Project Nexus Workgroup Extension of Modification 0434 to permit retrospective updates pre-dating Project Nexus Go Live Date 9 th September 2014.

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

Third Energy Package for Change of Supplier 2009/73/EC.
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
1 of : Multi-Currency Payments / DA0813 Last updated: Project Walkthrough: Multi-Currency Payments Multi-Currency Payments.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
Asset Processing Property Control Website URL:
Mike Castillo Director of Central Services Asset Processing.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Nexus Workgroup CSEP Transition Topic June
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Project Nexus Workgroup – Invoicing 11 th August 2014.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
1 Modification 0152V Implementation Matters 25 October 2007.
Supply Point Register 7th December 2011
Supply Point Register 10th January 2012
Project Nexus Workgroup (Settlement)
PN UNC Workgroup Invoicing 4th October 2011.
Project Nexus Workgroup
Project Nexus Workgroup
RAASP – Solution Options Scenario Comparison
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Modification 0117 – Additional Considerations
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Project Nexus Workgroup
PN UNC Workgroup iGT Services
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
PN UNC Workgroup (Settlement topic)
UK Link Replacement Programme additional supporting UNC modifications
Deferral of Retrospective Updates Functionality
Joint Theft Reporting Review (from meeting 1st March 2019)
PN UNC Workgroup iGT Services
Project Nexus Workgroup
MOD 640 INVOICING VALIDATION RULES
Modification 421 – Updates and Benefits Case
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
AQ Threshold Analysis Steve Taylor Centrica plc.
Project Nexus Workgroup
Implementation Approach Distribution Workgroup – June 2014
Weekly Progress Update 13 April 2018
Modification Proposal 136
Meter Reads.
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
Annual Quantity (AQ) 45.
Presentation transcript:

Project Nexus Workgroup Extension of Modification 0434 to permit retrospective updates pre-dating Project Nexus Go Live Date 9 th September 2014

Mod 0434 development At the time the target system was unknown so 0434 drafted to be effective from Nexus Go Live Date only provides for read replacement where the read to be replaced has a date of Project Nexus Go Live Date or later only provides for an asset update where the asset event date is Project Nexus Go Live Date or later However, functionality in the target system provides for read replacement and asset updates where the event pre-dates Project Nexus Go Live Date to be submitted and accepted (validations permitting).

Proposal for Proposal to allow both read replacement and asset updates (only asset have been discussed previously) to use target system functionality and be submitted up to an event date which is the Code Cut Off Date (often referred to as “line in the sand”). Create a rolling read replacement and asset update window in line with Code Cut Off Date Financial adjustments will be processed as per 0434 with the exception of smaller supply points where any adjustment will only apply from Project Nexus Go Live Date (adjustments pre- dating Project Nexus Go Live Date will be managed through Reconciliation by Difference process)

Key Factors Inclusion of read replacements pre Project Nexus Go Live Date Creates a single methodology approach to retrospective adjustments arising from asset updates or read replacements whether the event concerned occurred pre or post Nexus Go Live Date. No financial impact (all financial adjustments are limited to Code Cut Off Date irrespective of Nexus) Target system will support single methodology Removes requirement to maintain pre Nexus adjustment methodology and tools. Application of post Nexus validation

Example Scenario: Erroneous Read Identified 1 st April 2012 (Code Cut Off ) Check Read Nexus Go Live Date Erroneous Read Process as per Shipper calculates consumption adjustment -CMS query submitted -Query validated -Consumption adjustment processed and invoiced Process as per Shipper submits replacement read -Target system validates read and updates Supply Point Register -Adjustment automatically calculated and invoiced Erroneous Read identified