2nd IMPLEMENTATION GROUP MEETING. Lisbon, 24th January 2008 Conclusions from the 3rd technical RCC.

Slides:



Advertisements
Similar presentations
SETSO Task Force Network Access and Congestion Management for the south-eastern European region SETSO Task Force Network Access and Congestion Management.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
Presentation of the ERGEG Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid, 20th.
Detailed action plan ( ) Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
IFE-CASC.EU project Forum with market parties Paris – 18th June
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Joint IPE auction implementation and results 1 SWE IG meeting – 7 April 2014 Joint IPE auction Update on launch of long term coordinated product (CNMC.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
DEVELOPMENT OF GAS HUBS South Gas Regional Initiative Madrid, 29th October 2007.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
European Commission views on intra-day and balancing markets
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
COMMENTS TO THE SOUTH-WEST EUROPE ELECTRICITY REGIONAL ENERGY MARKET Draft detailed action plan version 1, 22 June 2007.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
Congestion Management Mr Carlo Crea AEEG, Italy The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
SWE Day- Ahead market coupling
Feedback on the SWE coupling Public Consultation
Regulators’ update on Congestion Management and Balancing
26th February 2015 Teleconference
29th April 2014 Teleconference
ERGEG Benchmarking report on long term transmission rights
26th February 2015 Teleconference
Presentation transcript:

2nd IMPLEMENTATION GROUP MEETING. Lisbon, 24th January 2008 Conclusions from the 3rd technical RCC

2 ERI - SW REM 2nd Implementation Group meeting. Lisbon, 24th January 2008 The 3rd technical RCC meeting for the SW electricity REM took place in Madrid on 16 November  The RCC fully supports the effort by Mr. Mario Monti as regards the progress in the FR-SP interconnection, and is ready to help him if required to do so.  Good momentum in the region to achieve new IFE rules that reflect the quick-win improvements of deliverable III.2.a.  The recent unavailability of capacity between Spain and Portugal highlighted the necessity to harmonize capacity calculation as well as the “force majeure” concept within the region.  The RCC demands in the ERI TF for coordination among all the market coupling processes that are taking place in several European countries. Conclusions from the 3rd tech RCC meeting

3 ERI - SW REM 2nd Implementation Group meeting. Lisbon, 24th January 2008 Deliverable III.2.a: “Quick-win” improvements in the long and medium term explicit auction mechanisms.  The RCC welcomes the proposal by TSOs of new text for articles 2.03 and 2.06 of the IFE rules by REE and RTE. However non-continuous products will be accepted if TSOs define in the rules which days and periods exactly the interconnection will not be available or the capacity will be reduced (as it is done in France-Italy rules for example).  Compensation scheme at full market price differential in case of curtailments and cancellation of (day ahead and intraday) auction: While the RCC will encourage all parties to implement market coupling as soon as possible, it considers that the compensation scheme at full market price differential will be beneficial for the development of cross-border trade even within an explicit auction framework and recommends its implementation on the French- Spanish border as soon as possible. Conclusions from the 3rd tech RCC meeting

4 ERI - SW REM 2nd Implementation Group meeting. Lisbon, 24th January 2008 Deliverable III.2.b: “Longer-term” improvements in the long and medium term explicit auction mechanisms.  Market coupling between MIBEL and the current TRILATERAL (and forthcoming Central West region market coupling) is key for the region. The regulators had a first discussion on different barriers to couple both markets.  These issues will be studied in the ad hoc task force created in the light of the 1st SG meeting for dealing with longer-term improvements. Conclusions from the 3rd tech RCC meeting

5 ERI - SW REM 2nd Implementation Group meeting. Lisbon, 24th January 2008 Conclusions of the public consultation of the additional deliverable “analysis of the administrative procedures for the changing of the legislation in force in each country”  The RCC is producing the conclusions paper of the public consultation. Priority II. Transparency  The RCC is producing a “First Paper on main findings from replies to the questionnaire”. An effort should be made to harmonize definitions and agree on a common understanding on the points assessed. Conclusions from the 3rd tech RCC meeting