WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects PERES ELEMENTARY DENTAL CLINIC PROJECT.

Slides:



Advertisements
Similar presentations
Old Kelleys IGA 200 Irwin Ave. Produced By: Lt. Ryan Christen Ocean City-Wright Fire Control District This presentation is a simple guide to area agencies.
Advertisements

Bronze Award: Library/Media Center
Welcome Neighbors! Public Meeting for Proposed Rezoning The area bordered by the Alley above 3 rd Street to the Alley below 3 rd Street, between North.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Joiner Partnership, Inc. Two Kingwood Place Suite 265 Kingwood, Texas (281) Fax (281)
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
PA Architects. PA Architects Presents SUNSET Elementary School Welcome to SUNSET Elementary School RENOVATIONS & CLASSROOM ADDITION SCHEMATIC DESIGN.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
FP- Level 0FP- Level 1FP- Level 3FP- Level 4FP- Level 5FP- Level 6FP- Level 7 INTERIOR Dining 2 Dining 1 Admitting FLOORPLANS EXTERIOR Site Plan Overall.
Downer Elementary School Restroom Renovation West Contra Costa Union School District June 12, 2012 Partnering with clients to achieve excellence in design.
Richmond, CA West Contra Costa Unified School District based in Richmond, California A STEM-focused district, engaging all students to succeed in mathematics,
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Free house located at 130 W. Sheboygan Street, Campbellsport, WI.
West Contra Costa Unified School District
Montoursville Area High School – Additions and Renovations Act 34 Public Hearing February 24, 2015.
FRED POWELL POWELL & PARTNERS, ARCHITECTS West Contra Costa Unified School District.
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects DOVER ES PHASE II SITE IMPROVEMENTS FEBRUARY 27, 2014 DOVER ELEMENTARY.
College of Dental Sciences Dental school building.
Before and After Photos. Dining Room Before Dining Room After Dining Room in Progress.
Air Flow, Humidity and Dust WHS HEALTHCARE QUALITY SERVICE RANDY BENSON, EXECUTIVE DIRECTOR.
THYSSENKRUPP ELEVATOR
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
El Cerrito High School El Cerrito, CA New Construction Project of Distinction WLC Architects, Inc Exhibition of School Planning and Architecture.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Benignus Elementary Klein Independent School District Spencer Partnership Architects Exterior Material Review April 1, 2005.
West Contra Costa USD Facilities Sub Committee June 12, 2012 Peres Elementary School School Facility Program Funding Update.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
RIVERSIDE ELEMENTARY SCHOOL CalTrans Overpass MARCH 12, SALLY SWANSON ARCHITECTS, INC. West Contra Costa Unified School District.
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects CALIFORNIA CHILDRENS SERVICES (CCS) OVERVIEW AND RELOCATION (3/13/12)
Prepared by Stuart Boekeloo. Aleydis Centers LLC has the mission of increasing access to care while decreasing costs for certain segments of the population.
Elevations McMillan Villas May 30th 2015.
POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING October 14, 2014.
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects DOVER ELEMENTARY Existing MPB (2/14/12)
Welcome to the 10 th Annual Presented by: West County College Access Network Getting Ready for College Conference.
1 West Contra Costa Unified School District July 23, Day Budget Revision.
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects.
Regulations for title slide: 1)title this power point slide with your assigned registration number, example: ppt 2)the intent of this title slide.
Enhancing Literacy Skills Throughout the Community Silvia Cisneros Senior Librarian Santa Ana Public Library.
By: Courtney Kovach, PA-C, MBA Clinical Director.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
AHS+Associates Final Project Name Here Final Project Architect – Your Name Put your favorite drawing, sketch, photo, etc. of your project here.
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Dining.
Out Patient Entrance Before Construction. Out Patient Entrance After Construction.
DISINFECTION METHODS, FOR ENVIRONMENTAL SURFACES, IN A DENTAL OFFICE.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
West Contra Costa Unified School District Facilities Subcommittee Meeting April 9, 2013 School Facility Program State Funding Update.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
Coffee Chat: LA COSTA MEADOWS Elementary school Construction update
Allen Bond Proposal Components and Descriptions September 12, 2017
Welcome to the St. George Manor Renovations…..
FRESNO COUNTY WEST ANNEX JAIL
Penn Medicine Chester County Hospital
West Contra Costa Unified School District, Lake Elementary School //
Inspire Elementary School
Capital Improvements Presentation
New Gorbals Health and Care Centre
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
Troy School District Bond Program – Series 1 Construction Update
DOVER ELEMENTARY Existing MPB (2/14/12).
regulations for title slide:
A View of the District
Pinole Middle School Soccer Field
DISTRICT vs. SITE ALLOCATION
Around the room Orders of operations.
Clinical procedure for PCC preparation Note: Shown are clinical situation after caries removal (panel a); plastic model of the simulated intraoral preparation.
WE Are One10! Giving 110 Percent Everyday! Waconia Public Schools
Presentation transcript:

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects PERES ELEMENTARY DENTAL CLINIC PROJECT

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects DENTAL CLINIC SITE PLAN DENTAL CLINIC LOCATED WITHIN BUILDING B AT CORNER OF PENNSYLVANIA AVE. & 5 TH STREET WORK INCLUDES: INCREASING THE USEABLE FLOOR AREA BY REMOVING UNUSED STORAGE AND CASEWORK MODERNIZE EQUIPMENT AND DENTAL WORK AREA PROVIDE STERILIZATION AREA ENHANCE PATIENT WAITING AREA DENTAL CLINIC

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects EXISTING PLAN

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects EXISTING PHOTOS EXISTING DENTAL STATION STORAGE CLOSET AND ENTRY FLOOR ACCESS PANEL EXISTING EQUIPMENT IN STORAGE ROOM

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects FLOOR PLAN