ATLAS Pixel Detector Pixel Support Tube and Related November 9, 2001 Pixel Day E. Anderssen, LBNL.

Slides:



Advertisements
Similar presentations
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Advertisements

ATLAS Pixel Detector BCM Signal Cable October 13, 2005 E. Anderssen, LBNL.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Fixturing operations for PXL 1 models: MSC.SLDASM MSC_fixtured.SLDASM rail_test_system.SLDASM 2/24/2010.
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Design, Prototyping, and Production PST Progress Update September 2002.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
ATLAS Pixel Detector October 2001 Pixel Week N. Hartman LBNL 1 PST Design Update PST CDR october 2001.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
ATLAS Pixel Detector September 2002 A. Das LBNL 1 Pixel Support Tube Rails: Design and Prototyping September, Review.
Pixel Leaf Spring Review, Dec 19, Leaf Spring Review Agenda Leaf spring conditions Mockup testing Planning for the work at P5 Discussion Demonstration.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
ATLAS Pixel Detector BCM Signal Cable October 5, 2005 E. Anderssen, LBNL.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
ATLAS Pixel Detector Pixel Support Tube Interfaces LBNL Internal PST Review E. Anderssen, LBNL.
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
ATLAS Pixel Detector JULY 2001 Pixel Support Tube N. Hartman LBNL 1 Pixel Support Tube Concept and Design N. Hartman, E. Anderssen, G. Gilchriese, S. Dardin.
ATLAS Pixel Detector Service Quarter Panel Update And PP1 Work July 4, 2006 Pixel Integration Meeting M Cepeda, S Dardin, K Kennedy, R Post, M Pereira,
ATLAS Pixel Detector June 2002 PST FDR N. Hartman LBNL 1 Pixel Support Tube: Design and Prototyping PST Final Design Review June 2002.
ATLAS Pixel Detector Project N. Hartman LBNL 1 Alexis Smith Intern Progress Report Neal Hartman, March 25, 2003.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
LHCC referee meeting L.Rossi - INFN / Genova CERN - March Status of insertable pixel  Layout in 2000 (Dubna layout)  Reasons for the change.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
LARP Collaboration Meeting Racetrack Coil Fabrication
ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 1 Insertion Device Costs Overview US Pixel Meeting July 9, 2003.
Engineering Division 1 Phased Cone Proposal Eric Anderssen, LBNL.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
1 IST development status  Seattle  Composite Design.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
ATLAS Pixel Detector Pixel Support tube Supports October 17, 2001 E Anderssen, LBNL.
Status of the PANDA Magnet mechanics (yoke & cryostat)
Guide Right™ Surgical Guide System
MICE Partial Return Yoke Mechanical Design
Beam Pipe and Service Support Structure Production Progress
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Presentation transcript:

ATLAS Pixel Detector Pixel Support Tube and Related November 9, 2001 Pixel Day E. Anderssen, LBNL

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Overview Status of Work, technical and other –PST and Supports –Pixel Supports –Service/Beampipe Supports Immediate plans –Prototyping in ‘02 Discrepancies –All along the way…

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Chain of Support for PST to Cryostat PIXELSUPPORTTUBE SCT TRT ID Vee Rail ID Flat Rail Side CSide A View from top—all Tube Supports are Horizontal and Co-planar Properties TBD Constraint TBD Support Positions are shown, But constraint conditions are Not indicated here. +Z +X +Y Vertical Agreed Support Positions outside PST PST Support Conditions Under Investigation

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Support Conditions of Beampipe Beampipe Cruciform Supports align with Stiffest part of PST—the end flanges All support planes on frame are wires allowing longitudinal (axial) float One Z-Fixture is foreseen to take up ATLAS Access/Opening loads

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Pixel Support Tube Mockup Mockup in three pieces to simulate independent parts of tube –Goal is for full length of entire tube to simulate all installation scenarios –Detector rails are removable, should modification be necessary –Intend to run ‘installation tests’ in ‘02

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Rail Design in Support Tube Vee and Flat rails were chosen to provide pseudo-kinematic support for the detector during delivery to the support points Rails are used only for delivery, not support mockup

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL PST Important Features Bolt flanges Sct mount pads End Plugs (1 mm equiv. carbon sheet) Hoop Hat Stiffeners (section view) End Support End Supports

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Flange Face (machined layup) Flange base (Layup) Stiffeners (layups) Support Flange Bonded Assembly T-nuts (bonded) Old design - now gone for independent thermal barrier

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Slider design - materials testing Friction Tester nearing completion –Applies variable pressure –Measures angular acceleration –Slides sample against interchangeable disk of given material M slider to be tested turntable (carbon disk) position is movable along arm M Mass provides normal force Encoder on shaft measures acceleration arm hinge

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Gravity Sag Calculations Carbon Glass Whole Tube Sags at ends during operation—it is intended to ‘remove’ this sag when Reattaching supports after installation of Forward ID  Note: Sag is with Package in place—much less without

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Reaction Loads On SCT Model Material FX (N) FY (N) FZ (N) MX (Nm) MY (Nm) MZ (Nm) Carbon Glass Vertical Bending – Both Ends Both Ends Bent – 1 Z Constraint Model Material FX (N)FY (N)FZ (N)MX (Nm) MY (Nm) MZ (Nm) Carbon Glass Both Ends Bent – 2 Z Constraints Model Material FX (N)FY (N)FZ (N)MX (Nm) MY (Nm) MZ (Nm) Carbon Glass One End Bent – 1 Z Constraint Model Material FX (N)FY (N)FZ (N)MX (Nm) MY (Nm) MZ (Nm) Carbon Glass Horizontal Bending

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Flexure Block interface to SCT Penetration FxFx FzFz FyFy MyMy MzMz MxMx This interface must take same loads as applied to Flexure—Will know them well after Joint Model is run  Will look at simple feasibility with current (infinite stiffness) loads  Will iterate size if indicated by ROM calculation SCT Thermal Barrier Penetration

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Flange Envelope Pixel Support Tube (Barrel Region)Pixel Support Tube (forward) Dimensions from 1:1 ID Layout May ‘       May change By ~5mm to 806  new structure added 700 SCT BARREL 3 Barrel Mount Flange Interlink SCT Forward Envelope 806 requested Changes 244

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Flange Envelope Pixel Support Tube (Barrel Region)Pixel Support Tube (forward) New Proposed Envelopes—not yet agreed SCT BARREL 3 Barrel Mount Flange Interlink SCT Forward Envelope shim

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Z-Flexure (Side A) Support Tube Mount Pad M55J View Direction Cut Plane Insulator (G10) or Al Access hole Thru Service Rail Gap filled After picture Dowel pins have line fit Metal Insert Bonded in Thermal Barrier squeezed in here

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Pixel Supports

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Pixel Package Assembly Service and Beampipe Support Mockup Pixel Frame shown

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Tension/Compression Transmission through structures not services Clips register to Buttons on Frame and Service/Beampipe support structure Gaps allow ‘Phi’ offsets of up to +/- 1mm while only 0.25mm longitudinally

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Wire Planes supported by Pulleys Wires not modeled, beampipe not shown

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Tubes route cables to Barrel Separate blocks at Forward end

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Services Supported By Framework

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Service quarter panels supported by framework

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Need to adjust length of Tube or Support Plane location of VI

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Outside view of patch Panel

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Section View of patch Panel

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Barrel End of Support Structure

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL PST Prototyping Plans Short Mandrel –1 foot long - 1 for glass, 1 for carbon – aluminum or steel –“Dry-run” in autoclave to determine thermal response –Determine final diameters from test layups Full Size Mandrel (forward length) –Quotes already received Approximately 14,000 to 20,000 USD 8 Weeks delivery –Plans to Fabricate forward prototype in glass All flanges and rail features Use for production forwards if diameters are correct Implications of Glass Forwards/Carbon Barrel on prototyping plans must be more fully assessed Insertion Testing

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL PST Prototypes in ETC ‘02 Includes –Friction Testing –Material Test Panels –“Foot Long” prototypes –End-Plug Prototype estimated as ½ production total Gray area –Calling first Forward Tube a prototype—Production monies all in FY’03, but need to order tooling and start fab in ’02 –Missing prototype flexure mounts (as noted in ) –Prototype ‘End Plate’ buried in Frame estimate, but included Pixel mounts (~$5k ’01, $10k ’02) –Monies for assembly testing of Insertion mockup spread over a few efforts and called ‘testing’ hard to track if appropriate levels have been assigned

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Service Support Prototypes ‘02 Now includes Beam Vacuum Support Structure Prototype in ’02 already includes bond fixture—need to increase cost some to account for additional scope of VI support, but this saves overall by not having entire extra fixture for VI support Intention for ’02 to build 1 quarter panel support and 2 service panels—still valid Need to build Full VI support for both installation testing and to support services –Needs to be ‘real’ for use in case pixels are late –Needs to have ‘real’ rail interface (unless replaceable interface) Need to add cost to this section of WBS, or make new WBS for Beam pipe support

ATLAS Pixel Detector Nov 2001 Pixel Day E. Anderssen LBNL Recent Changes and Estimate of Impact Change of Forwards to Quartz fiber— +$30k –Additional Shell tool $14-20k –Additional Hat stiffeners ~ Man hours M-tech Introduction of Independent SCT Thermal Barrier +$35k –Throw away ~3-4 man months LBL/Junior Eng Design time –Accrue additional 2-3 man months re-design of Flange/Flexures Increase in scope to include Beam Vacuum Supports +$110k –Design time not assessed –Attempt to use/re-use as much fixture costs as possible –Estimate ~$25k Material/200hr Shop/300hr M-tech (REAL) ‘03 –Estimate ~$10k Material/200hr Shop/300hr M-tech (prototype) ’02 –(Est. based on cost of End Plug and fixturing, using same tool as service panel support structure PST End Support (former Beam Vacuum Support) not included in cost estimates yet. PPI/Endplug Thermal barrier increase in Complexity –Current Estimate based on segmented flat panel. Cost will increase if tool is needed to make other than a flat shape.