Takeyasu Ito University of Tennessee/Oak Ridge National Laboratory EDM Cost and Schedule Review February, 2005 Beam Splitter / State Selector, Polarizing.

Slides:



Advertisements
Similar presentations
W. M. Snow Physics Department Indiana University/IUCF EDM collab meeting Monitoring the Cold Neutron Beam (During Experiment) What to measure (fluence.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Overview of the Schedule and Budget for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
RF Cavity / Coupling Coil Module
HYSPEC Instrument: Status and Performance M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed.
Department of Energy Review of the SNS Instruments –Next Generation (SING) Project HYSPEC Instrument: Status and Performance Mark Hagen Instrument Scientist.
Takeyasu Ito University of Tennessee EDM Collaboration meeting December, 2004 Cost and Schedule Estimate WBS 2.5- Neutron beam polarizer/splitter for SNS.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
What happened to our shutter? and a brief description of our upstream beamline for those who were not around when it was built.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
TBM Costing Lessons from Recent ITER Activities Scott Willms Los Alamos National Laboratory Presented at INL August 10, 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
EDM Magnetic Shielding (WBS 5) and Magnets (WBS 6) B. Filippone and B. Plaster Caltech Internal Cost and Schedule Review February 11, 2004.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Managed by UT-Battelle for the Department of Energy Polarized 3 He Filling Stations Xin Tong (Tony) Instrument Development Group Neutron Facilities Development.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Beam Polarimetry Matthew Musgrave NPDGamma Collaboration Meeting Oak Ridge National Laboratory Oct. 15, 2010.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Polarized Neutrons in ANSTO – From LONGPOL to Pelican, Taipan, Sika, Platypus and Quake Dehong Yu and Shane Kennedy Bragg Institute, ANSTO, Australia.
EDMEDM EDM Collaboration Meeting Project Management Fast Start Summary Prepared by: John P. Tapia May 25, 2006.
HYSPEC HYSPEC: A High Performance Polarized Beam Hybrid Spectrometer at the SNS Beamline 14B I.Zaliznyak 1, S. Shapiro 1, L. Passell 1, V. Ghosh 1, W.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee.
Authorization and Inspection of Cyclotron Facilities Design, Layout and Shielding.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
EDM collaboration meeting WBS 9.0: Slow controls, Simulations, DAQ/data analysis Chris Gould- North Carolina State University and Triangle Universities.
1 How Can We Get More Neutrons? Upgrade Paths for the EDM Geoff Greene University of Tennessee /Oak Ridge National Laboratory Oct 2006.
Mu2e Mu2e CD-2 Review Template Eric Prebys Extinction October 21-24, 2014.
September 10, 2004 Experimental Facilities Division SING Project Status HYSPEC IDT Meeting John Haines SING Project Manager September 10, 2004.
Takeyasu Ito University of Tennessee EDM Collaboration meeting August 19-20, 2004 Nature of a Separate Production Cell What dimensions are appropriate.
Neutron Chopper Technologies Work Package
Resources, Timeline & Contingency UCN CDR (Sept/2010)
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
Michael Pivovaroff OCT 2005 UCRL-PRES FEL Offset Mirrors LCLS Week * FAC Meeting 26–27 October 2005.
3 He R&D Plan at Los Alamos Takeyasu Ito Los Alamos National Laboratory EDM Collaboration Meeting May 26, 2006 Oak Ridge, TN.
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
WBS 6: Magnetic Shielding B. Filippone and B. Plaster Caltech December 3, 2004.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
HYSPEC IDT Polarized Beam Mode for the Hybrid Spectrometer (HYSPEC) at the Spallation Neutron Source. Outline Polarization analysis and the HYSPEC place.
R&D Plan on Light Collection Takeyasu Ito Los Alamos National Laboratory.
October, 2001 Hybrid Spectrometer for Single Crystal Studies at the Pulsed SNS: an update. n Principal features of the proposed hybrid spectrometer. n.
NEDM Cost and Schedule Review, February 11, 2005 Upper Cryostat and Valves Cost and Schedule for WBS 3.2, 3.3, 3.4, and 8.2 L. M. Bartoszek D. H. Beck.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Very Crude Background Estimation Takeyasu Ito Los Alamos National Laboratory.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
Page Headline Splitters.
NSR Simulations Bret Crawford (Murad S., Kangfei G., Ron M., Chris C.)
The NPDGamma Experiment at the SNS FnPB
Advanced Research Electron Accelerator Laboratory
Supermirror polarizer and beam simulations
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Takeyasu Ito University of Tennessee/Oak Ridge National Laboratory EDM Cost and Schedule Review February, 2005 Beam Splitter / State Selector, Polarizing Magnet, and Spin Flipper WBS 1.2.1, 1.2.2, 1.2.3: Splitter/State Selector Main Body WBS 1.2.4, 1.2.5, 1.2.6: Polarizing Magnet WBS 1.3.1, 1.3.2, 1.3.3: Spin Flipper

Takeyasu Ito2 SNS FNBP UCN Beamline and EDM Experiment Layout

Takeyasu Ito3 Purpose, Functions and Design Goals Split the beam into two, to feed the two measurement cells Polarize neutrons Flip the polarization of each beam independently Maximize the beam delivered to the measurement cells

Takeyasu Ito4 Principle of Polarizer/Splitter with Polarizing Supermirror Polarizing supermirror: One spin state: reflected up to the critical angle  c psm The other spin state: transmitted at all angles If the input guide has m=1.5, and PSM has m=2.4, then  = 14mrad. Need 10 m for 15cm wide guide In order for one spin state to be 100% reflected,

Takeyasu Ito5 One Possible Layout 12 cm wide, m=3.5 straight guide (buried under shielding) Diverging horn (7 m) 30 cm wide, m=1.5 straight guide ( 2m) Polarizer/Splitter (14 m) m=2.4 polarizing supermirror coated on thin Si wafer Rudimentary (2-dimentional) Monte Carlo study indicated 30% transmission and 90% polarization.

Takeyasu Ito6 Cost Estimate - Overview (WBS 1.2) Design –$63,200 + $27,176 Procurement –$953,940+ $410,194 Installation –$12,640 + $5,435 Total + Contingency= $1,029,780 +$442,805 Note: The diverging horn is not included in the budget although it is not included in the FNPB baseline. If this is proven to be beneficial for other experiments at the FNPB UCN line, we expect some kind of cost sharing between FNPB and EDM.

Takeyasu Ito7 Cost Estimate - Design (WBS 1.2.1) Conceptual design/Monte Carlo simulation –Physicist x 100hrs = $0 Shop drawings –Engineer x 200hrs = $31,600 Preparation of equipment spec –Engineer x 200hrs = $31,600 Total + Contingency = $63,200 + $27,176

Takeyasu Ito8 Cost Estimate - Procurement (WBS1.2.2) Preparation for procurement –Physicist x 30hrs = $0 –Engineer x 30hrs = $4,740 Splitter/State Selector –Engineering Design + Fabrication = $949,200 (=$840,000+13% overhead) Total + Contingency = $953,940+ $410,194

Takeyasu Ito9 Splitter/State Selector System Basis for estimate –Supermirror guides $30k/m for m=3.5 * Note: price of coating goes as m 4 –Si wafer $30 / 4-inch disk * From semiconductor industry, roughness ~ 5Å (source J.J.Ferme from Seso) Cost estimate –$30k/m x 14m x 2 = $840 k * Factor 2 for coating Si wafer and constructing more complicated system than straight guide

Takeyasu Ito10 Example: SNS FNPB UCN Beamline Guides = $25.1K/m Vacuum housing=$3.84K/m Support and Adjustment fixtures=$790/m * Based on quote from Swiss Neutronics on FNPB UCN beamline with the following parameters: –The guide size is 100mm x 120mm –The guide will have m=3.5 all sides –The guide is straight –The guide has a total length of 30m

Takeyasu Ito11 Cost Estimate - Installation (WBS1.2.3) Installation –Technician x 80hrs = $12,640 Oversight –Physicist x 40hrs = $0 Total + contingency = $12,640 + $5,435

Takeyasu Ito12

Takeyasu Ito13 Cost Estimate - Contingency for WBS Technical –Risk factor=10% –Risk weight=2 Cost –Risk factor=15% –Risk weight=1 Schedule –Risk factor=8 Total percentage contingency = 43%

Takeyasu Ito14 Estimate for Duration Design: 88 days + 43% float –Conceptual design: 100 hours –Shop Drawing: 200 hours –Preparation of equipment spec: 200hours Procurement: 1 year + 43% float Installation: 14 days + 43% float

Takeyasu Ito15 Cost and Schedule Estimate for Polarizing Magnet (WBS ) Design –Design work by physicists –$0 –255 days Procure –$158,200+ $68,026 –183 days Install –$12,640 + $5,435 –21 days

Takeyasu Ito16 Cost and Schedule Estimate for Spin Flipper (WBS ) Design –Design work by physicists –$0 –21 days Procure –Flippers: $40,000 –Power supplies, etc: $36,000 –Total: $85,880 + $36,928 –183 days Install –$6,320 + $2,718 –14 days

Takeyasu Ito17 Summary Splitter/State selector (WBS 1.2) $1,200,620 +$516, days Spin Flippers (WBS 1.3) $92,220 + $39, days