EUDET Pixel-related DESY Tobias Haas 29 June 2006.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Stephan Haensel - 7th SiLC Meeting - CERN Combined test beam with LCTPC - an update on present status and schedule S. Haensel 1, T. Bergauer 1, M. Dragicevic.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
Slide 1 Control Software for the CMS Pixel Readout 28 April 2004 R.Stone, Rutgers (J.Doroshenko, DW.Kim, U.Joshi, L.Perera, J.C. Yun, et al) CMS Pixel.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
experimental platform
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
Ingrid-Maria Gregor, EUDET EUDET: Status and Perspectives Ingrid-Maria Gregor, DESY  The EUDET initiative  EUDET activities  Joint Research Activities.
1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY
E-MAS Cooled Optical Bench (COB) System Overview Nov. 15, 2010 Roy W. Esplin Mike Watson Dave McLain Monte Frandsen.
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
Experience with DCCTs at DESY Klaus Knaack. All DC current measurements at DESY are done by PCTs (DCCTs) from Bergoz. They are installed in all circular.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
JRA1 Status: PCMAG, Sensors and Infrastructure Tobias Haas DESY/F1 11 September 2006.
Timepix Telescope Plans Proposed Work Packages for the Timepix Telescope Richard Plackett CERN, 8 th December 09.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
Tobias Haas DESY 8 November 2005 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET First general ideas (with some interludes)
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1: Pixel Telescope Test Beam Campaigns Pixel Telescope: Status Demonstrator Testbeam 1 (DESY) Testbeam 2 (DESY)
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
JRA1 Status: PCMAG, Testbeam Infrastructure and Pixel Telescope Tobias Haas DESY/F1 27 August 2007.
JRA1 Magnet and Test Beam Infrastructure  Superconducting Magnet (PCMAG)  Mechanics  Cooling  Telescope Simulations  Measuring DESY Tobias.
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
FARICH status E.A.Kravchenko Budker INP, Novosibirsk, Russia.
CsI(Tl) Calorimeter and status of the E166 experiment E166 experiment CsI ( Tl) calorimeter construction. Test beam results vs. Geant4 simulation Schedules.
Testbeam Planning Common to all testbeams:
*Institute of Space Science
FCAL R&D towards a prototype of very compact calorimeter
DESY contributions to MAPS DESY testbeam
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
DESY Test Beam Facilities - Status and Plan
Silicon Lab Bonn Physikalisches Institut Universität Bonn
3. Februar 2006 Tobias Haas DESY
Planning for the Demonstrator
Compact and Low Consumption Magnet Design The DESY Experience
The Pixel Hybrid Photon Detectors of the LHCb RICH
EUDET Extended SC meeting 31 August 2009
Status of the EUDET Prototype
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

EUDET Pixel-related DESY Tobias Haas 29 June 2006

Overview Pixel telescope activities –Sensors –DAQ –Infrastructure Magnet Test beam and general infrastructure

DESY Ingrid Gregor Lukasz Maczewski (Warsaw University) Tatsiana Klimkovich Uli Kötz Tobias Haas Carsten Muhl

EUDET JRA1 Schedule Mech./Inf DESY JRA1 Demonstrator Telescope Construction and Integration Mechanics/ Cooling/ Infrastr. Design We are here  Intermediate Review October 2006

Telescope Chip Status Prototype telescope chip (MimoStar 2) at DESY since April Work on general understanding is ongoing. MimoStar 2 USB Imager Board

How ? MimoStar Test Bench

Ingrid-Maria Gregor, DESY Infrastructure Telescope Mechanics  Box 1:  fixed position, optical bench for three reference planes, temperature controlled  Wall to DUT can be removed  Box 2:  movable in z-direction, optical bench for three reference planes, temperature controlled  Wall to DUT can be removed  Box 3:  Gap between 2 and 3, closed by thermal cover  XY-table: external with “long” mechanical structure to locate the DUT between the reference planes (accuracy: 10um, repeatability: <0.5um per axis)  This “arm” is the interface for the different DUTs  Accuracy of mechanic: 0,1mm (alignment runs foreseen)  boxes can be placed into magnetic field, not the XYtable (cost reasons) z y

Ingrid-Maria Gregor, DESY Infrastructure 1 st Drawings in beam directionside view top view Very preliminary !!

Ingrid-Maria Gregor, DESY Infrastructure DAQ Infrastructure  2 PCs to be used for the testbeam have been ordered  One for data taking (Windows XP)  2 parallel ports  6 USB ports  Large disk (~0.5 – 1TB)  One for analysis (Scientific Linux 3)  Working on the optimal solution for data sharing and storing  NAS solution  PCI/VME interface ordered

Telescope Simulation

First Results

PCMAG Interface definitions between DESY and KEK are agreed Some savings due to reuse of HE tranfer line and power supply However, movable support will be more expensive than originally planned

Reuse from KEK

Test beam area 24 Shielding stones moved –to allow access for PCMAG –Improve the shielding Interlock rebuilt Holes for cables from chamber to counting room New lights are being installed General cleanup Whole area was painted

Test beam area 24

Test beam DESY Discussion between U. Kötz and J. Maidment (M): –No changes in near future (→ 7/07) –Electrons, 6 Hz (160ms), /bunch –7/07 → 12/07: positrons –*NO TESTBEAMS* for > 6 months in 08!!! –After that *ONLY POSITRONS* –Maximum energy: 6 GeV