Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Proposal Writing Joan Wrobel.

Slides:



Advertisements
Similar presentations
Preparing a Competitive Radio Proposal Ed Fomalont NRAO Charlottesville, VA.
Advertisements

Proposing for VLA and VLBA Time Lorant Sjouwerman National Radio Astronomy Observatory, Socorro NM.
The Very Large Array Past and Future Dave Finley.
M87 - WalkerVSOP-2 Symposium, Sagamihara, Japan Dec IMAGING A JET BASE - PROSPECTS WITH M87 R. Craig Walker NRAO Collaborators: Chun Ly (UCLA - was.
EVLA Data Processing PDR Proposal Handling Honglin Ye, NRAO.
WW 2 History Club 7 April Meeting Agenda 1.Club organization discussion 2.Germany’s advance through Europe from Poland to the fall of Crete  Covers.
Radio Telescopes Large metal dish acts as a mirror for radio waves. Radio receiver at prime focus. Surface accuracy not so important, so easy to make.
Chandra Users’ Committee, Oct 2009 Chandra Director’s Office Cycle 11 Peer Review Proposal Numbers:  668 submitted proposals  *5.6 oversubscribed.
NRAO Proposal Tool (PST) Gustaaf van Moorsel NRAO Community Day 1/13/2012.
Chandra Users' Committee, 27 April 2010 Chandra Director’s Office Cycle 12  CfP Release: Dec  GTO Deadline: 11 March 2010  GO Deadline: 18 March.
Transient Science with the Allen Telescope Array Geoff Bower Berkeley.
Users' Committee, 25 Oct 2010 Chandra Director’s Office Cycle 12 Peer Review  June 2010, Hilton, Logan Airport  No major changes in Cycle 12 
Chandra Users’ Committee, 6-7 Apr 2009 Chandra Director’s Office Cycle 11  CfP Release: Dec  POG, final A Eff : 15 Jan 2009  GTO: 43 proposals.
The Future of the Past Harvard University Astronomy 218 Concluding Lecture, May 4, 2000.
1 Synthesis Imaging Workshop Error recognition R. D. Ekers Narrabri, 20 Sep 2006.
Project status and specifications Douglas Bock Project Manager 1.
1 Synthesis Imaging Workshop Error recognition R. D. Ekers Narrabri, 14 May 2003.
ALMA Proposal Preparation and Submission Eelco van Kampen European ALMA Regional Centre (ESO, Garching) Thanks to Liz Humphrys, Andy Biggs and Paola Andreani.
J.M. Wrobel - 25 June 2002 PROPOSALS 1 PROPOSAL WRITING TUTORIAL Outline 30 minutes: Lecture on Generic Issues 60 minutes: Small Groups Write Proposals.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
J.M. Wrobel - 19 June 2002 SENSITIVITY 1 SENSITIVITY Outline What is Sensitivity & Why Should You Care? What Are Measures of Antenna Performance? What.
ALMA Proposal Preparation and Submission Liz Humphreys European ALMA Regional Centre ESO, Garching Thanks to Andy Biggs, Paola Andreani, Eelco van Kampen.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Fusion, Explosions, and the Search for Supernova Remnants Crystal Brogan (NRAO)
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Sensitivity Joan Wrobel.
Molecular Gas and Dust in SMGs in COSMOS Left panel is the COSMOS field with overlays of single-dish mm surveys. Right panel is a 0.3 sq degree map at.
Array Configuration Divya Oberoi MIT Haystack Observatory.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
VLA Archive Image Pilot Pilot to create images from VLA archive data Loránt Sjouwerman National Radio Astronomy Observatory.
Moscow presentation, Sept, 2007 L. Kogan National Radio Astronomy Observatory, Socorro, NM, USA EVLA, ALMA –the most important NRAO projects.
The North American ALMA Science Center North America’s ALMA Regional Center The North American ALMA Science Center acts as the gateway to ALMA for North.
Radio Interferometers’ Data Archives how to find, retrieve, and image radio data: a lay-person’s primer Michael P Rupen (NRAO)
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
E-MERLIN & EVLA P.J.DiamondP.J.Diamond MERLIN/VLBI National Facility Jodrell Bank Observatory University of Manchester MERLIN/VLBI National Facility Jodrell.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Proposal Writing Joan Wrobel.
Twelfth Synthesis Imaging Workshop 2010 June 8-15 Proposal Writing and PST Demo Joan Wrobel, EVLA Scheduling Officer.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Mapping the U.S. Scientific Future in VLBI ftp.aoc.nrao.edu/pub/VLBIfuture VLBI Future Committee: Shep.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Proposal Writing Joan Wrobel.
Single Dish Summer School, Green Bank 2007 Things to do with Single Dish: VLBI Tapasi Ghosh NAIC/Arecibo Observatory Outline: Interferometry Basic.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Short Spacing.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Jan 2016 Solar Lunar Data.
NRAO VLA Archive Survey

SS 433: Distance Determination with Radio Images
Rick Perley National Radio Astronomy Observatory
Observational Astronomy
Observational Astronomy
VLA to EVLA Transition Plan
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Bonnie Holaday Sue Limber
Jan Sun Mon Tue Wed Thu Fri Sat
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Transition Observing and Science
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
The Karl g. jansky Very Large Array
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Proposal Writing Joan Wrobel

2 Outline 30 minutes: Lecture –Generic –VLA and VLBA 60 minutes: Practical –Small groups write proposals NRAO VLANRAO VLBA

3 Generic Start with … –Scientific idea –Target list Specify required … –Angular resolution –Largest angular scale –Observing frequency –Observing bandwidth –Stokes parameters Select trial array Radio Galaxy Fornax A VLA 1.4 GHz 1.0d x 0.7d R. Ekers

4 Generic: Evaluate Trial Array Special needs –Redshifted HI? –Redshifted CO? Geometry –Target above elevation limit? –Snapshot or full u-v coverage? Interferometer sensitivity –Signal-to-noise to self-cal target? Image sensitivity –Enough signal-to-noise on target? –Dynamic-range limited? Supernova Remnant Crab Nebula VLA 5 GHz 7’ x 5’ M. Bietenholz

5 Generic: Evaluate Trial Array Enough field of view? –Primary beam attenuation –Bandwidth smearing –Time-average smearing –Non-coplanar baselines Optimal timeframes? –Time of day –Season –Year ~ sunspot number If trial array … –Fails, pick another –Passes, write and submit observing proposal Sun VLA 5 GHz 43’ x 43’ S. White TRACE X-rays Now

6 Regular VLA and VLBA Proposals Recent news Quarterly news Proposal cover information –VLA Proposal Submission Tool e2e.nrao.edu/userdb –VLBA LaTeX file Scientific justification, technical matters –Add up to 1000 words: be clear, specific, concise –Science: give motivation, state goals (eg) –Technical: give observing strategies, consult archives (eg) Staff collaborator optional – Submission method –VLA Proposal Submission Tool – VLBA PostScript file to

7 Regular VLA and VLBA Proposals Proposal handling steps –Received for deadlines 1 Feb, 1 Jun, 1 Oct For trimesters T2, T3, T1 For VLA configurations in –Classified by scientific categories –Sent to category’s referees –Referees return their grades, comments –Proposal Selection Committee receives the grades, comments –Proposal Selection Committee meets early Apr, Aug, Dec –Results ed to proposers by 1 May, 1 Sep, 1 Jan Details at

8 Regular VLA and VLBA Proposals Suggestions for students –Submit VLA proposal a deadline early, improve, re-submit –Tell us if proposed observations are for your thesis –Tell us your graduation year –Tell us your dissertation plan Plea to graduating students –Donate thesis copies to NRAO – VLBA 22 GHz A. Brunthaler

9 Other Proposal Types and Routes VLA/VLBA rapid response science –Exploratory: quick follow-up of recent discovery (eg) –Target of opportunity: unpredicted phenomenon (eg) – VLA/VLBA large proposals (> 200 hours) – Joint Chandra/VLA/VLBA proposals –cxc.harvard.edu/proposer/ Joint Spitzer/VLA proposals –ssc.sptizer.caltech.edu/propkit/ Star V838 Mon HST Chandra Spitzer

10 Proposal Writing: Practical Small groups write proposals Group selects either VLA or VLBA case Textbook, Observational Status Summaries provided Scientific justification, target list provided Group completes proposal, compares with “real” one VLA tutors –Aaron Cohen –Cornelia Lang –Joan Wrobel VLBA tutor –Amy Mioduszewski NRAO VLANRAO VLBA