November 8, 2012. MAP-21 themes 2 Strengthens America’s highway and public transportation systems Creates jobs and supports economic growth Supports the.

Slides:



Advertisements
Similar presentations
Transportation Authorization (MAP-21) Details: Safety and Other Provisions August 23, 2012.
Advertisements

Moving Ahead for Progress in the 21 st Century (MAP-21) – ROW Impacts Dianna Nausley, HQ RES Assistant Program Administrator Washington State Department.
Idaho Project Development Conference Boise, Idaho April 2, 2013 Federal Transit Administration.
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
Performance Elements National Goals Performance Measures Performance Targets Performance Plans Target Achievement Special Performance Rules Performance.
Nicholas Finch Local Programs Engineer Federal Highway Administration Preview of Federal-aid 101 Authorization Overview: Where we are! Where are we headed?
Operations / ITS Provisions in SAFETEA-LU What’s in There and What’s Not Jeff Lindley Operations / ITS Discipline Meeting August 16, 2005.
Designated by US DOT Publication of Draft PFN for Comments - Spring 2013 Initial Designation of the PFN – Fall 2013 National Freight Network Primary Freight.
MAP Washington State Public Transportation Symposium August 26, 2013.
January 16, 2014 Federal Highway Administration Arizona Rural Transportation Summit.
MAP-21 Overview and Programmatic Impacts February 4, 2013 Serge Phillips MnDOT Federal Relations Koryn Zewers.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users P. L SAFETEA-LU.
© 2015 AMPO 444 North Capitol Street NW, Suite 345 Washington, DC tel: fax: Washington Update MAP-21 Reauthorization, Highway.
MAP-21 themes Strengthens America’s highway and public transportation systems Creates jobs and supports economic growth Supports the Department’s aggressive.
Jack Basso Director of Program Finance and Management American Association of State Highway and Transportation Officials Audit Subcommittee Meeting Phoenix,
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Highway Safety Provisions Elizabeth Alicandri FHWA.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Irene Rico Division Administrator Federal Highway Administration Moving Ahead for Progress in the 21 st Century ~ MAP-21.
Transportation Authorization (MAP-21) Details: Safety and Other Provisions August 22, 2012.
MAP-21: Bridges and Structures Moderated By Joey Hartmann Team Leader, Office of Bridge Technology Federal Highway Administration HIBT Webinar on MAP-21.
Federal MAP-21 Programs 1 Module 7 Safety Analysis in a Data-limited, Local Agency Environment July 22, Boise, Idaho.
FHWA LTAP/TTAP Update Technology Partnerships Programs 2012 LTAP/TTAP National Conference: Grapevine, TX.
Funding Levels Similar funding levels to the Transportation Enhancement Activities under SAFETEA-LU: FY 2013: $808,760,000 FY 2014: $819,900,000 Total.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
Washington Update Department of Transportation Roger Petzold Federal Highway Administration Oct. 23, 2013.
State and Federal Funding Programs for Local Agency Projects Alan Lively Local Government Section Project Delivery Specialist.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Moving Ahead for Progress in the 21 st Century Act of 2011 Potential Freight Implications FHWA Talking Freight December 2011 Tony Furst, Director FHWA.
FY 2012 President’s Budget Released February 14, 2011.
MAP-21 and Other Issues FHWA Update IFTA/IRP Manager’s / Law Enforcement Workshop September 2012.
Ohio Transportation Planning Conference July 16, 2014.
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration Regional Workshop on Performance Management and Performance-Based.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
Ron Hall Tribal Technical Assistance Program Colorado State University
MAP-21 Moving Ahead for Progress in the 21 st Century Virginia Association of Planning District Commissions October 4, 2012.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Washington Update Paul Feenstra ITS America / Keystone Public Affairs.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
U.S./Canada Transportation Border Working group April 9, 2014 Roger Petzold Office of Planning Federal Highway Administration.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
1 Moving Ahead for Progress in the 21 St Century (MAP-21) Public Law Preliminary Briefing Pioneer Valley MPO Joint Transportation Committee September.
INTRODUCTION TO FEDERAL HIGHWAY FUNDING AND ELIGIBILITY Steve Baumann Financial Specialist (503) Mike Morrow(Field Operations Engineer) Mike.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey A. Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
‘‘Moving Ahead for Progress in the 21st Century Act’’ or ‘‘MAP–21’’ Signed into Law July 6, 2012 Implications for Infrastructure Asset Management, Pavement.
Nelson Castellanos Federal Highway Administration March 12, 2013.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
Highway Program Structure Highway Recommendations Neil Pedersen Chair, ASC Highway Legislative Team Vice Chair, AASHTO Standing Committee on Highways Administrator,
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
May 21, SAFETEA Safe, Accountable, Flexible, and Efficient Transportation Equity Act of 2003.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Action 2020 Training Local Context August 15, 2012.
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
Fixing America’s Surface Transportation (FAST Act) Association of MPOs 444 N Capitol St., NW Suite345 Washington, DC
SAFETEA-LU System Management and Operations Provisions Jeff Lindley Director of the Office of Transportation Management Office of Operations Federal Highway.
Association of Metropolitan Planning Organizations Fixing America’s Surface Transportation (FAST Act) April 7, 2016.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21st Century An Update on Implementation.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 and Managing National Highway Performance Michael Nesbitt Federal Highway.
FAST, What does the new transportation bill mean to you April 6, 2016.
Welcome to Columbia!. FAST Act Signed by President Obama on December 4, 2015 First long-term authorization act in a decade Result of bipartisan cooperation.
UW - Madison Federal Highway Administration (FHWA) David L. Kopacz, P.E. Wisconsin Division Office February 20, 2015.
MAP 21 Freight Talking Freight December 14, 2011 Leo Penne AASHTO.
Nevada Transportation Conference
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
Moving Ahead for Progress in the 21st Century Act (MAP-21)
Laurie Leffler, Division Administrator
Moving Ahead for Progress in the 21st Century Act (MAP-21)
MAP-21: Current Federal Transportation Policy
Presentation transcript:

November 8, 2012

MAP-21 themes 2 Strengthens America’s highway and public transportation systems Creates jobs and supports economic growth Supports the Department’s aggressive safety agenda Simplifies and focuses the Federal program Accelerates project delivery and promotes innovation Establishes a performance-based Federal program

Stable funding Program authorized through FY14 Current law through end of FY12 Most new provisions in effect on October 1 st Avg. annual funding at FY12 levels (plus minor inflation) Extends Highway Trust Fund taxes and ensures 2 years of solvency for Highway Trust Fund (HTF) Substantial programmatic consolidation No earmarks Most discretionary programs eliminated 3

4

Program structure MAP-21Current Law National Highway Performance Program (NHPP)NHS, IM, & Bridge (portion) Surface Transportation Program (STP)STP & Bridge (portion) Congestion Mitigation & Air Quality Improvement Program (CMAQ) CMAQ Highway Safety Improvement Program (HSIP)HSIP (incl. High Risk Rural Roads) Railway-Highway Grade Crossing (takedown from HSIP) Railway Highway Grade Crossing Metropolitan Planning Transportation Alternatives (setaside from NHPP, STP, HSIP, CMAQ, and Metro Planning) TE, Recreational Trails, and Safe Routes to School 5

National Highway Performance Program 6 Funds an enhanced National Highway System, combining functions of the existing NHS, IM and Bridge Programs Enhanced NHS includes existing NHS, all principal arterials, STRAHNET, and intermodal connectors Requires an asset management plan States set targets for conditions and performance Min. standards for Interstate & bridge conditions in a State DOT to set minimum standard for Interstate pavement condition Law sets standard for NHS bridges -- no more than 10% of deck area may be structurally deficient

Surface Transportation Program 7 Continued flexible funding for Federal-aid highways, plus safety and bridges on any public road Eligibility for transportation enhancements, rec trails, ferry boats, consolidated border infrastructure program, truck parking facilities, and safe routes to schools (no set-aside) 50% of funds subject to suballocation based on population Rural provisions enhanced Rural planning organizations, if any, must be consulted Up to 15% of rural suballocation may be spent on minor collectors

Highway Safety Improvement Program Dramatically increases size of existing program Maintains current structure; adds requirement for regular update of the strategic highway safety plan Keeps setaside for rail-highway grade crossings No high risk rural roads setaside unless safety statistics worsen Secretary to establish measures and States to set targets for number of injuries and fatalities (and number per VMT) Strengthens link between HSIP and NHTSA programs 8

Congestion Mitigation & Air Quality Improvement Program Continues the current program with changes Performance plans for large TMAs (to include air quality and congestion measures) States with PM 2.5 areas must use a portion of their funds to reduce PM 2.5 Some expanded authority to use funds for transit operations Explicit support for installation of facilities serving electric or natural gas-fueled vehicles CMAQ outcomes assessment study required 9

Transportation Alternatives (TA) 10 Incorporates eligibilities from many current programs Most (but not all) formerly TE-eligible activities Recreational trails program Safe Routes to Schools program Planning, designing, or constructing roadways within the ROW of former Interstate or other divided highways Similar funding level to TEs under SAFETEA-LU Total TA $ equal to 2% of MAP-21 highway funding Funded via takedown from each State’s formula funds 50% suballocated for more local control 50% State allocation can be transferred to other formula programs

11

TIFIA 12 Lending capacity expanded – up to $17 billion in credit assistance over 2 years Notice of Funding Availability released July 27, 2012 Program reforms Letters of Interest / applications accepted throughout the year Allows TIFIA participation for up to 49% of eligible project costs Master credit agreement for programs of projects (secured by a common pledge) or phased single projects Allows up to 10% to be set aside for rural projects; for these projects, increased eligibility and lower interest rates

Freight provisions 13 National Freight Policy Establishment of National Freight Network, incl. Primary Freight Network, remainder of Interstate System, and critical rural freight corridors National freight strategic plan Freight transportation conditions and performance reports Development of transportation investment data and planning tools Prioritization of projects to improve freight movement For these projects, increases Federal share payable to 95% on the Interstate System and 90% elsewhere USDOT must certify project improves efficiency of freight movement Project must be identified in a State freight plan State freight advisory committees & freight plans encouraged; plan required to qualify for increased Federal share

14

Performance management MAP-21 identifies national goal areas USDOT establishes measures, with input States set targets State & metro plans describe how the organization will use program and project selection to help achieve targets States report to USDOT on progress toward targets (within 4 yr of enactment; biennially thereafter) 15

Performance Management Identifies Seven National Goals Safety Infrastructure Conditions Congestion Reduction System Reliability Freight Movement and Economic Vitality Environmental Sustainability Reduced Project Delivery Delays 16

17

Accelerating project delivery 18 Any State can choose to assume specific CE designations in FHWA NEPA regulations Use of construction manager/general contractor (CMGC) method of contracting Accelerated completion of complex projects (4 yr) when State requests technical assistance Demonstration project for lump sum payments for purchase of ROW Increased Federal share for some innovative techniques

Accelerating the environmental process 19 Environmental review process streamlining FEIS and ROD combined in certain conditions Allows for the use of planning products in the NEPA process Deadlines for issue resolution, with penalties for agencies Programmatic mitigation plans Reduced statute of limitations on claims (150 days, not 180) Expanded authority for categorical exclusions Multi-modal projects Projects to repair roads damaged in declared emergency Projects within existing operational right-of-way Projects receiving limited Federal assistance

20