Suir Main Water Management Unit Action Plan NameSuir Main Water Management Unit Area824 km 2 River Basin District South Eastern RBD Main CountiesTipperary,

Slides:



Advertisements
Similar presentations
Our Water, Our Resource, Our Responsibility Module 5: Water Protection Unit1: Threats to Water Lough More Co. Monaghan.
Advertisements

Municipal & Industrial Regulations. Revised Risk Assessments Status and Risk Measures.
Dinin Water Management Unit Action Plan NameDinin Water Management Unit Area300 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKilkenny Protected.
Sustainable Management of Scarce Resources in the Coastal Zone SMART ICA3 – Kick-off Meeting CEDARE, Cairo, 5-6 January, 2003 Case Study Jordan.
Suir Estuary Water Management Unit Action Plan Name Suir Estuary Water Management Unit Area699 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKilkenny,
1 Europe’s water – an indicator-based assessment Niels Thyssen.
Barrow Owenass Triogue Water Management Unit Action Plan Name Barrow Owenass Triogue Water Management Unit Area328 km 2 River Basin DistrictSouth Eastern.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 2: Water Framework Directive.
UNW-DPC International Workshop Institutional Capacity Development in Transboundary Basins Lessons learned from practical experiences 10 – 12 November 2008.
1 What happens next? November Contents WFD timetable & consultations The River Basin Management Planning Process Applying classification Making.
Aquaculture in Scotland the potential effects of the Water framework Directive the potential effects of the Water framework Directive Peter Holmes Marine.
Are there any Supplementary Measures? Tom Stafford 5 February 2013.
WATER MATTERS TO THE EXTRACTIVE INDUSTRY Presentation to the South Eastern RBD Advisory Council 24 th October 2007 Liam Smyth FIEI Planning & Environment.
Ballyteigue Bannow Water Management Unit Action Plan Name0000. Ballyteigue Bannow Water Management Unit Area644 km 2 River Basin DistrictSouth Eastern.
Wet Woodlands and the Water Framework Directive Ben Bunting, South West River Basin Programme Manager.
Kings Water Management Unit Action Plan NameKings Water Management Unit Area381 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKilkenny/Tipperary.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 3: The Local Authority - What’s happening? Castle Lake,
Environmental Health Unit: Lesson 1 - Introduction Objective: TSWBAT identify issues of how the environment affects our personal health on a daily basis.
The Status of Water Services in County Galway A presentation to the Joint Committee on Environment, Transport, Culture and Gaeltacht 27 th September 2011.
Significant Water Management Issues (SWMI) Report – Draft Template South Eastern PSC Dec 2006.
1 What the WFD will mean for local authorities November 2007.
Chapter 25 Environmental Protection and Global Warming.
Table 3 SWMI – Water Matters –Topics – 1Dangerous Substances 2Forestry 3Septic Tanks (Unsewered Properties) Shannon International River Basin District.
Significant Water Management Issues (SWMI) Report South Eastern RBDAC Dec 2006.
SWMI Submissions 21 st May SWMI Submissions The Water Matters booklet was published on the 22 nd June 2007 and there was a consultation period of.
The implementation of the EC Water Framework Directive in Norway Eva Skarbøvik and Stig A. Borgvang Norwegian Institute for Water Research (NIVA) with.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
WSNTG Annual Conference September 2007 Water Services National Training Group 11 th Annual Conference 6 th September 2007.
Public Participation 16 March – Farmers Journal Article (Andy Doyle) 27 March – Project Stand at Inland Waterways School Poster Competition, Kilkenny 11.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
1 Influence of Main River Basin District Plans on Environment Czech University of Life Sciences Faculty of Environmental Sciences Miroslav Martis,Vladimir.
Drish Water Management Unit Action Plan Name00Drish Water Management Unit Area205 km 2 River Basin DistrictSouth Eastern RBD Main CountiesTipperary Protected.
Water Seminar – 14 April 2010, Athlone European Communities Environmental Objectives (Surface Waters) Regulations 2009 S.I. No. 272 of 2009 Pat Duggan.
WSNTG Annual Conference September 2007 Water Services National Training Group 11 th Annual Conference 6 th September 2007.
IPPC Discharges Monitoring Workshop Water Framework Directive Overview (and its implications for Industry) Peter Webster Regional Chemist (EPA Cork)
Monitoring Programs... A challenge for all of Europe Rivers draining >200km2 in Ireland compared to the Danube basin.
Powerpoint Templates Page 1 Powerpoint Templates Black Sea Basin Directorate – presentation of the scope, responsibilities and project interests Mrs. TANYA.
Significant Water Management Issues (SWMI) – Update South Eastern River Basin District March 2007.
SERBD Advisory Council Meeting 20 th February 2008 Synopsis of Public Meetings.
Monitoring Programme Design in Transitional and Coastal Waters - Classification Issues Dave Jowett, Coast Group Chair and NEA GIG Co-ordinator CIS Workshop.
Derry Water Management Unit Action Plan NameDerry Water Management Unit Area246 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWicklow Protected.
Multeen Water Management Unit Action Plan NameMulteen Water Management Unit Area182 km 2 River Basin DistrictSouth Eastern RBD Main CountiesTipperary Protected.
Slaney Upper Water Management Unit Action Plan NameSlaney Upper Water Management Unit Area260 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWicklow,
Burren Water Management Unit Action Plan NameBurren Water Management Unit Area180 km 2 River Basin DistrictSouth Eastern RBD Main CountiesCarlow Protected.
Water Framework Directive An Introduction David Whiles Anglian River Basin Manager.
Slaney Estuary Water Management Unit Action Plan NameSlaney Estuary Water Management Unit Area351 km 2 River Basin District South Eastern RBD Main Counties.
Owenavorragh Water Management Unit Action Plan Name Owenavorragh Water Management Unit Area398 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWexford.
Clodiagh North Tipperary Water Management Unit Action Plan Name Clodiagh North Tipp Water Management Unit Area258 km 2 River Basin DistrictSouth Eastern.
Prentice Hall © PowerPoint Slides to accompany The Legal Environment of Business and Online Commerce 5E, by Henry R. Cheeseman Chapter 25 Environmental.
Barrow Main Water Management Unit Action Plan Name Barrow Main Water Management Unit Area1110 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKildare,
SERBD River Basin Management Group Meeting 12 th December 2007 Synopsis of Public Meetings.
Slaney Lower Water Management Unit Action Plan Name Slaney Lower Water Management Unit Area417 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWexford,
Colligan Mahon Water Management Unit Action Plan NameColligan Mahon Water Management Unit Area641 km 2 River Basin District South Eastern RBD Main CountiesWaterford.
Sub-basin Management Plans for the Freshwater Pearl Mussel Dr E. Sides, J Ryan, Dr A O’Connor, Dr Colin Byrne Department of Environment, Heritage and Local.
Nore Estuary Water Management Unit Action Plan Name Nore Estuary Water Management Unit Area129 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKilkenny.
Nore Upper Water Management Unit Action Plan Name Nore Upper Water Management Unit Area300 km 2 River Basin DistrictSouth Eastern RBD Main CountiesLaois.
Stradbally Water Management Unit Action Plan NameStradbally Water Management Unit Area123 km 2 River Basin DistrictSouth Eastern RBD Main CountiesLaois.
River Basin Management Plan Steps, Status and Objectives.
Anthropogenic pressures and classification on 2 nd planning period.
Thematic assessments based on results from RBMPs Coastal and transitional ecological status & related presures Inland surface waters Hydromorphological.
Water Pollution. Pollution is the introduction of harmful substances into the environment. Water can become so polluted that it can no longer be used.
Environmental Services Training Group
Identification on Significant Pressures - Surface Water Bodies
Water Pollution.
U.S. Environmental Policy
Principles and Key Issues
Environmental Services Training Group
Proposal for reporting on Programmes of Measures in 2016
Division Water OECD Environmental Performance Reviews Switzerland 2017 Water management AOB – WD & MD – Tallinn
UK experience of Programmes of Measures
Presentation transcript:

Suir Main Water Management Unit Action Plan NameSuir Main Water Management Unit Area824 km 2 River Basin District South Eastern RBD Main CountiesTipperary, Waterford Protected Areas Galtee Mountains SAC, Nier Valley Woodlands SAC, Comeragh Mountains SAC, Lower River Suir SAC. 3 UWWTD - River Suir, River Suir - D/S of Clonmel Sewage outfall to Coolnamuck Weir and Suir Estuary(Upper) - from Coolnamuck Weir to Mount Congreve. 2 drinking water abstractions from River Suir and Trib of Suir at Kilsheelan.

STATUS/IMPACTS Overall status41 RWB - 1 high, 22 good, 11 moderate, 7 poor. 0 lakes. Status elementsQ score dictates overall status in the majority of WBs. Phys Chemical is high or good where monitored and the driver for 4 good WBs. Status was extrapolated for 24 WBs. Chemical Status not monitored. Possible Impacts - EPA Water Quality 2004 ARGLO - (SE_16_2997 and SE_16_3001, Status both Moderate) No change. Continuing with only moderate ecological quality at both locations. (Q scores 3-4) BLACK STREAM (CASHEL) - (SE_16_4181_1, Status Poor) Continuing moderately polluted with poor ecological status again recorded. (Based on Q score 3) FIDAGHTA - (SE_16_3434 and SE_16_3235, Status both Moderate) Continuing unsatisfactory with only moderate ecological status at both locations. (Q scores 3-4) GLASHA (WATERFORD) - (SE_16_1057, Status High) Continuing satisfactory with high ecological status again recorded. (Based on Q score 4-5) NIER- (SE_16_1059, Status Good) Satisfactory at all three locations with high status at two. (Based on Q score 4) OUTERAGH STREAM - (SE_16_3843, Status Poor) Only moderate ecological quality in this spring-influenced stream. (Based on Q score 3-4) SUIR - (SE_16_4181_1, Status Poor, SE_16_4181_2, Status Good, SE_16_4181_3, Status Moderate, SE_16_4181_4, Status Good, SE_16_4181_5, Status Moderate) Mostly satisfactory following improvement at eight locations. Ecological quality was good at 15 locations, moderate at two and poor at five. Continuing polluted d/s of Templemore, in and downstream of Thurles as far as Holycross, and also just upstream of Carrick-on-Suir. The crayfish, a protected species, was recorded at 15 of the 22 sites examined. These successfully reproducing populations could be threatened if reports of the introduction of an alien crayfish to the Suir turn out to be correct. (Based on Q score from 3 to 4) THONOGE - (SE_16_3786, Status Good) Continuing satisfactory with good ecological quality at both locations. (Based on Q score 4) PRESSURES/RISKS Nutrient sources Most TP is diffuse (85%) mainly from agriculture (58%), unsewered industry (17%). 15% is comes from WWTP. Point pressures17 WWTP - Ardfinnan, Boherlahan, Cahir, Cashel, Clonmel, Golden, New Inn, Newcastle South, Ballymacarbry, Bawnfune, Fourmile Water, Kimacomma, Ballylooby, Clonoulty, Kilcash, Ballypatrick, Grange 11 Section 4s: 3 Hotels, Woollen Mill, Dairy Factory, 2 Private Companies, College, Cottage, Inn, School. 13 IPPC – 2 Pharmaceutical Production Companies, Installation Manufacturers, Meat Plant, Retail shop, Meat Plant, Quarry, 4 Private Companies, Protein Production Company, Research Center. 7 WTPs - Cahir Resovir, Springmount, Glenary WTP, Poulavanogue, Kilcash WTP, Graigue WTP, and Kilroe WTP. 1 EPA Licensed Waste Facility Wastewater Treatment Plants (WWTP) and Industrial Discharges WWTP at risk:: Ardfinnan Grange Cashel Cahir Ballylooby Golden Boherlahan Ballypatrick Clonmel Newcastle New Inn Ballymacarbry - An increase in treatment capacity to 600 pe is estimated to be required for future populations Section 4s: 2 at risk IPPCs: 2 at risk Suir Main Water Management Unit Action Plan River Status High Good Moderate Poor Bad Yet to be determined

Suir Main Water Management Unit Action Plan SELECTED ACTION PROGRAMME NB All relevant basic measures, general supplementary measures and SEA mitigation measures apply Point SourcesSee Action Table for WWTP at risk below. Ballymacarbry - An increase in treatment capacity to 600 pe is estimated to be required for future populations. INDUSTRY – Investigate risk Examine the terms of discharge authorisations to determine whether they require review for the purpose of compliance with water body objectives including protected area objectives and environmental quality standards. Diffuse SourcesAGRICULTURE – Good Agricultural Practice Regulations and Enforcement. OtherProtection of drinking water, abstraction control and future licensing. PRESSURES/RISKS Quarries, Mines & Landfills There are 51 quarry within the WMU. There are no landfills or mines within the WMU. AgricultureThere are 22 waterbodies at risk from Agriculture within the wMU: SE_16_3843, SE_16_520, SE_16_3534, SE_16_3060, SE_16_3076,, E_16_3135, SE_16_3394, SE_16_3434, SE_16_3352, SE_16_4135, SE_16_3419, SE_16_4099, SE_16_3041, SE_16_3001, SE_16_3786, SE_16_3928, SE_16_2997, SE_16_3420, SE_16_3235, SE_16_3845, SE_16_3893, SE_16_4181 On-site systems There are 6327 septic tanks in this WMU, none of them are posing a risk to water quality due to their density, location and unsuitable hydrogeological conditions. ForestryThere are no waterbodies within the WMU at risk from Forestry. Dangerous substances There are no waterbodies at risk from dangerous substances within the WMU. MorphologyThere are no waterbodies at risk AbstractionsThere is one waterbody at risk from abstraction within the WMU: SE_16_3845 Other OBJECTIVES Restore/Pro tect water bodies Alternative Objectives Extended Deadlines – 16 water bodies with 2021 deadline New Modifications or Development – Clonmel West flood alleviation Scheme underway with works to be completed by end of Tender process for contractor for next phase underway. HMWB/AWB - none FUTURE DEVELOPMENT Future Pressures and Developments Throughout the river basin management cycle future pressures and developments will need to be managed to ensure compliance with the objectives of the Water Framework Directive and the Programme of Measures will need to be developed to ensure issues associated with these new pressures are addressed.

River Data Suir Main Water Management Unit Action Plan This table outlines water body information including status and a breakdown of its elements, protected areas, objectives and timescales.