EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.

Slides:



Advertisements
Similar presentations
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Advertisements

The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Presented by: Ronald O. Nichols LADWP General Manager
Anne Arundel County Department of Public Works
Team Sludge Team 17: Jon Reimink, Ernie Sarkipato, Josh Terpstra, Ryan Voogt.
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Consolidation Committee Briefing Orange County Utilities Department August 23, 2005.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
Town Hall Meeting 12 March 2008 Carmichael Area Aerojet Groundwater Remediation Progress Update 12 March 2008.
Wastewater Treatment & Collection System Improvements.
Fairview Township, York County May 28, 2015
City of Atlanta Department of Watershed Management Bureau of Drinking Water.
Overview and Project Approach  Clinton is currently experiencing surface water supply shortages in their raw water source, Clinton Lake, and has been.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
1 Recycled Water Program for the City of Los Angeles.
City of Savannah Water, the Lifeline of the Community.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Eric Hansen, P.E. Capital Planning Program CPUC Recycled Water Order Instituting Rulemaking (R ) San Francisco January 20, 2012 Workshop 3: Understanding.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Water System Planning Study
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
2008 Facility Plan Update May Purpose  Comprehensive Plan through 2033 –Builds on Past Work –Adjust for Changing Conditions  Identify Capacity,
City of Greeley Water & Sewer Department ● th Street, Suite 300 Greeley, CO ● (970) Making More Water Available.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager August 29, 2012 Revised August 30, 2012 Operating Agency Workgroup.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
OWASA – UNC Water Reuse System Project: A Technical and Financial Partnership to Promote More Sustainable Water Management.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Alabama Water Resources Conference Perdido Beach, Alabama Mac Underwood, General Manager BWWB BIRMINGHAM WATER WORKS BOARD Sustainability of Water Supply.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Water Advisory Board March 29, Annual rainfall
Broomfield Comprehensive Plan 2016 Update Utility Work Group Report Utility Work Group: − Bob Pearson, Coordinator − Beth Willman, Recorder − Hal Lunka.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Jazreel valley - A case study for water management and creation of new water resource 1.
What are they and how are they calculated? May 2015.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
JEA’s Initiatives and Capital Improvements Program
Capital Plan Update and Five-Year CIP
Water & Wastewater Capacity Charge Work Shop
Kings Bluff Raw Water System Parallel Raw Water Main Project
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Davie Green Water Project
Florida and Reclaimed Water
Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000
Capital Area Council of Governments
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
City of Valdosta Utilities Department.
ENG421 (5c) – Water Treatment Plant Costs
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Big Sky Wastewater Facility Plan Update
Southwest Section AWWA 2018 – Baton Rouge, LA
City of Sunrise Wastewater Reuse Program
Presentation transcript:

EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities

 Project Need  Facilities Needed  Rationale For Phasing  Options To Delay Need For Expansion  Current Status  Summary

Public Utilities Brunswick County is the fifth largest county in North Carolina, with 830 sq. miles. Brunswick County Public Utilities provides water throughout the county to retail and wholesale customers. For the past 10 years, Brunswick County has been one of the fastest growing counties in the nation.

Ave. of 4% Growth Per Year 5,700 From Existing Systems 9,700 New Customers Retail Customer Growth Jan. 1, ,212 Jan. 1, ,437 Jan. 1, ,246 Jan. 1, ,525 Jan. 1, ,059 Jan. 1, ,481 Jan. 1, ,180 Jan. 1, ,503 Jan. 1, ,534 Jan. 1, ,668

Public Utilities Water System Master Plan Completed in 2006  Identified the Need to Expand the Northwest Water Treatment Plant from 24 mgd to 36 mgd to Meet the Potable Water Needs by 2015  Identified the Need to Increase Raw Water Transmission System to Provide Additional Raw Water Transmission Capacity  Estimated Cost of Improvements Was $59 Million

Public Utilities

12 mgd Expansion of Northwest Water Treatment Plant 1. Additional 4 mg Clearwell 2. New Chemical Feed System and Chemical Storage Area 3. Flash Mix Improvements 4. New High-Service Pump Station 5. Rehab of the Existing Plant Filters 6. Replacement of Existing Plate Settlers 7. Additional Tankage Including Clarifiers and Filters 8. Additional Solids Handling Facilities 9. Additional Lab, Shop, and Administrative Areas

Public Utilities Uncertainty of Demand 1. Peak day to average day ratio of 2 to 1 2. Significant industrial demand (20% of average day demand and 12% of peak day demand) 3. Wholesale customer usage (40% of average day demand and 44% of peak day demand) 4. Weather 5. Conservation Efforts

Public Utilities Cost estimated cost $59 million 2. Average cost per customer $2, Rate increase required to meet debt service obligations 4. Political considerations

Public Utilities 2008 Decision to Construct Project in Phases 1. Conducted study to determine layout of facilities needed to expand plant treatment capacity by 12 mgd 2. Phase 1 construction to include new 4 mg clearwell, new chemical storage building, chemical feed system and associated piping 3. Phase 2 to be constructed at a later date would include high-service pump station, filter rehabilitation, new clarifiers, new filters and lab, shop, and admin expansion

Public Utilities 1. Phase 1 Was Completed in Demands Had Not Met Levels Predicted in Water Master Plan So a Reevaluation of Phasing in Decision Was Made to Divide the Remaining Phase into Two Phases 4. New Phase 2 Included High-Service Pump Station, Filter Rehab and Shop, Lab and Admin Expansion 5. New Phase 3 Includes Clarifiers, Filters, Solids Handling, and Associated Piping 6. Raw Water Transmission Improvement Delayed Until Phase 3 Improvement Started

Public Utilities 1. Conservation 2. Wastewater Effluent Reuse for Irrigation 3. Aquifer Storage and Recovery 4. Off-Line Raw Water Reservoir

Public Utilities Current Potable Water Demand Average Day in FY mgd 45% of Capacity Peak Day in FY mgd 78% of Capacity Historical Peak Day25.98 mgd 86% of Capacity

Public Utilities Factors Influencing Potable Water Demand 1. Decline in Industrial Demand (Loss of Industry) 2. Weather 3. Conservation Measures 4. Potential Loss of Largest Customer 5. Interconnection with Other Utilities

Public Utilities 1. Phase 1 Completed in Phase 2 Construction Underway and Scheduled to be Completed in Raw Water Transmission Environmental Assessment Completed and FONSI Issued 4. Phase 2 of the Aquifer Storage and Recovery Project Underway 5. Raw Water Reservoir Feasibility Study Completed 6. Design of Raw Water Transmission Main Expansion and Phase 3 of the Northwest Water Treatment Plant Now Scheduled for Projected Cost Per Customer Now $1,656

Public Utilities 1. A number of factors should be considered when deciding when to build needed infrastructure. 2. In areas with rapid customer growth, delaying the construction reduces the cost per customer and may eliminate the need for rate increases. 3. Timing is critical as you should not build the facilities before there is a need and you cannot wait until the plant capacity is exceeded.

Public Utilities