Emergency Interruptible Load Task Force Report to TAC November 3, 2006.

Slides:



Advertisements
Similar presentations
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
Advertisements

February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Presented By: Mark Patterson ERCOT Manager, Demand Integration November 29, Minute ERS Pilot update to TAC 1.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
March 19, 2008 WMS WMS Procedures Review Nieves López ERCOT Market Rules.
ERCOT Emergency Interruptible Load Program Paul Wattles Steve Krein WMS Oct. 13, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 17, 2006.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
RATF Report to WMS Report of RATF meeting held March 3, 2014.
Market Credit Working Group update to the Wholesale Market Subcommittee 04/06/
Generation Adequacy Task Force Update to WMS November 18, 2009.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
EILS Cost Comparison WMS Jan. 28, Background ERCOT procures Emergency Interruptible Load Service three times annually by Contract Period –February-May.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
ERS Update – DSWG Presentation September 21, 2012.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
TCR to CRR Transition Plan Refresher on Part 1 Part 2 – discussion Beth Garza WMS May 21, 2008.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 TAC Report to the ERCOT Board November 14, 2006.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
Emergency Interruptible Load Service Paul Wattles ROS Subgroup Feb. 7, 2006.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus 1SCED Load Participation Complete analysis.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
Load Participation in Nodal Training Session Update DSWG December 7, 2007.
Sept. 2, 2010 Technical Advisory Committee RTWG Report Mark Bruce.
Commercial Operations Sub-Committee Update to TAC January 8, 2009 Lee Starr, BTU.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
Kenan Ögelman & Randa Stephenson TAC Leadership Retreat TAC Meeting September 5, 2013.
1 WMS Report To TAC October In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Three Staff.
Jan 22, TAC Report to the ERCOT Board January 22, 2003.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Review of MGs involvement in SRA process MG meeting 24 th January 2007 Brussels.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Draft NPRR Weather Sensitive ERS Loads December 2012.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Interpreting DREAM NPRR 777.
Presentation transcript:

Emergency Interruptible Load Task Force Report to TAC November 3, 2006

Recent Background May 2005At TAC request, WMS asks Demand Side WG to work on the issue of an emergency load program to address 1-in-10-year LOLE 2005ERCOT staff & DSWG subgroup research emergency demand response programs in other ISOs Oct. 2005DSWG presentation to WMS; WMS defers decision in light of PUC rulemaking Oct. 2005PUC resource adequacy draft rule includes Emergency Load Response (ELR) section; numerous parties submit comments July 2006ELR section dropped from proposed rule; deferred to Demand Response project (32852) Sept. 2006ERCOT proposes EILR program at PUC Demand Response Workshop Oct. 2006WMS formed EIL TF to draft PRR(s) / NPRR(s) for WMS review at December 13 WMS meeting

WMS Charge The Emergency Interruptible Load Task Force (EIL TF) is to draft one or more PRRs/NPRRs by the December 2006 meeting of WMS that provides ERCOT with a load interruption ancillary service to be deployed within 10 minutes of instruction as part of the EECP immediately prior to firm load shedding. The EIL TF is specifically charged to address each of the following issue areas. Qualifications & requirements Dispatch and recall Who gets paid How they are paid Who pays Effect on clearing price Compliance issues Coordination with other ancillary services Self-provision Contract duration Procurement: contract vs. auction

Oct. 31 EIL TF meeting Reviewed 7 proposals –ERCOT –Oxy –Calpine –Chaparral –Enernoc –TIE –Air Products Compiled matrix to compare proposals

Discussion MP Qualifications & System Requirements –Balance widespread participation with efficacious participation –Disarm UFRs –No double-counting MWs Dispatch and Recall –Phone calls v. the “big red button” Measurement and Compliance –Widespread agreement on need, minor differences on details Contract v. Auction –ERCOT proposed 1 or 2 year contracts –Most MPs propose shorter contracts or auction

Next Steps Proposal comparison spreadsheet distributed to stakeholders today Next meeting on Nov. 8 –Identify common ground and differences –Narrow work scope to 2 or 3 proposals –Probably one more meeting late Nov. / early Dec. to finalize PRR/NPRR language PRRs/NPRRs due to WMS on Dec. 13 –PRRs/NPRRs to go through normal PRS process