Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO.

Slides:



Advertisements
Similar presentations
General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
Advertisements

Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Replies by N.Meyners (in green) 27 August 2007ILC Questions M. Breidenbach1 ILC Detector Strategy Questions Some of us have been wondering about the fundamental.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
The CERN-JINR Collaboration J. Engelen March 27, 2006.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
Fringe Field in DH Marco Oriunno (SLAC), January 13, 2015 SID Workshop 2015, SLAC.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Construction and Installation of the CLIC Experimental Area
SID Engineering Marco Oriunno (SLAC), Jan CLIC Workshop, CERN Toward the TDR.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
ORKA Preservation Task Force ORKA Preservation Task Force first meeting Wednesday, February 8, Notes by Peter H. Garbincius Notes from meeting are.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
Change Management Board Meeting V Kuchler 23 January, 2015.
ILD requirement for assembly space and time 2015/11/3 Yasuhiro 1.
Strategy of detector solenoid construction Yasuhiro Sugimoto KEK 1.
ILC TRANSPORT AND INSTALLATION Questions from last CES: Beam height explanation, Transport implications of sloping access tunnels proposed for access to.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
SiD Collaboration Meeting SLAC, December 2011
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CLIC Handling Engineering Update
CLIC Civil Engineering Update
Updated Design of Detector Hall
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Interaction Region Alternative Layouts
CRANES By griffin.
Update of experimental hall in Japanese mountain site
Detector hall in mountain regions
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Detector hall in mountain regions
RDR Baseline Layouts for Interaction Region
Kitakami IR Access Discussions
Presentation transcript:

Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO

2 Japanese ILC Site – Horizontal Tunnel Access

3 Kitakami site - Detector Access Yard Several location options for of the Access Yard, how to select them : 1.Ideally a Short tunnel length and a low slope, but most likely a compromise of the two features. 2.How much does the Detector Access Yard share with the installation and maintenance of the CFS around the IP ? A seprate Access Yard for the machine ? 3.Proximity to Freeways and Rail rated for heavy loads transport 4.Assuming that the same developed area for all the options is available 5.Costs.

4 ILC needs to have “Lean” Detectors Toyota Factories pioneered Lean Assembly : “preserving value with less work” Fight The Seven Muda (futilities) Transportation, Inventory, Motion, Waiting, Over-processing, Over-production, Defects. Big Detectors for Big Science must be Lean : Time vs labor (Costs) Time vs Technology drive (Increasing Performances) Low Maintenance (Costs) High Upgradability (Costs and Scientific reach) Shorter commissioning to get nominal performances International Competition

5 Lean assembly – Some Examples CMS Detector Shipbuilding Airbus

6 Detector Hall Requirements – The War of Resources Two detectors in one experimental hall must share a lot of infrastructures even more than beam time. 1.Single Horizontal tunnel : Minimize by design the risk of logjam 2.Single 200t+ bridge crane : strict planning of the heavy lifts 3.Unfriendly environment 4.Safety of the personnel …Planning tasks on surface As Many As Reasonable Achievable : A.M.A.R.A. …Decoupling detector assembly from Experimental Hall construction

7 Assembly Yard - CMS 140 m 223 m 150 m 34,000 m2 25 m Control Room Offices Gas 1 Gas 2 He

8 Assembly Yard - CMS

9 SPS beam extraction - North area (CERN) 46 m 230 m

10 SPS beam extraction - North area (CERN)

11 Detector Assembly Hall Iron Barrel Doors Solenoid One bridge crane ~ 30t Ground motion with pushback trucks Detector units loaded with sensors, tested and pre-commissioned Loading Area

12 Kitakami Access Yard 60,000 m2 Tunnel

13 Access Yard Buildings Assembly Hall #2 Assembly Hall #1 Offices Access Tunnel Site Entrance 400t Loading Station

14 Kitakami Access Yard 5% 190 m 320 m Undergound Detector Hall

Solenoid Assembly and Commissioning

16 Detector Units on cart + Pushback track

17 DCL-TLG100 Moving Crane – 400 T

18 Transferring parts underground

19 Loading station 400 tons

20 Loading station 400 tons

21 Detector Hall

Magnet Installation – Japanese Site 215 tons Crane