Item Th11b San Diego Gas and Electric Substation Relocation Project Chula Vista, San Diego County.

Slides:



Advertisements
Similar presentations
RIVERBEND COMPREHENSIVE PLAN AMENDMENT JANUARY 15, 2008 Environmental Consulting & Design, Inc.
Advertisements

Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
Don Edwards San Francisco Bay National Wildlife Refuge Where Wildlife Comes First!
Northeast Corridor Greenway Acquisition City Council Workshop November 12, 2013.
Community Development Department CP AND HG RESIDENTIAL LOTS, LLC AND CITY OF PALM COAST Settlement & Development Agreement.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
RESILIENCE AND INTACTNESS A Manager’s Perspective.
Florida Fish & Wildlife Conservation Commission ZOS Location Map Feet.
(c) 2011 San Diego Gas & Electric Company. All copyright and trademark rights reserved.
Dana Point City Council Appellate Hearing Project: Crown Valley Parkway CDP04-11, CUP0421, SDP0431, Final EIR Final EIR SCH# Co-Appellant:
JOINT VENTURES Celebrating 25 Years of Bird Conservation.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Integrated Natural Resources Management Plan Development on Navy Installations in Southern California Coralie Cobb Natural Resources Specialist Southwest.
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
Natural Resource Value of Edison Farms/Agripartners Through Research and Science Presented by: Jessica Stubbs, Natural Resources Specialist.
Borrowing Creative Financial Concepts from The Private Sector: Tax Districts Dallas, Texas October 10, 2006 Federal Reserve Bank of Dallas and Aspen Institute.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
City of West Linn Bolton Reservoir Replacement Planning Commission Hearing July 1, 2015 Presented by: Thomas P. Boland, P.E. Murray, Smith & Associates,
Northern California Conservation Planning Partners Eleventh Annual Habitat Conservation Planning From Tahoe to the Bay Workshop John Kopchik East Contra.
September 24,  Preliminary Development Plan  Location: North side of NW 39 th Avenue in the 8300 to 9099 block  Zoning Districts: R1-B, HM, PD,
Planning Area Standards May 18, Outline of today’s meeting Introductions Recap of previous community meetings Planning Area Standards Discussion.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Visual Resource Management May 2015 Lander, Wyoming.
1 Context Sensitive Solutions For Designing Urban Thoroughfares Brian Bochner Senior Research Engineer Texas Transportation Institute Brian Bochner Senior.
Transmission Siting Considerations, Best Practices, and Lessons Learned Gary Graham, Ph.D. Transmission Project Director.
North Bay Climate Adaptation Initiative
Riverside County Transportation & Land Management Agency Juan C. Perez Director Riverside County Renewable Energy Grant Update August 3, 2015.
NEWPORT POINTE COUNTY FILES: GP# , RZ# , SD# , AND DP# BOARD OF SUPERVISORS HEARING June 4, 2013.
RANCHO PALOS VERDES WELCOME Vision Plan and Public Use Master Plan Visioning Workshop June 3 rd, 2006.
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
Measures of Successful Wetland Restoration: An Examination of Policies and Ecologies in Northern Michigan Andrew T. Kozich Michigan Technological University.
Living with a Rising Bay: Vulnerability and Adaptation in San Francisco Bay and on its Shoreline San Francisco Bay Conservation and Development Commission.
1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Goleta Against Drilling (GAD-NO): A group of concerned citizens in Goleta working to protect the environment from the adverse effects of the Southern California.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Transportation Projects City Council Workshop May 14, 2013.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
Encore Trust California Coastal Commission Hearing June 12, Encore Trust Residence.
1 Item W9a (Ruffalo) Coastal Commission March 7-9, 2012 Hearing.
A-4-STB VAN VLIET 1717 FERNALD POINT LANE, MONTECITO SANTA BARBARA COUNTY Item Th20b CCC Hearing April 12, 2012.
CDP Application No Integral Communities 500 California Hwy 75, City of Imperial Beach CCC Hearing Item Th24b August 13, 2015.
Strands End, LLC and Leeds, LLC 817 & 819 South Pacific Street City of Oceanside Appeal Numbers: A-6-OCN & A-6-OCN Items W11a&b Coastal Commission.
Hohnloser De novo review of proposed boundary line adjustment at and South Highway One, Gualala, Mendocino County (APN ) Item F12a.
Federal Consistency Certification Sorrento To Miramar Double Track - Phase 1.
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
City of San Diego LCP Amendment No Commercial Land Use Redesignation CCC Hearing Item Th14a February 10, 2011.
Parcel 9U Marina Marsh. Postpone De Novo Hearing Noticing requirements for the de novo hearing were not met as required under CCR §13063 and §13054 –
The Fish and Game Commission has designated the states portion of the South Bay Salt Ponds an Ecological Reserve. Planning for the management of Ecological.
Item Th10b (City & County of San Francisco, DPW) 1 No (San Francisco Dept. Public Works) Coastal Commission Hearing July 2011 Agenda.
LPEA BAYFIELD SUBSTATION LA PLATA COUNTY LOCATION & EXTENT REVIEW March 12, 2015.
Item W16a February 8, 2012 CCC Hearing A-6-OCN (Altman) 1823 South Pacific Street City of Oceanside.
STAFF’S FINDINGS OF INCONSISTENCY Section 30233(a) Wetland Fill Staff’s basis for denial centers on the determination if the project meets the incidental.
California Energy Commission Redondo Beach Energy Project Biological Resources- PSA Andrea Martine
Vista Verde Ranch Revised Draft Environmental Impact Report Vesting Tentative Tract & Oak Tree Permit Project Description :70 unit single.
The Woodlawn Landfill Site A Case Study in the Values and Methods of Ecological Revitalization.
AHWATUKEE-FOOTHILLS ADMS MANDAN STREET DESIGN CHARRETTE Valerie Swick, Project Manager Flood Control District of Maricopa County.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Wetlands Focus Group. Responsibilities and Goals   Growth Managements Act (Chapter 163, FS) of 1985   Included the adoption of the State Comprehensive.
CHULA VISTA BAYFRONT Implementation Update Presentation
CFT Gateway Center ( E. Foothill Blvd
Planning and Development Commission
Chapter 4 Osceola County Land Development Code (LDC)
City Council Meeting April 23, 2018
Michele Norton, Planner City of North Port
WSUP The Club at ArrowCreek Grading
Presentation transcript:

Item Th11b San Diego Gas and Electric Substation Relocation Project Chula Vista, San Diego County

Substation Relocation Project Components 1.Demolition of existing South Bay substation 2. Transmission Corridor Improvements 3. Construction of new Bay Boulevard substation

Key Coastal Act Issues Biological Resources Visual Resource

Biological Resources Impacts to vegetation and wildlife – Natural Community Conservation Plan policies – Biological monitoring – Mitigation for impacts to native vegetation Impacts to wetlands – 2.45 acres of existing wetlands will be filled – 10+ acres of restoration at the D Street fill site

Visual Impacts: South Bay Substation Demolition  Improvement to the visual landscape  Consistent with the Chula Vista Bayfront Master Plan Existing Conditions Proposed

Visual Impacts: New Bay Boulevard Substation Generally visually compatible with the character of the surrounding area Consistent with CVBMP Blocks existing views of the Bay across a currently undeveloped site Existing Conditions Proposed

230 kV Undergrounding Underground 300 OR 1000 feet of the incoming 230 kV line

Concerns with Undergrounding 230 kV line Site-specific technical/operational challenges Importance of maintaining feed line above ground Construction-related impacts could be significant Could result in significant time delays

138 kV Undergrounding Proposed Existing Conditions Proposed with Special Condition 14