Concepts Beyond the Neutrino Factory Baseline Design Alan Bross, Malcolm Ellis, Steve Geer, Olga Mena, Silvia Pascoli.

Slides:



Advertisements
Similar presentations
TASD R&D IDS-NF Mumbai. 2 Alan Bross IDS Plenary Meeting – Mumbai October 12-14, 2009 Detector R&D There are 3 components to this detector and their respective.
Advertisements

The Low-Energy Neutrino Factory Alan Bross, Malcolm Ellis, Steve Geer, Olga Mena, Silvia Pascoli “Olga and Silvia did all the clever stuff ” IPPP/06/85;
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
ISS meeting UCIrvine 21 August 2006 Alain Blondel 1 Evaluation of « optimal » segmentation for neutrino factory far detectors A. magnetized iron sampling.
J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
HARP Anselmo Cervera Villanueva University of Geneva (Switzerland) K2K Neutrino CH Meeting Neuchâtel, June 21-22, 2004.
Precision Neutrino Oscillation Measurements & the Neutrino Factory Scoping Study for a Future Accelerator Neutrino Complex – Discussion Meeting Steve Geer,
A long-baseline experiment with the IHEP neutrino beam Y. Efremenko detector Presented by.
Neutrino Oscillation Physics at a Neutrino Factory Rob Edgecock RAL/CERN-AB.
MICE the Muon Ionization Cooling Experiment Emilio Radicioni, INFN EPS-HEP Aachen 2003.
TASD Update. 2 Alan Bross IDS Plenary Meeting – Mumbai October 12-14, 2009 Fine-Resolution Totally Active Segmented Detector Simulation of a Totally Active.
K.T. McDonald March 18, 2010 LArTPC BNL 1 Magnetizing a Large Liquid Argon Detector Kirk T. McDonald Princeton University (March 18, 2010)
Large Magnetic Volumes for Neutrino Factory Detectors A.Bross ISS Detector Phone Meeting June 22, 2006.
Segmented magnetised detectors Anselmo Cervera Villanueva Universidad de Valencia ISS meeting RAL (UK) 25/04/06 RAL (UK) 25/04/06.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
International Muon Ionization Cooling Experiment Edward McKigney Imperial College RAL March 25, 2002 Physics Motivation and Cooling Introduction.
K.T. McDonald June 18, 2009 DUSEL FNAL 1 Strategies for Liquid Argon Detectors at DUSEL Kirk T. McDonald Princeton University (June 18, 2009)
NEUTRINO FACTORIES Realization & Physics Potential Steve Geer High Intensity Proton Accelerators Fermilab 19 October
The Design of MINER  A Howard Budd University of Rochester August, 2004.
Neutrino Study Group Dec 21, 2001 Brookhaven Neutrino Super-BeamStephen Kahn Page 1 Horn and Solenoid Capture Systems for a BNL Neutrino Superbeam Steve.
1 EMCal design MICE collaboration meeting Fermilab Rikard Sandström.
Simulation of a Magnetised Scintillating Detector for the Neutrino Factory Malcolm Ellis & Alan Bross Fermilab International Scoping Study Meeting KEK,
Advanced Scintillator Detector R&D Towards a 50 kt Ultra-High Segmentation Fe-Scintillator Detector.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Alain Blondel Neutrino Factory scenarios I will endeavour to address some principle design issues related to the physics use of high intensity muon beams.
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
2 Atmospheric Neutrinos Atmospheric neutrino detector at Kolar Gold Field –1965.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
Advanced Extruded Scintillator R&D Alan Bross. 2 Alan Bross ANL-UChicago-FNAL CM4 June 26, 2008 Context  The extruded scintillator R&D Program started.
Activities relevant to Neutrinos in the UK Alfons Weber Oxford/RAL Durham, 11-Mar-2011.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
Big Magnet Design II: a) solenoid and cable concept b) short section test V.V. Kashikhin and A.V. Zlobin.
NuMI Off-Axis Experiment Alfons Weber University of Oxford & Rutherford Appleton Laboratory EPS2003, Aachen July 19, 2003.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting Rutherford Appleton Lab Tuesday 25 th April 2006 M. Ellis.
NuFact02, July 2002, London Takaaki Kajita, ICRR, U.Tokyo For the K2K collab. and JHF-Kamioka WG.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Detector possibilities: scintillator based detectors EUCARD 1 st Annual Meeting, RAL, 13 April 2010 Paul Soler.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
Harvard Neutrino Group DoE Review August 21, 2006.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
MiniBooNE MiniBooNE Motivation LSND Signal Interpreting the LSND Signal MiniBooNE Overview Experimental Setup Neutrino Events in the Detector The Oscillation.
2 July 2002 S. Kahn BNL Homestake Long Baseline1 A Super-Neutrino Beam from BNL to Homestake Steve Kahn For the BNL-Homestake Collaboration Presented at.
Susan Burke DØ/University of Arizona DPF 2006 Measurement of the top pair production cross section at DØ using dilepton and lepton + track events Susan.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
10/20/2015 TASD and MIND prototype and tests at CERN SPSC Oct Tests of TASD and MIND prototypes at CERN.
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
ICHEP Conference Amsterdam 31st International Conference on High Energy Physics 24  31 July 2002 Gail G. Hanson University of California, Riverside For.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
MIND Systematic Errors EuroNu Meeting, RAL 18 January 2010 Paul Soler.
Proposal Preparation. Documents for June PAC  Full Proposal  Starting point is LOI + updates in EOI  Project Definition Report  Cost estimate  Excel-based.
Detector: Status and Plans 6 th IDS-NF Meeting, RAL, 22 September 2010 Paul Soler.
Neutrinos from Stored Muons STORM physics with a μ storage ring.
TASD Update In Context of The Low-Energy Neutrino Factory Alan Bross, Malcolm Ellis *, Steve Geer, Enrique Fernandez- Martinez, Olga Mena, Silvia Pascoli.
Concepts Beyond the Neutrino Factory Baseline Design Detector R&D Alan Bross, Malcolm Ellis, Steve Geer, Olga Mena, Silvia Pascoli.
Open and Hidden Beauty Production in 920 GeV p-N interactions Presented by Mauro Villa for the Hera-B collaboration 2002/3 data taking:
Alan Bross 6th Plenary Meeting of the IDS-NF
NOnA NuMI Off-axis ne Appearance
The Accelerator Complex from the International Design Study
Physics and Performance Evaluation Group: Status and plans
Alain Blondel 11 October 2010 GDR NEU2012 summary
Neutrino Oscillation Physics with a Neutrino Factory
Dual readout calorimeter for CepC
Presentation transcript:

Concepts Beyond the Neutrino Factory Baseline Design Alan Bross, Malcolm Ellis, Steve Geer, Olga Mena, Silvia Pascoli

2 Alan Bross NFMCC Meeting March 2008 Neutrino Factory – IDS Starting Point  Proton Driver u 4 MW, 2 ns bunch  Target, Capture & Phase Rotation u Hg Jet u 200 MHz train  Cooling  30 pmm (  ) u 150 pmm ( L )  Acceleration  103 MeV  25 GeV  Storage/Decay ring

3 Alan Bross NFMCC Meeting March 2008 Muon Complex Evolution

4 Alan Bross NFMCC Meeting March 2008 Extension of Analysis with estimated TADS  E  If the TASD can fully exploit the rich oscillation pattern at low energy  0.5 to 1.5 GeV (and go to E threshold of 0.5 GeV)

5 Alan Bross NFMCC Meeting March 2008 IDS - Lite

6 Alan Bross NFMCC Meeting March 2008  Up to now, the NFMCC has focused on neutrino factories with energies of GeV  The collaboration has not studied lower energy neutrino factories because, until recently, the proposed NF detectors have had muon energy thresholds (for measuring wrong-sign muons with adequate background rejection) of a few GeV, which imposes a minimum threshold on the desirable neutrino energy, and hence a minimum NF energy  ~25 GeV (current IDS baseline).  During the ISS there was progress on understanding how to reduce the detector thresholds for measuring wrong-sign muons … so we can now consider lower energy neutrino factories. But, Can the Physics Goals be Accomplished with a LE-NF?

7 Alan Bross NFMCC Meeting March 2008 Fine-Resolution Totally Active Segmented Detector Simulation of a Totally Active Scintillating Detector (TASD) using No a and Miner a concepts with Geant4 3 cm 1.5 cm 15 m u 3333 Modules (X and Y plane) u Each plane contains 1000 slabs u Total: 6.7M channels  Momenta between 100 MeV/c to 15 GeV/c  Magnetic field considered: 0.5 T  Reconstructed position resolution ~ 4.5 mm 15 m 150 m B = 0.5T

8 Alan Bross NFMCC Meeting March 2008 TASD Performance  Event Reconstruction Efficiency Muon charge mis-ID rate Excellent  E

9 Alan Bross NFMCC Meeting March 2008 TASD Performance II  Momentum resolution excellent u Neutrino Event energy reconstruction from tracking u EM component from hit counting possibly  Simplifies electronics u No calibration needed u Hit efficiency is only consideration

10 Alan Bross NFMCC Meeting March GeV NF Physics Study  Baseline: 1480km (FNAL-Henderson) u Also did Homestake to Fermilab  Choose NF Energy ~ 4 GeV (Actually 4.12 GeV). This is motivated by the realization that for baselines O(1000km), if  13 is not very small, the oscillation pattern is extremely rich below ~4 GeV.  Will divide the simulated data into 3 energy bins, and fit the wrong-sign muon rates for each bin with positive- & negative- muons stored in the ring (6 rates to fit). Can also fit 6 right-sign muon rates.  Energy bins: E = [0.8,1.5], [1.5,3.5], [3.5,4.12] GeV.  Bins chosen to optimize ability to resolve degenerate solutions. IPPP/06/85; DCPT/06/170; Roma-TH-1443; FERMILAB-PUB E (Geer, Mena, Pascoli)

11 Alan Bross NFMCC Meeting March 2008  NF performance: BASIC: (5 years)  (3  useful decays/yr)  (2 signs)  (20Kt fid. Mass) = 3  Kt-decays  (2 signs) BETTER: (10 years)  (5  useful decays/yr)  (2 signs)  (20Kt fid. Mass) = 1  Kt-decays  (2 signs)  Detector efficiency  =0 for E n 0.8 GeV  Do not explicitly implement energy resolutions or cross-section uncertainties but include a 2% systematic uncertainty in the covariance matrix. Input Parameters

12 Alan Bross NFMCC Meeting March 2008  L=1480 Km  Simulate  13 =3 o,  =0 then fit e   & e   rates  Fits for 3 neutrino energy bins:  13 (degrees)  (degrees) Dark: 0.8 – 1.5 GeV Cyan: 1.5 – 3.5 GeV Magenta: >3.5 GeV  Each fit yields one correct & one additional (“intrinsic degeneracy”) solution … but the additional solutions for the 3 bins do not overlap  Unique Solution ! Illustration of how it works: 90%, 95%, 99% CL Contours Solutions corresponding to correct sign  m 2 Resolving Degeneracies

13 Alan Bross NFMCC Meeting March 2008  Simulate 8 cases:  13 = (3 o & 8 o ) &  = (0,  /2, -  /2,  with sin 2  23 = 0.40,  m 2 13 =2.5  eV 2, and L=1480 Km  13 = 3 o  13 = 8 o  13 (degrees)  (degrees) Fit e   & e   rates (90%, 95%, 99% CL Contours)  13 = 3 o  13 = 8 o  13 (degrees)  (degrees) RESULTS: e   (3  Kt-decays)

14 Alan Bross NFMCC Meeting March 2008 L=1480 Km Region for which hierarchy determined at 95% CL 1  Kt-decays 3  Kt-decays Mass hierarchy can be determined for all , if  13 > 3 o (sin 2 2  13 > 0.01) Mass Hierarchy

Detector R&D Issues

16 Alan Bross NFMCC Meeting March 2008 Detector R&D There are 3 components to this detector and their respective R&D  Magnet  Scintillator Production  Photo-detector and electronics

17 Alan Bross NFMCC Meeting March 2008 Magnet  New Idea u VLHC SC Transmission Line s Technically proven s Might actually be affordable 1 m iron wall thickness. ~2.4 T peak field in the iron. Good field uniformity

18 Alan Bross NFMCC Meeting March 2008 Superconducting Transmission Line makes this concept possible (affordable)  SCTL not a “concept” – prototyped, tested and costed for the VLHC Project at Fermilab

19 Alan Bross NFMCC Meeting March 2008 SCTL Parameters $1000/m  $50M 100 kA op demonstrated

20 Alan Bross NFMCC Meeting March 2008 |B| in XZ cross-section

21 Alan Bross NFMCC Meeting March 2008

22 Alan Bross NFMCC Meeting March 2008 R&D - VLHC and cable design  Pipetron type cable u Needs modification to provide long length (~5-7 km) and flexibility (bending diameter 15 m)  Solenoid Strong- Back  Assembly procedure 73km

23 Alan Bross NFMCC Meeting March 2008 New support structure and cable - Concept Structure:  Cable vacuum shell is now part of the solenoid support structure LN shield is fabricated and installed independently:  Two half-shells with LN pipes  Super-insulation,  Supports Cable installed inside the LN shield:  Thick LHe pipe with SC and Cu wires wound outside  Thick Al or Cu tape (mechanical support and additional stabilizer) wrapped over SC/Cu wires  Super-insulation  Flexible (+/-2 mm dynamic range) supports

24 Alan Bross NFMCC Meeting March 2008 SCTL Approach to Large Solenoid – Conclusions  The SCTL concept has been prototyped, tested and costed for the VLHC project  Application for 15m diameter solenoids is different, however u Cost appears to be manageable (<$ M)  R&D u Optimization of the SCTF for solenoid application u Engineering of fabrication process u Engineering of support structure  R&D Program u Will discuss in session on TASD prototyping

25 Alan Bross NFMCC Meeting March 2008 Scintillator  There are really no technical show-stoppers here. It is just a matter of cost reduction  Relatively small R&D Program ($250k) u Extrusion Die design to increase production through-put and efficiency u Extrusion Die Design to allow for co-extrusion of WLS fiber with scintillator profile s Has already been done successfully in tests on post-cladding Kuraray fiber with various polymers. –These were thin (  m), however

26 Alan Bross NFMCC Meeting March 2008 Photo-Detector and Electronics  Here the R&D is already occurring all over the globe  Silicon-PM, aka MPPD, aka MRSD u Hamamatsu, RMD u Potential to lower the channel cost to <$10/ch (Target $5)

27 Alan Bross NFMCC Meeting March 2008  A Low-Energy Neutrino Factory (coupled with the right detector) gives excellent capability in exploring the full neutrino mixing matrix and measure leptonic CP violation  A finely segmented TASD is quite possible the right analysis tool for a Low-Energy NF u Much more simulation/study needs to be done, but the initial results are promising u Detector R&D program is well-defined s Magnet - $2-5M s Scintillator - $250k s Photo-detector – wait and see  A Low-Energy Neutrino Factory (4 GeV) is certainly cheaper than a 20 GeV facility.  Plus with proper planning a Low-Energy Neutrino Factory might be upgradeable to higher energy Outlook Detector Cost Magnet - $150M Scintillator & Fiber - $150M PD & readout - $100M