PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.

Slides:



Advertisements
Similar presentations
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Advertisements

28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 16 September 2003 Optical link in Calorimeter DAQ: Link FEE(CROC)
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
Preshower Front-End Boards News LHCb group / LPC Clermont  News  TRIG-PGA Bit Flip Behaviour  Bit Flip Simulations  Conclusion.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Status of NA62 straw electronics Webs Covers Services Readout.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Slide 1 / 14 PSFEB Status Report LHCb Clermont Production Test preview of the PreShower Front-End Boards February the 1 rst, 2007.
STGC Front end boards sTGC Front end boards NSW Electronics workshop November 2013 L. Levinson Weizmann Institute NSW Electronics workshop, November 20131L.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
1 Preshower Front-End Electronics Status LHCb group, LPC Clermont OUTLINE PRODUCTION TESTS PRESERIE I PGA ISSUES: ~SOLVED PRESERIE II (…) CALORIMETER MEETING.
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
CALO News Pascal Perret LPC Clermont 22 January 2012.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
19 Apr 2007DAQ Readiness1 Paul Dauncey. 19 Apr 2007DAQ Readiness2 DAQ hardware layout ? More CRCs New HCAL stage May not be used.
Barcelona Group Clermont Ferrand 11/12/2003 FunctionsFunctions Boards location and distributionBoards location and distribution CB block diagram CB block.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
2009: restart the system: few observations. Hw maintenance week:
Mini-drawers, FE-ASIC , Integrator
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
Presentation transcript:

PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont

2 PS/SPD FEB Status, Installation & Inventory  Production & Tests Finished: 112 PS/SPD FEB produced (including 2 prototypes) 100 boards installed in Pit 8 & Functional 10 spare LPC & Functional  2A patch 2 problematic boards LPC ( PCB or connector issues )  Installation Finished: PRS0 to PRS6, FE boards are individually Functional PRS7: No 380 V PSU / ‘burnt’ by inverted pair in power cable connector / connector now repaired C Side: CROC V4 with ‘last’ firmware in all PRS crates A Side: No CROCs

3 VFE Powering & Cooling  Water cooling is in the pipes since beginning December  No leakage reported since then  All VFE on C side powered simultaneously / ‘All’ Functional  Temperature is Monitored:  varies from 16 ºC (All OFF) to less than 25 º C (All ON) Allowed automatisation of test process Move to calibration tasks

4 So We Moved Upstairs …

5 VFE & FE RJ45 Pendant Issue ‘Automated’ Test on PSDAQHVC01W of RJ45 VFE to FE connection: measure pedestal noise ‘we keep an eye on this’ RJ45 connection FE / VFE is sensitive: Cable seems well plugged mechanically but impedance miss-match on one of the 4 pairs  Loss of signal amplitude: up factor ~10  Reflections: seen with LED flashes for ~0.2 % of channels During cabling: False both FE/VFE side: ~2% cables Post cabling: False connection rate ~0.2% / month only on FE side But, constant human activity on the ECAL platform …

6 VFE Sagita Pendant Issue  Sagita on back of VFE boards  lost of connection for CLOCK signal / Due to: - Stresses through VFE RJ45 cables / in detector movements ?  Statistics: - C side: 7 / 50 VFE lost from may to July 2 / 50 VFE lost from July to September 2 / 50 VFE lost from September to November No loss during December / 1 VFE (SM2T-01 still KO) - A side: 2 / 50 VFE lost from may to September No loss from September to December VFE electronics VFE connectors RJ45 CLOCK Signal power Schematics of VFE ( 2 boards + connectors): sagitta caused by ?

7 DAQ: FEB / CROC Synchronisation From FEB signal to CROC: 2 phaser values to tune for synchronisation Valid phases diagram for PRS3 (Over all PRS FEB slots) KO OK Issue in PRS3 for FEB /CROC synchronisation Related to DAQ of slots ~4-7 & 8-11  CROC FE-PGA 2&3 PRS0-2 OK (but data left on PSDAQHVC01W …)

8 DAQ: FE / VFE Synchronisation 1) Sample VFE integration 2) Re-sample in FEB FE-PGA plateau From VFE signal to FEB FE-PGA: 3 phaser values to tune for synchronisation Validity diagrams against ADC phase based on FE & VFE pedestal signals For all FEB/VFE C side  ADC multiple of 8 are pathologic

9 Trigger: PRS Neighbours TOP/BOTTOM PRS Trigger bits TOP/BOTTOM neighbours: Transmitted via RJ45 Errors data reception for some slots/boards  Systematic FEB slot #2: No data received !!? ( ) FEBs I/Os validated in Clermont Backplane issues ? Not seen in Clermont Try to re-plug FEBs in faulty slots Tests Trigger ECAL/PRS, PRS/TVB & PRS LEFT/RIGHT (backplane) ongoing some re-cabling on PRS/TVB

10 Outlook Commissioning / Calibration work ongoing …  DAQ: Phase validity diagrams w/ new CROC Firmware  Issue in PRS3 FEB/CROC phases  Trigger: Link tests ongoing  Issue with some PRS TOP/BOTTOM slots: no data received  Pendant:  VFE CLOCK loss / RJ45 stress  Monitor FE RJ45 connections (~automated)