Integrated Electronic Message Board ( iEMB) Phase 2 Presentation Team S02PT.

Slides:



Advertisements
Similar presentations
12 October 2011 Andrew Brown IMu Technology EMu Global Users Group 12 October 2011 IMu Technology.
Advertisements

Online Peer Evaluation System Team Green Apple Team Members Ada Tse Amber Bahl Tom Nichols Matt Anderson Faculty Mentor Prof. M Lutz Project Sponsor Richard.
Web Applications Development Using Coldbox Platform Eddie Johnston.
LifeSize ® Control ™ 4.0 Regain Control of your Video Communications Network.
Team Spider Interim Presentation. Team Spider Members Sponsor  Telecom Consulting Group N.E. Corp. (TCN) Advisor  Professor Raghu Reddy Students  Adam.
Task Management System Client xx Team Member 1 Member 2 Member 3 This is not a real project, but a student project carried out for a system requirements.
Online Peer Evaluation System Team Green Apple Team Members Ada Tse Amber Bahl Tom Nichols Matt Anderson Faculty Mentor Prof. M Lutz Project Sponsor Richard.
Online Peer Evaluation System Team Green Apple Team Members Ada Tse Amber Bahl Tom Nichols Matt Anderson Faculty Mentor Prof. M Lutz Project Sponsor Richard.
WSV314. MAP 5.5 Internet ExplorerWindows 7 Software Usage Tracking Heterogeneous Server & Database Inventory Windows Server 2008 R2 Hyper-V SQL Server.
WCL318. MAP 5.5 Internet ExplorerWindows 7 Software Usage Tracking Heterogeneous Server & Database Inventory Windows Server 2008 R2 Hyper-V SQL Server.
Windows.Net Programming Series Preview. Course Schedule CourseDate Microsoft.Net Fundamentals 01/13/2014 Microsoft Windows/Web Fundamentals 01/20/2014.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Business Plug-In B15 Project Management.
DYNAMICS CRM AS AN xRM DEVELOPMENT PLATFORM Jim Novak Solution Architect Celedon Partners, LLC
Conference management system Jordanian Renewable Energy Society (JRES)
Ivan Dontsov, Andy Phenix, Maureen Rottschaefer. Agenda  Status  Demo  Lessons Learned.
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
MFMS Micro Finance Management System Presented by: SE 18 Team 2E Date : 10 th August 2011 INT/MFMS/MA.1 Team SE18 2E.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
Social Network for Behavior Change Team #11: Gavin Monroe Nicholas Schramm Davendra Jayasingam Client: Yolanda Coil Advisor: Simanta Mitra.
SE18S07 1ISS SE18T7S Metric NoName A U AYE THET MON A L NG SIEW LENG A X PRAGATI A X TIN LAI WAI A E VARUN TAK A A.
Ivan Dontsov, Andy Phenix, Maureen Rottschaefer. Project Outline “The primary objective of this OMSE 2012 Practicum Project is to extend and refine the.
BUSINESS PLUG-IN B15 Project Management.
Integrated Electronic Message Board ( iEMB) Increment 2 Presentation, 27-Jan-2014 Team SE02S2 1.
Volunteer Management System Presented by Team SE18-08S SE18-T08S - Jan 2012.
LOGO Penny Auction Website Capstone Project Bid It Team Supervisor Huỳnh Anh Dũng Nguyễn Thị Hòa Nguyễn Duy Khánh Huỳnh Hiếu Nghĩa
Volunteer Management System Presented by Team SE18-08S.
1 Another group of Patterns Architectural Patterns.
INTEGRATED E LECTRONIC M ESSAGE B OARD Project By : SE20 PT02.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
Introduction to Web Dimitar Nenchev Ivan Nakov
Enterprise.NET 1 CA - presentation HENDRI FRANYOHT082210N KRISHNAMURTHY SAMANTH YADAVHT082239L CAI XIANGHT082182A KHAING MYAT THWEHT082208L AUNG MOEHT082184B.
Team Think For You. Outline  Introduction  Process  Requirements Engineering  Architecture  Detailed Design  Testing  Demo  Extensibility  Conclusions.
T Iteration Demo Apollo Crew I1 Iteration
Orientation Workshop on Product Development & Management Functions Workshop 2: IBEX Application Architecture – Part I April 5, 2007 The DSA Project is.
Problem StatementProblem Statement  Difficult to track patients  Knowing location of patients  Patient data  A need for  Real-time patient information.
The Web Developer’s Toolbox Steve Fabian e:
T Iteration demo T Iteration Demo Team Balboa I1 - Iteration
Team S07. Agenda Scope of project Global use case diagram Analysis use cases High Level design (Software Architecture) Prototype challenges faced and.
Team S07 Metric NoName A U AYE THET MON A L NG SIEW LENG A X PRAGATI A X TIN LAI WAI A E VARUN TAK A A ZHANG SHUDONG.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
©2012 MasterCard. Proprietary and Confidential MASTERCARD PERSONAL EXPENSE MANAGEMENT SYSTEM – (MPEMS) Analysis and Design Phase Presented by team 2S.
Mid of Semester Presentation Team Dumbledore: Heng Chen Myung-Joo Ko Neel Mullick Paulo Merson.
SOEN 343 Software Design Section H Fall 2006 Dr Greg Butler
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Rational Unified Process Fundamentals Best Practices of Software Engineering Rational Unified Process Fundamentals Best Practices of Software Engineering.
Intelligence and Information Systems 1 3/17/2004 © 2004 Raytheon Company USC/CSE Executive Workshop on Agile Experiences March 17, 2004 A Raytheon Agile.
T Iteration Demo Vitamin B I1 Iteration
Design Review Presentation. Project Plan Problem Statement As of now, no available social network will allow a user to create it’s own sub social network.
8/23/2012 FPT University1. Agenda  BTS Introduction  BTS Structure  BTS Functions  BTS Summary  BTS Demo 8/23/2012 FPT University 2.
LOGO Penny Auction Website Capstone Project Bid It Team Supervisor Huỳnh Anh Dũng Nguyễn Thị Hòa Nguyễn Duy Khánh Huỳnh Hiếu Nghĩa
V-Shaped Software Development Life Cycle Model. Introduction: Variation of water fall model. Same sequence structure as water fall model. Strong emphasis.
1 The Collaborative Dynamic Art Project Cy Khormaee, Andy Olson, Alex Zheng CSE 403 Product Pitch The Collaborative Dynamic Art Project A proof of concept.
/16 Final Project Report By Facializer Team Final Project Report Eagle, Leo, Bessie, Five, Evan Dan, Kyle, Ben, Caleb.
CAPSTONE PROJECT iTest Group Members Dao Van Son Le Thi Huy Duong Do Thanh Trung Nguyen Duc Loc SupervisorNguyen Van Sang.
METRO CALENDAR A new way to manage your life 1. Table of contents ›Introduction ›Problem definition ›What’s metro calendar ›Project organization ›Project.
Interesting Fact Group Members Cù Hữu Hoàng Đặng Ngọc Dũng Đặng Việt Hùng Phạm Đức Vũ SE01966 SE02251 SE02063 SE02129 SupervisorBùi Ngọc Anh MSc.
COMMON STATISTICAL PRODUCTION ARCHITECTURE WHERE ARE WE ? June 2106 By Bruno URBAN.
T Iteration Demo Vitamin B PP Iteration
Blood Bank Phạm Tiến Lập – SE02683 Nguyễn Sơn Hải – SE02879
Online Event Organizing Company Managemant System
Identity & Access Management Services
RA-Team Supervisor: Tran Dinh Tri Member: Nguyen Hoang Duc(PM)
BUSINESS DRIVEN TECHNOLOGY
TIM 58 More on Chapter 1: Introduction to Systems Analysis and Design
Smart Tendering System
Project Management Process Overview
Week 01 Comp 7780 – Class Overview.
The Islamia University Bahawalpur
Knowledge Sharing Mechanism in Social Networking for Learning
Presentation transcript:

Integrated Electronic Message Board ( iEMB) Phase 2 Presentation Team S02PT

Team Members NameMatrix Number Gu Hong XiangA Raveendran VineethA Balasundaram SelvakumarA Sujatha SomasundaramA Viswalingam ArivazhaganA Kow Huey PingA Win Kyi TinA Yin Ni TunA

Agenda  Introduction and Scope of project  Global use case diagram  Analysis use cases  Incremental Development Strategy  Software Architecture  Transition Strategy  Technical risks and mitigation  Management Problems  Progress Tracking  Change Requests  Demo for Maintain Message  Plan for Incremental 2

Project Introduction  Title  Title : Electronic Message Board  Stakeholders  Stakeholders : Staff, Students and Parents  Objective  Objective : To develop a future proof communication system.  It allows the users to Post, Reply and private messaging to other users.  To share ideas and knowledge.  To Create and Manage Surveys.  Accessible via mobile platforms, including smart phones and tablets.

Global use case diagram

Analysis Use case #1 Maintain Message (Compose)

Analysis Use case #1 Maintain Message (Display)

Analysis Use case #1 Maintain Message (Response Message)

Incremental Development Strategy Iteration 1 Message Board Event Calendar integrated with Outlook System Administration Iteration 2 Survey Module Accessibility via Portable Device Basic Reports

Software Architecture Language Choose : ◦ HTML + JS + C# + MSSQL Platform Choose: ◦ Jquery + MVC 4 Plugin Choose: ◦ Jquery UI, Jquery Template Programming Principle: ◦ Open-Close (Open of extension and close for modification)

Software Architecture Why ◦ Easy to migrate ◦ 80% developers are familiar with those technical ◦ Experience and self-confidence for architect ◦ Fast development ◦ Easy to maintain ◦ Easy to collect information/tutorial for beginner

Software Architecture Layers ◦ UI Layer  Pure JavaScript mode  Jquery support  MVC4 Support ◦ Business Layer  IEMB  Business Factory  Business Implementer  Survey  Service ◦ DB Layer  Simple Entity Framework  ADO.NET

Software Architecture

Transition Strategy Static Structure

Transition Strategy Dynamic Structure

Demo of Increment 1

Project Status

Schedule Variance

Project Plan - Schedule

Management Problem Project Slippage

Plan for Incremental 2  Incremental 1 phase has produced a framework to help us in automating the dominating number of CRUD cases in the system  Practiced close project tracking in meeting tighter deadlines nearer the end  Team power unleashed  Swapping of roles leading to discovery of better roles for team member

Q & A