Doc.: IEEE 802.11-11/1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 17 August 2011 Discussions during.

Slides:



Advertisements
Similar presentations
Doc.: IEEE r2 Submission November 2009 Bruce Kraemer, MarvellSlide 1 Wireless Characterization for NIST PAP#2 Date: Authors:
Advertisements

1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
Doc.: IEEE /01552r1 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
Development plan and quality plan for your Project
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Doc.: IEEE /1268r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– September 2011 Date: 22 September 2011 Discussion topics.
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
Doc.: IEEE r1 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Summary of SGIP PAP2 Activities since April 2012 Mingxi Fan, Alex Gogic, Jing Sun TR-45.5 Liaison to SGIP PAP June 11 th,
SMART GRID INTEROPERABILITY PANEL PRIORITY ACTION PLAN 2 WIRELESS COMMUNICATIONS DEC 6, :00 AM MOUNTAIN FACE-TO-FACE PHOENIX, AZ ROOM 162 WEBINAR.
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
Doc.: IEEE /1112r0 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 10 August 2011 Discussions during.
Doc.: IEEE /0955r0 Submission July 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-July-28 Abstract: Discussion.
1 SGIP PAP 11 PEV V2G DEWG Dec 2-3, 2010 Grid InterOp 2010 Eric Simmon, NIST Jerry Melcher, EnerNex SGIP PAP 11 PEV V2G DEWG Grid InterOp 2010 Meeting.
Doc.: IEEE /1180r2 Submission October 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Activity Report 2010 Date: 2010-October-13 Abstract: Discussion.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE /0720r1 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
IEEE Session # 3 Closing Plenary Mark Klerer, Jerry Upton Vice-Chairs 24 July 2004 IEEE /13r1.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Summary of SGIP PAP Activities since October 2011 Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP April 16 th, 2012.
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Summary of SGIP PAP Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP December 5 th, 2011 ©2011.
Doc.: IEEE /0506r2 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
Doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1180r0 Submission September 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Closing Report 2010 Date: 2010-September-13 Abstract: Discussion.
Doc.: IEEE /1218r0 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
Doc.: IEEE /1180r1 Submission October 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Activity Report 2010 Date: 2010-October-06 Abstract: Discussion.
Doc.: IEEE /0943r3 Submission September 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Summary of SGIP PAP2 Activities Update as of August 2012 Alex Gogic, Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
Smart Grid ad hoc – August 2011
IMT-Advanced Opening Report
Wireless Characterization for NIST PAP#2
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
Energy STAR ad hoc Closing Report - January 2010
Smart Grid ad hoc Closing Report – May 2011
January 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
Smart Grid Closing Report – November 2010
Smart Grid Teleconferences – Jan-Mar 2011
IEEE IMT-Advanced Review Process
<month year> doc.: IEEE < e> January 2012
Wireless Characterization for NIST PAP#2
IEEE IMT-Advanced Review Process
Smart Grid ad hoc Closing Report - March 2010
Smart Grid Activity Report 2010
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc Closing Report - May 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
Supplementary Plenary Information - September 2009
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
Smart Grid ad hoc Closing Report – January 2011
Supplementary Plenary Information - September 2009
Smart Grid Closing Report – November 2010
Smart Grid ad hoc-Closing Report - July 2010
Plenary Information - September 2009
<month year> doc.: IEEE < e> January 2012
September 2003 doc.: IEEE /0423 r0 September 2003
Presentation transcript:

doc.: IEEE /1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 17 August 2011 Discussions during Teleconferences between July and September NameCompanyAddressPhone Bruce KraemerMarvell5488 Marvell Lane, Santa Clara, CA, Tuesday Abstract: 1 – SGIP 2 - NIST PAP2

doc.: IEEE /1112r2 Submission PAP02 Activities Purpose: Biweekly meeting to discuss PAP 2 work items Webinar Info: August 16 - Teleconference 2:00pm ET Tuesdays Aug 30, Sep 13, 27 - Teleconference 2:00pm ET SDO Sub-group Purpose: Sub-group open to anyone with technical knowledge interested in contributing to clarifying SDO terms and generating estimates for covered equipment When: Occurs every Monday effective 8/8/2011 from 9:00 AM to 10:30 AM (UTC-08:00) Pacific Time (US & Canada). Conference Bridge Information Phone: Conference ID: Passcode: 0681 August 2011 Bruce Kraemer, MarvellSlide 2

doc.: IEEE /1112r2 Submission PAP02- Phase 2-SDO Proposal –r1 Intro Thanks to Ron Cunningham for his diligent preparation of requirements for completion of Phase 2. We propose that it is time for the wireless SDO’s to take a more active role in constructing the analytic Proposal/Request We request authorization from PAP2 members to form an “SDO subcommittee” committed to completing delivery of an operational analysis framework, and related descriptive text, in time for presentation to the Dec 05, 2011 SGIP board meeting. Goals Example of deliverables include: Definition of propagation model, ability to calculate quantity of wireless equipment required to cover a given demographic/topographic area and description of statistical confidence in reported numbers Utility/GRID Input Requirements Information regarding actor quantities by type, relative locations, topography, data traffic loads Synchronization “SDO subcommittee” will report progress to during currently scheduled biweekly PAP2 calls Logistics “SDO subcommittee” will convene a series of teleconferences scheduled to optimize SDO participation but open to all PAP2. SDO subcommittee will self organize, assign/delegate work. develop a milestone based project schedule. Webinar facilities will be available. Membership “SDO subcommittee” is a volunteer group initially underwritten by ATIS, IEEE, TIA, and WiMAX. Additional wireless SDO participants will be recruited

doc.: IEEE /1112r2 Submission SDO ACTIVITIES August 2011 Bruce Kraemer, MarvellSlide 4 Complete all work by November Verify completion criteria Deviation from standard procedure assumed – verifying Complete propagation model One approach for all technologies?

doc.: IEEE /1112r2 Submission Catalog of Standards Process + Deliverables Process to progress standard to "all artifacts completed" state As each artifact is constructed, update this page's record by setting an "X" in the appropriate column Construct TWiki Page (use procedure on this page CoSTWikiPageConstruction) CoSTWikiPageConstruction Complete Standard Information Form (SIF) with help of SSO proponent (SIF Template): note:check Catalog of Standards page for attached pdfs from earlier version of SIFSIF TemplateCatalog of Standards Complete Development Process Statement (DPS) (SDP Template)SDP Template Develop initial Criteria and Analysis Report (C&AR) (C&AR Template)C&AR Template Perform SGAC, CSWG, SGTCC, IPRWG reviews -- attach review documents to standard's TWiki page and place summary of comments on pageCSWG August 2011 Bruce Kraemer, MarvellSlide 5

doc.: IEEE /1112r2 Submission Guideline Version 1 August 2011 Bruce Kraemer, MarvellSlide 6 AttributeStandard Information Identifier of the standardNIST IR 7761 Title of the standardGuidelines for Assessing Wireless Standards for Smart Grid Applications Name of owner organizationNIST Latest versions, stages, dates1 URL(s) for the standardhttp://collaborate.nist.gov/twiki- sggrid/pub/SmartGrid/PAP02Objective3/NIST_PAP2_Guidelines_for_Assessi ng_Wireless_Standards_for_Smart_Grid_Applications_1.0.pdf

doc.: IEEE /1112r2 Submission CSWG Comments on 7761 The CSWG recommends the PAP-02 output document, Wireless Standards for the Smart Grid, be accepted as is, but that additional documents be developed in future efforts (in a DEWG or PAP) that:CSWG Address relevant key security requirements identified in the NISTIR 7628, Guidelines for Smart Grid Cyber Security, then add NISTIR 7628 as a normative reference. This effort would require completion of a risk assessment to determine applicable security requirements. Assess the various cybersecurity techniques used with wireless systems, as well as assess the impacts of these cybersecurity techniques on complete wireless systems, including the degree/type of security, performance considerations, configuration issues, and policies/procedures required to ensure their effectiveness. Develop additional Use Cases that cover wireless-specific cybersecurity requirements. August 2011 Bruce Kraemer, MarvellSlide 7

doc.: IEEE /1112r2 Submission CoS Standards Development Process Submitter shall provide materials describing specification development process. Must support maxims i thru v of OMB Circular A-119 with regard to Voluntary Consensus Standards Openness Balance of interests An Appeals process Consensus August 2011 Bruce Kraemer, MarvellSlide 8

doc.: IEEE /1112r2 Submission Development Process sggrid/pub/SmartGrid/SGIPCatalogOfStandards/SGIP _CoS_DevelopmentProcessStatement.dochttp://collaborate.nist.gov/twiki- sggrid/pub/SmartGrid/SGIPCatalogOfStandards/SGIP _CoS_DevelopmentProcessStatement.doc August 2011 Bruce Kraemer, MarvellSlide 9

Copyright 2011 WiMAX Forum. All rights reserved Smart Grid Working Group Report to WiMAX Forum Board of Directors Prepared by: Declan Byrne, SGWG Interim Chair

doc.: IEEE /1112r2 Submission SDO Update – Modeling Tool Goal: Provide “easy-to-use” tool for utilities to do AT evaluations Generically applicable to “terrestrial-based” ATs for “apples-to- apples” comparisons of coverage and cell capacity Inputs required: Cell-Edge Perf. ► System Gain ► Link Budget ► Range Propagation model (Erceg-SUI, Hata-Okumura, COST231, WINNER II, ITU-R M ) Application: Mobile Handset, AMI network, DAP backhaul, etc. Key question: Can we get required performance detail for each AT to achieve our objective? Mod/coding vs. S/(N+I), HARQ differences, hand-offs, Interferences margins, etc Unlicensed vs. Licensed Near term SDO Activity (next 1-2 weeks): Focus on Link Budget WiMAX, LTE, CDMA2000, ,

doc.: IEEE /1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 12 SDO Update – Modeling Tool