1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.

Slides:



Advertisements
Similar presentations
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Advertisements

1 Midland Community Meeting Michigan Department of Environmental Quality Steven Chester, Director Jim Sygo, Deputy Director.
BoRit Superfund Site Timeline
ENVIRONMENTAL UNIT IN AN ICS STRUCTURE. EU Mission Statement The Environmental Unit is established to provide technical and scientific expertise and capabilities.
1 Fort Monroe: An Update on the Environmental Cleanup VDEQ Presentation to the Fort Monroe Federal Area Development Authority March 19, 2009.
 Site Assessment and Mitigation Program Department of Environmental Health – County of San Diego.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Stephen TerMaath Chief, BRAC Program Management Division 5 June.
Bob Mashburn Army Regional Environmental Office Atlanta, Georgia ARMY CLEANUP PROGRAM – Status Update –
WWII Navy Bomb Disposal School , on AU campus for research & education CIVIL WAR Ft. Gaines & other forts located near SV area during Civil War.
1 Aggregate Areas David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los Alamos Field Office March 3,
River Corridor Closure Project Safety People Results U.S. Department of Energy Richland Operations Office 100 Area and 300 Area Component of RCBRA Steve.
Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND.
CT DEP'S PERSPECTIVE ON SITE CHARACTERIZATION June 6, 2002 Presented by: Christine Lacas, Supervising Environmental Analyst Permitting, Enforcement & Remediation.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Fort George G. Meade Groundwater Contamination, Odenton, Maryland Interim Measures Update Restoration Advisory Board Meeting November 18,
1 Ordnance Demolition Area (ODA) Proposed Plan & Public Meeting PRR National Wildlife Visitor Center Thursday, April 28, 2011, 6:30-8:30pm Sponsored By:
Printed by DEVELOPING A NON-PUBLIC WATER SUPPLY PROGRAM FOR THE STATE OF GEORGIA Scott A. Uhlich, MCP Georgia Department of Human.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Dr. Stephen TerMaath Chief, BRAC Program Management Division 22.
Former DuPont Barksdale Works Project Update June 07, 2006 Great Lakes Visitors Center DuPont CRG.
Pershing Hill Elementary School Burn Pit Stockpile Removal Project 1.
Investigating Ground Water Contamination at Ohio’s C&DD Landfills Aaron Shear Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013.
 EPA’s soil sampling objectives  Technical approach  Technical assistance to DTSC/DOE  Next Steps and Schedule.
ACTIVITY NAME Former Naval Station Treasure Island, CA TIDA Board of Directors Meeting 9 July 2014.
Wetlands Reserve Program Case Study An Overview of the External Audit Process Helping People Help The Land.
Presentation to the Restoration Advisory Board Plan for Site Investigation: Munitions Response Program (MRP) Site 1 Carr Point Shooting Range March 18,
Tuesday, August 31, 2010 Dennis Wisnosky DoD Business Mission Area Chief Technical Officer & Chief Architect in the Office of the Deputy Chief Management.
Assistant Chief of Staff for Installation Management Recent Successes 1 Environmental Remediation –Approximately $1B of environmental remediation remains.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
Emergency Preparedness Conference State & Tribe’s All-Hazard and Pandemic Influenza Planning Efforts Mike Harryman Emergency Preparedness Director Oregon.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG.
Carousel Tract Environmental Remediation Project Update by Expert Panel to Regional Board July 11, 2013.
Potential Addition of Vapor Intrusion to the Hazard Ranking System U.S. EPA Office of Solid Waste and Emergency Response February 24, 2011 Listening Session.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Supporting Community Participation in U.S. Arctic Ocean Governance Strengthening Institutions Strategies for Cooperative Management in the Marine Environment.
Team Successes at the Former Memphis Depot, Memphis, Tennessee Presented by: David D. Nelson, P.G.Thomas C. Holmes Project Manager, CH2M HillProject Manager,
Fort George G. Meade KEMRON PBC Sites Near-Term Deliverables Update Operable Units 1, 3 and 5 Restoration Advisory Board Meeting March 17, 2011 KEMRON.
Name/Office Symbol/(703) XXX-XXX (DSN XXX) / addressDate-Time-Group 19 September 2008 Fort Monroe Closure Environmental Planning.
Margaret Byrne, U.S. Fish and Wildlife Service
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force The Air Force Military Munitions Response Program For: Mr. William.
Western Avenue WQARF Site Western Avenue/Phoenix Goodyear Airport CAG Meeting of August 8, 2013 Delfina Olivarez.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Using Insurance to Fund Brownfield Development Technical Issues Geoff Glanders, President August Mack Environmental, Inc.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
Fort Detrick Installation Restoration Program Area B Groundwater November 1, 2010 Fort Detrick, Maryland A Sustainable Community of Excellence.
Proposed Plan for No Further Action
Anniston PCB Site Review of Risk Assessments for OU-1/OU-2
Safe Drinking Water Act , CCL and Perchlorate
THE SUPERFUND PROCESS Assessment and Listing
Environmental Cleanup Program Status
MILTECH Study Update LtCol PJ Zimmerman, USMC
Wurtsmith Restoration Advisory Board Meeting
Agenda for 24 OCT 2013 Picatinny Arsenal Restoration Advisory Board
Attendance, Introductions & Correspondence Old Business
Timothy Veatch, Section Chief
Advanced Environmental Management (AEM) Training Phase I
Board of Public Utilities August 17, 2017
Presentation transcript:

1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010

2 Environmental Restoration Properties - BRAC

Trap and Skeet Range 17 3

4

5 Lead Shot Fall Range

6 Former Trap and Skeet Range 17 (FGGM-94) Background  Part of 8,398 acres transferred to DOI - operations ended in late 1990’s  2004 ecological risk assessment (ERA) prepared by FWS/EPA Status  2004 ERA data gaps exist - Pb shot, As, groundwater  RI in place, FS, PP and ROD pending  Remedial Action – TBD based upon ecological and human health risk assessment Milestones  Remedy in-place: FY11 (estimated)  Response complete: FY11 (estimated)

7

2004 Soil Lead XRF Results (mg/kg) 8

2004 Lead Shot (pellets / ft 2 ) 9

10 Former Trap and Skeet Range 17 Remedial Investigation  Why Conduct An RI? – Required under CERCLA/NCP. Part of the Fort Meade Environmental Restoration Program. Simply put, it’s the right thing to do….because metals (primarily lead and arsenic have been released into the environment at elevated concentrations.  RI Objective – Further characterize the site with regard to the occurrence and distribution of soil and groundwater contamination and assess the associated ecological and human health risks posed by this contamination.  Purpose - Identify and estimate the costs for implementing potential remedial actions to adequately control the risks (Feasibility Study).

11 Former Trap and Skeet Range 17 RI TASKS Task 1—Project Planning/Scoping - Work Plan represents the bulk of Task 1. Includes soliciting stakeholder comments and comment resolution, revision/finalization. Final WP was submitted Oct Task 2—Community Relations - Through the RAB, the community will remain engaged in this RI (and FS process). Task 3—Field Investigation - Collecting and analyzing soil and groundwater samples as described in the SAP. Conducted Nov 09 – Mar 2010.

12 Former Trap and Skeet Range 17 RI TASKS (cont) Task 4—Data Evaluation – Previous and new site data will be integrated and evaluated to update the understanding of the occurrence and distribution of soil and GW COPCs. Includes comparing the analytical results to appropriate screening levels and preparing contour maps to illustrate contaminant distribution. Task 6—Assessment of Risks - Existing and pending site assessment data will be used to assess potential current and future human health and ecological threats. Task 7—Remedial Investigation Report Draft Final (Stakeholder Review) 01 May 2010 (est) Final -01 August 2010 (est)

13 Former Trap and Skeet Range Preliminary RI Results Preliminary Results - Soil

14 Groundwater Monitoring Well Locations

15 Preliminary Results - Groundwater

Markus Craig Program Manager Office of the Assistant Chief of Staff for Installation Management; BRACD NC3 - Taylor Building 2530 Crystal Drive # 5064 A Arlington, VA Office phone: Steve Cardon, CHMM BRAC Environmental Coordinator Department of the Army Directorate of Public Works - Environmental Division 239 Chisholm Ave; Suite 5115 Fort Meade, MD Points of Contact 16