NERC Transmission System Vegetation Management Standard ERCOT TAC Update Mike Boone – CenterPoint Energy John Schechter – AEP August 4, 2005 Austin, TX.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
WECC Regional Standards Update
Workshop Session 1: Overview
Workshop Session 1: Overview
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Presentation transcript:

Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO

Grid Operations Procedures Compliance Review Performed by the ERCOT Compliance Group October 6 – 17, 2003 Review was for control room operator compliance with the ERCOT Operating Procedures

Overview The 2002 Operations Audit was performed by Price, Waterhouse Coopers. ERCOT Operations management decided to utilize the ERCOT Compliance Group for the 2003 operations review to obtain a more comprehensive review and improve the training efforts The internal review performed by the ERCOT Compliance Group was far more strict than the 2003 operations audit performed by Price, Waterhouse Coopers Internal reviewers had significant electric utility experience Internal reviewers had comprehensive knowledge of the operating procedures

Overview (con’t) Review did not consider partial credit – any discrepancy for any reason was logged as non-compliant Review included the use of historical databases for periods when the reviewers were not in the control room The 2003 review showed significant improvement over 2002 results 2002 PWC audit resulted in a 67% full compliance finding 2003 Internal review resulted in an 87% full compliance finding despite increased strictness There was concern over the number of frequency desk non- compliance findings

Discussion Of Findings No significant reliability concerns were identified There were four noncompliant findings that ERCOT Operations considers to be areas of concern that will be addressed through procedure review and training –Communications requirement –CPS1 performance monitoring requirement –Two logging requirements There were four noncompliance findings that ERCOT Operations considers to be random, one time occurrences that will be addressed through training

Discussion Continued There were 16 noncompliant findings that ERCOT Operations considers to be the result of the procedures being too prescriptive that will be corrected by review and revision of the procedures There were three noncompliant findings associated with the DC ties that were the result of non-operator activities being included in the operating procedures. These will be corrected through revising the operating procedures to include only those activities which are performed by control room operators. The operator activities were being performed by the operators at the time of the review.

Review Team Conclusions Overall operator performance was good – some findings were caused by wording in procedures requiring actions that went beyond usual task requirements – tasks were performed to expectations instead of written procedures which need to be addressed through correcting procedures (in one case one finding resulted in three noncompliant findings) Still, some findings need the attention of management to ensure consistency with good operating performance The lagging performance on the frequency desk was mostly due to what appears to be excessive procedure details

Grid Operations Observations The original operating procedures were written with significant detail as ERCOT had no prior experience with the current market design. ERCOT Operations has now gone through a rapid learning curve and is adjusting operations as required. The current challenge is to review and revise the procedures to meet the operating needs, then provide training for the operators on the procedures. Resources to accomplish this need have been limited due to the work load The staffing increase approved by the Board in the 2004 budget will provide the resources needed –Additional shift personnel to allow for training time availability –Trainers to perform the needed training

Other Grid Operations Items There have been no unusual operational incidents regarding reliability or settlement financial impact to date since the last Board meeting.

2004 RMR Contracts

Observations ERCOT staff is nearing finalization of the RMR contracts currently needed for 2004 in accordance with the revised RMR Protocols Many stakeholders believe that the revised RMR protocols will result in reduced costs for the RMR services The current estimate of the RMR costs for 2004 do not support the expectation of reduced costs 2004 RMR costs may equal or exceed the 2003 costs –2004 operating costs are based on the actual steam turbine generation unit costs and not industry average combustion turbine costs –Major and minor repair projects are permitted and are needed at units to ensure reliable operations and suitable availability –Actual costs and repair project needs will be monitored by ERCOT

NERC Standards Development Process Update

Status Of NERC Standards Development There are currently 16 proposed standards under development by NERC Seven are in the Standards Authorization Request (SAR) phase, where the need for the standard and its requirements are developed Eight are in the drafting and public comment phase One, Operate Within Limits, is in the ballot phase There needs to be more attention from the stakeholders. Only a few entities are active in the process. More companies need to join the ballot pool and participate A NERC Standards Development Bulletin will be handed out for the Board’s information. It is published monthly.

Transmission Services

Transmission Services has been very active: Supported the 2004 RMR determination Developed RMR exit strategies – at least two existing RMR units will not be needed after 2004 Worked on determining congestion relief solutions for the Northeast and DFW areas Held a workshop on the Phase 2 Voltage Stability Study Held a job fair for over 30 engineering students – will fill some of the new Transmission Services positions from these entry level applicants

RMR Exit Strategy Projects ERCOT Transmission Services is requesting Board Approval of the RMR Exit Strategy for the B. M. Davis generating units