Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS 26.01.2009.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
30 GHz waveguide line modification towards 12 GHz.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Agenda : CLIC Civil Engineering and Services (CES) WG.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
5 th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
TBTS Test Program & Schedule G. Riddone
October 14, 2008 C. Hauviller 1 Review of the mock-up’s C. Hauviller.
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
I. Syratchev, HGW 2012, KEK, Japan The high power demonstration of the PETS ON/OFF operation with beam. I. Syratchev for CLIC team.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
ELENA installation progress F. Butin / ELENA collaboration.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CLIC Parameter Working Group Two Beam Module Design
CALIFES A proposed electron beam test facility at CERN
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
CLIC module working group
Complementary ISTC Projects #3888, 3889p
CLEX* Status and Plans CTF3 complex CLEX
TBL, Status, Plans, Experiments
CTF3 Collaboration Technical Meeting January 2008
Summary of WG4 Normal Conducting RF
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
CITE tests for and HMA-T Phase 2 Progress Meeting
Advanced Research Electron Accelerator Laboratory
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Explanation of the Basic Principles and Goals
GN2 JRA5 Roaming and Authorisation Jürgen Rauschenbach, DFN-Verein
CLIC Feasibility Demonstration at CTF3
Two-beam Test-stand Design and Construction Status
Teleconference ACS – FREIA 19th June 2017
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS

Worldwide CLIC & CTF3 Collaboration

CTF3 Collaboration Goals  Build a small-scale version of the CLIC RF power source, to demonstrate: –full beam loading accelerator operation –electron beam pulse compression and frequency multiplication using RF deflectors  Provide the RF power to test CLIC accelerating structures and components  CTF3 is being built at CERN by a collaboration modeled on the large physics experiments

CLEX – Two Beam Test Stand (TBTS)  High-power test of PETS – first tests of CLIC (lengthened) prototypes  12 GHz high-power test of accelerating structures  Two beam acceleration of ‘main’ beam from CALIFES  Measurement of breakdown kick, breakdown current meas. planned  High-power test of PETS on/off mechanism  Operation of CLIC module

COLLABORATION WITH CLIC Pakistan started its formal collaboration with CERN in In 2006, Pakistan signed a Protocol with CERN to encourage extending the existing scientific, technical and educational co- operation.

COLLABORATION WITH CLIC PAK – CERN Protocol 2006: Present on going Collaboration with CLIC is a result of PAK-CERN Protocol As per Annex. VII-b of this Protocol it was proposed that Pakistan, as a new partner in the CTF3 collaboration, focuses on items related to the test beam line (TBL) in CLEX.

Beginning of Collaboration: Contribution to the CLIC study and to the CTF3 Project started with the visit of Walter Wuensch at HMC-3, Taxila – Pakistan in October, 2006 and Subsequent collaboration with Germana Riddone resulted in finalization of a team for Participation in Design, assembly and installation of High frequency CLIC proto-type structure for a period of 02 years. COLLABORATION WITH CLIC

Contribution by Design Teams: Therefore contribution to the CLIC study and to the CTF3 Project started in June, 2007 which is still in progress. In this context, up till now a total of 32 man- months have been contributed by HMC-3 Design teams and following Design Engineers / Designers have worked for CLIC/ CTF3 Project. COLLABORATION WITH CLIC

List of Design Teams: Team-1 Khurshid Alam Muhammad Zakir Zulfiqar Ali June, 2007 to May, 2008 Jan., 2008 to April, 2008 April, 2008 to July, 2008 Team-2 Nasir Abbas Tasneem Yaqoob Muhammad Sameer June, 2008 to Jan, 2009 July, 2008 to Sept., 2008 Sept., 2008 to Dec., 2008

COLLABORATION WITH CLIC List of Assembly Team: Team-1 Nasir Abbas Imran Baig Muhammad Boota Nisar Gul Feb., 2009 to May, 2009 March, 2009 to May., 2009 May., 2009 to Aug., 2009 Aug., 2009 to Oct., 2009 As per present plans, the above Assembly team from HMC-3 will be contributing a total of 13 man-months towards CLIC/ CTF3 project.

Probe Beam Drive Beam ACS Tank PETS Tank PETS & ACS Vacuum Vessels in TBTS Area

COLLABORATION WITH CLIC Contribution towards Design of TBL Parts: HMC-3 Design Team has been involved in the Mechanical Design of various components of TBTS. This includes following:  Vacuum Vessels for PETS & ACS.  Support & Alignment Systems for PETS & ACS.  Layout modeling of different RF components in TBTS.  Supports for these RF components.

COLLABORATION WITH CLIC Contribution towards Manufacturing of TBL-PETS parts: Presence of HMC-3 Design teams provided a good opportunity towards contribution in building of Mechanical components in Pakistan. Up till now following components have been fabricated at HMC-3, Taxila.

COLLABORATION WITH CLIC 1)C.O # CE043 – Supply of 02Nos. of Vacuum Vessels along with Support system for PETS: Fabrication of both the vacuum vessels and support system for PETS was completed, delivered and installed on TBTS.

COLLABORATION WITH CLIC PETS with Internal support system

PETS Vacuum Vessel Ready for Installation in TBTS. COLLABORATION WITH CLIC

Vacuum Vessels for PETS, installed on TBTS.

2)C.O # CE046 – Supply of 02Nos. of Vacuum Vessels for Accelerating Structures (ACS): Fabrication of both the vacuum vessels is in Progress. COLLABORATION WITH CLIC

3)C.O # CE047 – Supply of 02Nos. of Internal support structure for ACS Tanks: Quotation has been submitted and its fabrication activities will start after acceptance. COLLABORATION WITH CLIC

4)Supply of External support structure for ACS Tanks:

FUTURE COLLABORATION WITH CLIC

THANKS