Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA www.europeanspallationsource.se April 21, 2015.

Slides:



Advertisements
Similar presentations
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Advertisements

G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
D.Proch, Thin film Workshop, Legnaro, Oct SC RF cavity technology: the possibility of mass scale production, a global review Remarkable production.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
Spoke Cryomodules (WP4) Guillaume OLRY (CNRS/IPN Orsay) WP4 Deputy Leader April 21, 2015.
ESS cavities interfaces
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Accelerator / Elliptical Cavities Cryomodules
The ESS Linear Accelerator
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
Accelerator/WP High-Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April, 2016.
ESS The INFN in-kind contribution to the accelerator of the European Spallation Source.
Christine Darve ESS deputy WP leader Pierre BOSLAND, CEA Saclay External WP5 leader With special Acknowledgment to Nuno Elias (ESS) and Gilles Olivier.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
LASA status for medium-beta cavity Paolo Michelato.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Accelerator/Technical Documentation and Breakdown Structure Dr. Felix Schlander Lead Engineer 20 April
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
Accelerator/Elliptical Cavities Cryomodules Pierre BOSLAND, CEA Saclay External WP5 leader Christine Darve, ESS deputy WP leader
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
WP : HIGH-BETA CAVITY DELIVERY A Wheelhouse ASTeC, STFC Daresbury Laboratory ESS SRF Elliptical Cavities Kick-Off Meeting CEA Saclay 23 rd June 2015.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Accelerator/ Medium Beta Cavities Rocco Paparella on behalf of INFN Milano – LASA ESS Team April 21st, 2016.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Quality Plan Documentation Management & Non Conformities ESS PDR, INFN-LASA, 19 May 2016Laura Monaco, INFN LASA.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
WP High Beta Cavities Delivery
The Evolving ILC Project
Strategy and Status of Reference Cavities for European XFEL
Cryomodule test stand at ESS site
Status and plans for the 3.9 GHz section of XFEL
WP5 Elliptical cavities
ESS cavity procurement via in-kind contributions
High-Beta cavity STATUS at DAREsbury laboratory
WP5.1 Professional training and apprenticeship (CEA, DESY, INFN)
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Complementary ISTC Projects #3888, 3889p
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
WG-1 Session Cavity Performance Cryomodule Performance
EZ Infrastructure for SC cavities production
Highlights from EU Global Design Effort
Retreatment of Superconducting Cavities for the European XFEL
A. Bignami on behalf of LASA SRF Group
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
Pierre Bosland – on behalf of the ESSI team (ESS Irfu)
SNS-PPU upgrades the existing accelerator structure
Facility for Research Instrumentation and Accelerator Development
Paolo Michelato LASA - Status of cavity documentation, fabrication, inspection and NCRs Laura Monaco INFN – LASA 10° ESS SRF Collaboration Meeting, 25.
Presentation transcript:

Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015

Medium Beta Cavities Overview ESS medium beta cavities requirements INFN - LASA past experience on SC cavities INFN - LASA man power INFN prototyping on medium / high beta cavities INFN major procurement: 36 medium beta cavities 2

Schedule Show P6 schedule of the relevant activities for this sub-system 3

Medium Beta Cavities Technical performances 4 INFN Medium Beta Cavities Technical Performances RequirementsMedium beta Frequency (MHz) Geometric beta0.67 Nominal Accelerating Gradient (MV/m)16.7 Epk (MV/m)< 50 Cell coupling k(%)≥ 1.5 RF peak power (kW)1100 Q ext Q0 at nominal gradient>

Medium Beta Cavities Selected technologies 5 INFN – LASA experience on SC cavities – SNS cavities – TRASCO cavities – PDS-XADS cavities – EUROTRANS / MAX Elliptical test cryomodule – TTF/Tesla & FLASH cavities and modules – European XFEL series production of GHz cavities – European XFEL 3.9 GHz system

Medium Beta Cavities Selected technologies /2 6

Medium Beta Cavities Selected technologies /3 7

Medium Beta Cavities Selected technologies /4 8

Medium Beta Cavities Integration and Verification 9 Cavities will be fabricated using INFN design and will be plug compatible with CEA boundary conditions. INFN design is relative to the cavity itself. Cavity interfaces, He tank geometry, flanges, tuner connections, etc will be done on the basis of the French design.

Medium beta Cavities Organization at partner lab The activity relative to the Medium Beta Cavities will be covered, according to our proposal, within the estimated man power of 15 FTE. 10

Budget and cost-book (1 slide) 11

Medium beta cavities Major Procurements /1 Medium beta and high beta cavities prototypes – Procurement contract NOT included in the proposal. Built prototypes of both medium and high beta cavities. – INFN design, using LG Nb, plug compatible with ESS cryomodule. Design process in progress. – Optimization to include LG option. LG Nb ingots procurement started. – Slicing process ordered. Full treatment (BCP, HPR, clean room) done in industry. Final handling and test will be done at LASA in the qualified infrastructure. 12

Medium beta cavities Major Procurements /2 INFN Plug - compatible design just started (but well in progress) 13

Medium beta cavities Major Procurements /3 INFN Plug - compatible design just started (but well in progress) 14 Inner cell parameters

Medium Beta Cavities Major Procurements /4 Medium beta series cavities – Niobium procurement for the fabrication of 36 medium beta cavities. – Cavity fabrication of 36 (*) medium beta cavities in the industry, including treatments, tuning, Helium tank integration, etc, accomplishing the ESS requirements in terms of performances, functional interfaces. – Certification activities, documentation, ancillaries (flanges, vacuum valves, antennas, frames, etc.) – Cold test in a qualified infrastructure. – Transportation in special boxes and delivery at the cryomodule assembling facility. – Man power for the above activities. (*) INFN Design, plug compatible with CEA boundary condition 15

Medium Beta Cavities Major Procurements /5 16 Revised scheduling proposed First 4 series cavities delivered by end 2017

Medium Beta Cavities Top risks Top risks – Availability of qualified companies at the time of the contract placement – Modification of the boundary conditions for cavities during the future development of activities 17

Next Six Months Design of medium beta cavities plug compatible with CEA boundary conditions LG Nb ingot arrival at LASA LG Nb ingot slicing (wire cutting) Medium beta prototype ordering Deep drawing of cells Activities for the technological transfer of the cavity processing (BCP) to the industry Vertical test adaptation for 700 MHz cavities 18

Medium Beta Cavities Summary INFN Milano – LASA activity on medium beta cavities started INFN design plug compatible with CEA boundary conditions First step: LG Medium beta and High beta cavities prototyping and testing Medium beta series production (36 cavities) start by end 2016 First 4 series cavities delivered by end