ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona 12-15 May 2003 1 Question 7 (7.1) Instrument X V = 1 p.u. Instrument YV = 1.043p.u. Error = 4.3%

Slides:



Advertisements
Similar presentations
Low and Medium Voltage Test Facilities in Varennes' Scientific Park Workshop: DER Laboratories of Excellence, Testing, and Standards Napa, December 4th.
Advertisements

Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Multi Functional Digital Fault Recorder
Understanding the IEC Standard 李嘉凱 指導教授:柯開維.
1 Distributed Generation and Power Quality. 2 Relaying considerations DG infeed may reduce the reach of overcurrent relays –DG feeds fault, so utility.
MTE´s Portable Product Portfolio
Circuit breaker testing – New Approach
Frankfurt (Germany), 6-9 June 2011 EN voltage dips and swells classification as an instrument for responsibility sharing Maurizio Delfanti Department.
Introduction to Neurobiology Lecture 8: Purkinje Cells 1.
THE VERIFICATION OF SHUNTING METHOD FOR LIMITATION OF EARTH FAULT CURRENT IN MV COMPENSATED NETWORKS Petr TOMAN Jaroslava ORSÁGOVÁ David TOPOLÁNEK Vladimír.
GE Consumer & Industrial Multilin  Single & Three phase models  Specific mount CT’s  Rectangular & Toroidial models  Plastic case & cast models  Multi.
F. Ferrandis_SP_ALPHA 2_BLOCK 2_Paper 35_Presentation Barcelona May POWER FACTOR CORRECTION WITHIN INDUSTRIAL SITES EXPERIENCES REGARDING.
G. Koch D Session 3 – Block 3 – Question Barcelona May Experience with Combined Protection and Control IEDs Traditional panel with analogue.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Portable Working Standard and Power Quality Analyzer
McGranaghan US Session 2 Block 4 Question 12 Barcelona May Statistical Framework for Establishing Target Reliability Levels and Classifying.
APPA 2005 E&O Technical Conference Memphis, TN April 19, 2005
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
J A K Douglas UK Session ALPHA2 – Block 4 Barcelona May SETTING OF TARGETS FOR CONTINUITY OF SUPPLY THROUGH BENCHMARKING DOUGLAS J.A.K. and.
All rights reserved Gas-insulated Switchgear (GIS)
All rights reserved MV SWITCHGEAR.
Philippe Deschamps FR Author – Alpha 1 – Block 2 Barcelona May Safety / cost - no compromise Global cost drives utilities's choices Regarding.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
Electric network faults seen by a wind farm – analysis of measurement data Sanna Uski, Seppo Hänninen, Bettina Lemström.
Many BIDOYNG units installed ~ 250 Reclose operations after faults > 80% customer supplies restored successfully.
A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.
1 The Need for Probabilistic Limits of Harmonics: Proposal for IEEE Std 519 Revision Paulo Ribeiro Calvin College / BWX Technologies, Inc Guide Carpinelli.
Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Activities of Joint Cigré/CIRED/UIE Power Quality Working.
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
Frankfurt (Germany), 6-9 June 2011 Round Table 2a Voltage Quality Monitoring, Dip Classification and Responsibility Sharing Kevin Niall, ESB Networks on.
Nelson Kagan BR Session 4 – Block 3 – Planning – Paper #66 Barcelona May Technical Assessment for the Installation of Dispersed Generation.
Juan Mora SP Session 2 – Block 3 – Question 8.1 Barcelona May 2003 University of Girona 1 A slide has to be easy to read It must not be too crowded.
POWER HOUSE.
Introduction & Overview Company Number , registered in England & Wales. December 2015.
Frankfurt (Germany), 6-9 June 2011 Irina Melnik – the Netherlands – Session S2 – 0665 Intelligent Distribution Substation improves power quality.
McGranaghan/Sabin US Session 2 Block 3 Question 8 Barcelona May Calculating System Events and Using Voltage Sag Benchmarking as a System Performance.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
BENATO IT Session 4 – Block 3 – Question 6 Barcelona May 2003 THE ISLANDING PROBLEM PASSIVE PROTECTIONS AS DEMONSTRATE THE POSSIBILITY OF FAILING.
S. MELQUIOND France Session 1 – Block 1 – Question 1- 5 Barcelona May Question 1-5 Is the transformer protection by mean of protection switch.
Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power in the LV distribution network to meet EN standard requirements David MEZERA
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Digital Multifunction Protection. INDEX 1.Key Features 2.Protection 3.Automation & Control 4.Metering and Power Quality 5.Recording 6.Scalability and.
Évora demonstrator site
Power Quality at Solar Distributed Generation Facilities
SUB-STATIONS.
Electricity is produced at the power station.
Overhead Distribution Systems
Per-Unit System.
Paper 2.59 COMPREHENSIVE DEVELOPMENT OF POWER QUALITY MANAGEMENT AND EVALUATION OF VOLTAGE DIP PROBLEMS A. Mäkinen, P. Järventausta, P. Verho, Tampere.
Power Systems Protection Test Equipment
Changes to DSR Procedures 2018/1
Fault Statistics – Quo Vadis Günther Brauner AT
Protection Philosophy
PQube vs. X (instrument from competitors)
Technical sheet N°1 Using at frequency 60 Hz All cb’s
EUS 260 Capstone Project.
F Duval, on behalf of EN/EL
Exercise Session 2 Power systems.
Odawa Substation Outage
3 3 R2 R2 R1 R1 RM R3 R3 R4 R v0 v0 Problem 1 (100%)
Prepared by: Ismael K. Saeed
Exercise 9 Power systems.
Long Island Interconnection Working Group Meeting August 22, 2019
Presentation transcript:

ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona May Question 7 (7.1) Instrument X V = 1 p.u. Instrument YV = 1.043p.u. Error = 4.3% for 200ms interval Over 3 s interval Error = 0.29% > Class A accuracy limit = 0.1%

ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona May Question 8 (8.1, 8.2, 8.3) Definition of events System events Complex events examples Methods of processing dips, swells and short interruptions Summation Phase aggregation (IEC ) Temporal aggregation (one-minute) (IEC , IEEE 1159) –On a phase-by-phase basis –On a 3-phase basis –Severity and duration of aggregated events Statistical processing of voltage dips and short interruption data Extrapolation up to one year not recommended

ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona May Question 8 (8.1, 8.2, 8.3)

ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona May Question 13(13.2, 13.3, 13.4) An Overhead Distribution Line has the potential to provide PQ raw and processed data from: Substation Located Circuit Breaker Controller (MV) or PQ Analyser connected to the Substation Busbar Reclosers Controllers (MV) Voltage Regulator Controller (MV) Intelligent Revenue Meters (LV) PQ Analysers connected to the distribution line at strategic locations (if necessary) Substation Recloser Revenue Meter Voltage regulator