Briefing to the Portfolio Committee on the Comparison on Procurement Methodologies 6 June 2006.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

ISTISNA AS MODE OF FINANCE
Budget scoring and accounting for PPPs The Eurostat approach (ESA95) Marcin Woronowicz European Commission, Eurostat, Unit C.3 – Public finance.
Contract Management and Regulation Vickram Cuttaree The World Bank St. Petersburg – May 24, 2008.
Multivendor Interoperability
A framework for organising and financing infrastructure provision Jan-Eric Nilsson, VTI.
Introduction to Public Private Partnerships
Introduction Leasing and hire purchase are financial facilities which allow a business to use an asset over a fixed period, in return for regular payments.
HEALTH PPPs An introduction Is there a recipe for success?
Funding Social Care PFI projects Christine Galeon Tel: April 2003.
Public Private Partnerships in the Portuguese Hospitals Sector Ashley Blows Tel: 44 (0) November 2003.
INTEGRATED INFRASTRUCTURE DELIVERY – FINDING A PPP MODEL.
v1 The Future of PPPs in Hong Kong Project Chambers Forum 28 May 2010 Presented by Sam Farrands.
Grow Your Business through Contact Centre Outsourcing Fanny Vaz Director, Personal Market Unit, CTM.
Novel Procurement Options ARBE121 – PFI  Variants, additions to or environments for routes  Private Finance Initiative (PFI) A funding & operational.
Structure of Project in PPP- (2) John Plumb. Agenda Following on from the Strategy and business case to develop the ideas Structure of PPP arrangements.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
PROJECT FINANCE INITIATIVE and PUBLIC PRIVATE PARTNERSHIPS Simon Par Keeling, Société Générale Paris.
Essentials of Islamic Banking and Finance
Namibia Health PPP Conference PRESENTER: Sithembiso Mkwanazi December 2014 Infrastructure: Equipment and Medical Technology.
Financing Urban Public Infrastructure
© Atos KPMG Consulting 2003 PPPs IN HEALTH CARE: AN INTERNATIONAL PERSPECTIVE Emmett Moriarty Senior Health Sector Specialist.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
REGULATORY LEGAL AND CONTRACTUAL ASPECTS OF PPP IN WATER AJAY RAGHAVAN Counsel Training Workshop, Bhopal, February 2009.
Audit of procurement and financing for Brampton civic hospital project ( A PPP Project) About this Project-- (i) In late 1990s,HRSC(Health Services Restructuring.
NPDO Non Profit Distributing Organisation Mikko Ramstedt, Project Adviser Financial Partnerships Unit.
The main Legal and Business Aspects of: Public Private Partnerships (PPPs) by Alexander Lykourezos Lykourezos Law Offices Belgrade, May 11 th, 2006.
Annual Governance Report North Dorset District Council September 2010 Audit 2009/10.
An Introduction to Public Private Partnerships: Why Government needs to work with the private sector Vilnius 22 nd November 2006 Stephen Harris - Head,
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
Iraq Finance 2012 Public Private Partnerships Abraham Akkawi September 18, 2012.
ACCOUNTING FOR HEALTHCARE Pertemuan 8-12 Matakuliah: A1042/Accounting Software Package for Services Tahun: 2010.
Joint Venture in construction company in West Bank.
UK Parliamentary Committee Report on PFI (PPP) August 2011 All PFI projects have to complete a Value for Money (VfM) assessment of the PFI option compared.
1 OECD - Working Party of Senior Budget Officials Public-Private Partnerships: Affordability, Value for Money and the PPP Process Frédéric MARTY CNRS –
Public and Private Partnerships in the Baltic Region: Experience of Riga City.
1 Briefing on the operation and management of Public Private Partnerships (PPP)
Public Private Partnerships (PPPs) and The World Bank
The basic Legal Aspects of Public Private Partnerships (PPPs) by Alexander Lykourezos Lykourezos Law Offices 1 st ARAB-GREEK ECONOMIC FORUM Athens, September.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy United Kingdom.
PRESENTATION: PORTFOLIO COMMITTEES ON CORRECTIONAL SERVICES AND HEALTH PROVISION OF HEALTH CARE WITHIN CORRECTIONAL CENTRES 1.
Department of Correctional Services NEW GENERATION CORRECTIONAL CENTRES BRIEFIENG SYNOPSIS DEPARTMENT OF CORRECTIONAL SERVICES.
Public–Private Partnerships in Health Carmen Carpio Senior Operations Officer
Introduction to Central Services Branch Building a caring correctional system that truly belongs to all PROGRESS ON THE 7 DAY ESTABLISHMENT PORTFOLIO COMMITTEE.
Introduction “The process which charges fixed as well as variable overheads to cost units”
OUTSOURCED SERVICES: DEPARTMENT OF CORRECTIONAL SERVICES.
Department of Finance Private Sector Merger Briefing - 26 September 2013 Summary of major discussion points Merger Implementation Group Merger of Synergy.
DPW PRESENTATION TO PORTFOLIO COMMITTEE ON CORRECTIONAL SERVICES 09 FEBRUARY 2010.
1 Department of Correctional Services Vote 19 CURRENT STATE OF EXPENDITURE: 2001/2002.
1 MEDIUM TERM BUDGET POLICY STATEMENT(MTBPS) CORRECTIONAL SERVICES 2006/ /09 DEPARTMENT OF CORRECTIONAL SERVICES.
DEPARTMENT OF CORRECTIONAL SERVICES
Autumn Staff briefings As a NHS patient, care is provided free at the time you need it, whether this is from a hospital or community nurse or.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
SESSION 2 Tuesday 9.30 – Selection of PPP Projects.
1 THE DEDICATED PPP UNIT OF THE SOUTH AFRICAN NATIONAL TREASURY Philippe Burger University of the Free State South Africa.
DCS 2010/11 ENE BUDGET ALLOCATIONS PORTFOLIO COMMITTEE
DCS PORTFOLIO COMMITTEE PRESENTATION NEW CORRECTIONAL CENTRES
Josip Saša Marenjak1, Diana Car-Pušić2, Ivan Marović2
Presentation to the Portfolio Committee on Finance
LEASING.
PUBLIC PRIVATE PARTNERSHIPS KERJASAMA PEMERINTAH SWASTA
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Building a caring correctional system that truly belongs to all
Status of Vacancies Disciplinary Cases Shift Pattern
Building a caring correctional system that truly belongs to all
CURRENT STATE OF EXPENDITURE: 2001/2002
CORRECTIONAL SERVICES 2001/2002: BUDGET INTERPRETATION
Building a secure Home Affairs
Building a caring correctional system that truly belongs to all
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
Presentation transcript:

Briefing to the Portfolio Committee on the Comparison on Procurement Methodologies 6 June 2006

Introduction The objective of this presentation is to provide details of the advantages and dis-advantages of three different procurement methodologies in relation to the procurement of new correctional centres. The three different procurement options compared in this presentation are: A conventional procurement by DCS more commonly known as a Public Sector Comparator procurement; A complete Public Private Partnership with full services required rendered by the private partner; and A project finance model (partial Public Private Partnership) where specific core functions will be provided by DCS and the balance by the private partner.

Public Sector Comparator (PSC) Procurement (Conventional Model) By adopting the Public Sector Comparator Procurement option the Department with the assistance of NDPW will be responsible for the complete implementation of the project from start to finish and will be responsible for managing each of the elements of the project itself. As a rule, the majority of risks will remain with DCS and numerous sub-contracts will be entered into by DCS with third parties to deliver the required services.

Public Private Partnership (PPP Model): The Public Private Partnership procurement option is based on a model whereby the risks are allocated to a third party to manage them. Responsibility for all services required will be allocated to the private partner and for most, the private party will take the risk of operations and construction.

The Project Finance Model (PFM model): In essence this option is still a public private partnership with the exclusion of certain specific services required from the private partner. Core services to DCS will be provided by DCS and the balance will be provided by the private partner.

DESIGN PSC Will be input driven and design provided by DCS/DPW. DCS able to ensure exact design according to own preferences. RISK OF DESIGN REMAINS WITH DCS. PPP Design to be developed and provided by private partner in response to output specifications. DCS/DPW able to ensure design meets requirements without sign-off. RISK OF DESIGN TO PRIVATE PARTY. PFM Design to be developed and provided by private partner in response to output specifications. DCS/DPW able to ensure design meets requirements without sign-off. RISK OF DESIGN TO PRIVATE PARTY.

CONSTRUCTION PSC DCS/DPW to issue construction contract. Construction according to design as provided by DCS/DPW. DCS to manage correct construction according to design. Cost overruns, certain delays and insurance may be for account of DCS if not managed adequately. PPP Construction contract issued by private party. Private Party to manage correct construction according to design. Construction risk to private party. Cost overruns, certain delays and insurance all private party risks. PFM Construction contract issued by private party. Private Party to manage correct construction according to design. Construction risk to private party. Cost overruns, certain delays and insurance all private party risks.

COMMISSIONING PSCDCS responsible for commissioning and planning of commissioning once construction is completed. PPPCommissioning the risk of private party after construction subject to independent certifier declaring facility ready and available. PFMDCS responsible for commissioning and planning of commissioning once construction is completed

CUSTODIAL OPERATIONS PSC DCS responsible for all staff deployment, recruitment, training and staff related matters. Facility custodial services remains with DCS including management function. PPP Private Party responsible for all custodial services and staff recruitment, training and other staff related matters. This include management of the facility. PFM DCS responsible for staff deployment, training and all staff related matters. Facility custodial services remains with DCS including management function.

FACILITIES MANAGEMENT SERVICES PSC DCS responsible for all facilities management services either by means of providing the services itself or through sub-contracting various third parties. All risks remain with DCS /DPW. These services include cleaning, food services, medical and others. PPP Private Party responsible for all facilities management services. All risks relating to these services are transferred to the private party. Penalty regime in place for non-performance. DCS remain accountable. PFM Private Party responsible for all facilities management services. All risks relating to these services are transferred to the private party. Penalty regime in place for non-performance.

NON CORE FUNCTIONS PSC DCS is responsible for all non-core services. This include medical and nutritional services. PPP These functions are transferable to the private party. Although risk is transferred to the third party with a penalty regime accountability is still vested within the Department. PFM These services will be considered to be transferred to a private party with a penalty regime for non performance. (Partially)

BUILDING MAINTENANCE PSC DCS / DPW responsible for all building maintenance over the period. All risks relating to maintenance and budget availability remains with DCS / DPW. PPP Private Party responsible for all building maintenance during the project period. PFM Private Party responsible for all building maintenance during the project period. Will also be responsible for ensuring building life lasts past concession period. Penalty regime in place for non- performance. The Department can consider the extension of the period with another 5 years and proper budget projections will be possible.

BUDGET ASPECTS PSC DCS to be able to fund upfront capital outlay during two year construction period. All staff recruitment, training, services, building maintenance and upgrades for account of DCS. Budget will have to take account of price escalations over and above CPIX. May be difficult to keep budget constant due to unexpected escalations other than in the building industry. PPP DCS only commences with payment once facility is available and pays for the number of beds on a daily basis and a capital fee related to the building. Penalty regime in place for non- availability. Unitary Payment fixed at contract signature and escalates with CPIX over contract period. PFM DCS takes responsibility for all staff related and custodial services costs from day of occupying facility. Construction costs together with normal facilities management costs to be paid per unitary payment regime including penalties for non- performance. Unitary payment to escalate with CPIX

INTEGRATION ISSUES PSC Integration risk remains solely the responsibility of DCS. With different suppliers and different parties involved, integration between design, construction and operation may be extremely difficult. PPP Integration risk solely the responsibility of the private party. Low risk as operator and construction partner will ensure that integration works. The risk to develop operational output specifications variations remains with the Department. Any variations will have financial implications. PFM As custodial services are performed by DCS and facilities management and other services are provided by the private party, integration of the two aspects will be investigated and dealt with during the feasibility phase in conjunction with National Treasury.

DAMAGE TO FACILITY PSC DCS will remain the sole party responsible for any damages to the facility due to forces of nature, offender or staff actions. PPP Private party is responsible for damage to facility. Offender and staff actions causing damage will be the responsibility of private party. DCS to implement penalty regime for non-availability. Private party required to insure against these potential damages. PFM Private party is responsible for damages to the facility. Any damages due to will full actions by staff or offenders will be dealt with according to the penalty regime.

SECURITY RELATED ISSUES PSC No problem in case of staff dis-satisfaction. Staff can be moved between facilities where and if problems arise. Security problems related to staff as well as offenders can be managed between the various correction facilities. Movement of staff and other resources is possible were problem areas arise. PPP Since no further PPP facilities, current operators face problems as no additional staff can be utilised if potential problems arise. May see South Africa as a small market and slowly withdraw for South Africa. With the 2 facilities the service providers has limited resources to manage major staff related problems. PFM No problem in case of staff dissatisfaction. Staff can be moved between facilities where and if problems arise. Security problems related to staff as well as offenders can be managed between the various correction facilities. Movement of staff and other resources is possible were problem areas arise.

COMPLEXITY PSC Conventional procurement reasonably simple to implement as long as implementation project management function works efficiently. Although we use the same procurement process special attention will be given to the interface between operations and facilities management. PPP PPP’s in general more complex and requires more skills. PFM Could be potentially very complex depending on final structure of services required and provided by DCS. Similar or more complex than PPP.

RISK TRANSFER PSC Limited risk transfer to a private party for the operation of the facility remains with the Department. PPP Risk is transferred to a private party through a PPP agreement. Not withstanding the penalty regime according accountability remains with the Department. PFM Less risk transfer than under full PPP.

Conclusion The above table provides a summary of the more significant issues and differences between the three procurement models. After completion of the next stage of the feasibility study, the Transaction Adviser will be in a better position to advise on which option is better and include a comparison of detailed costs, affordability and detailed risk transfer issues.

Figures PPP 2005/06 PPP 2006/07 DCS 2005/06 DCS 2006/07 INMATES PER CAPITA COST R R R R

Captured Budget PPP – 2006/07 INDEX FEE FIX FEE TOTAL BUDGET

Thank you Building a caring correctional system that truly belongs to all