Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Slides:



Advertisements
Similar presentations
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
Advertisements

ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Engineering and Design Group Fermi National Accelerator Laboratory Cryogenic Department AAC Review, May , 2005 Jay Theilacker HPTFCRYOGENICS.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
An Overview of the ILC Cryogenic System Tom Peterson, Fermilab LCFOA at SLAC 1 May 2006.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20 July 2007.
ILC Cryogenic Systems Status and EDR Plans Tom Peterson 25 October 2007.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
1 st stage Possible extension XFEL Cryo System Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13)
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Overview of the ESS Linac Cryogenic Distribution System
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Study and Development of Large Cryogenic Systems in China
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
FRIB Cryogenic Support
Project X: Cryogenic Segmentation Issues
BDS Cryogenic System RDR Status and EDR Plans
Hollow e- lens, Cryogenic aspects
Cryogenic System Operation and the Progress of SSRF II
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
ILC Cryogenic Systems Draft EDR Plan
Commissioning and First Cooldown of XFEL Linac
BriXS – MariX WG 8,9 LASA December 13, 2017.
ILC GDE meeting Cryogenics
Cryo-ops 2018,Beijing,IHEP
ILC Experimental Hall Cryogenics An Overview
ILC Cryogenics -- Technical Design Report Planning
SNS Cryoplant Commissioning Past Experiences
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009

Page 2 AAC, February 3, 2009 – Arkadiy Klebaner Outline Description of the scope of the system Performance specification of the system Primary technical issues and the strategy to address them Open items Goals of the plan by year Role of outside collaborators

Page 3 AAC, February 3, 2009 – Arkadiy Klebaner System Scope Cryogenic Plant – compressors, helium refrigerators, oil removal, gas management, internal purifiers, nitrogen exchanger, valve boxes, plant controls, etc. Cryogenic Distribution System – feed boxes, bayonet boxes, feed caps, end caps, cryogenic transfer lines, headers, over pressure protection devices, cryogenic load instrumentation, etc. Ancillary Systems – gas and liquid storage, recovery compressors, cooling towers, dryers, purification system, etc.

Page 4 AAC, February 3, 2009 – Arkadiy Klebaner Cryogenic Load Low Energy Linac –Superconducting Solenoids and Spoke Cavities –Components are cooled by two-phase helium High Energy Linac –Superconducting Quads and Elliptical Cavities –Components are cooled by superfluid helium Beam Screens –Screens are cooled by a cryogenic fluid

Page 5 AAC, February 3, 2009 – Arkadiy Klebaner Basic Scheme

Page 6 AAC, February 3, 2009 – Arkadiy Klebaner System Requirements Operating Parameters Operating Modes Availability Safety

Page 7 AAC, February 3, 2009 – Arkadiy Klebaner Operating Parameters Low Energy LinacHigh Energy LinacBeam Screens Cavity/SolenoidThermal ShieldsCavity/QuadThermal ShieldsThermal Screens Temperature, [K] – 840 – 8080 – 100 Pressure, [MPa] TBD Heat Load, [W]5005, ,0001,000

Page 8 AAC, February 3, 2009 – Arkadiy Klebaner Operating Modes Steady state –Beam ON Transient –Beam ON/OFF –RF ON/OFF –Cooldown/Warm-up –Fault Scenarios –Maintenance –Commissioning

Page 9 AAC, February 3, 2009 – Arkadiy Klebaner Availability Plant availability – 98% Cryogenic System availability – TBD

Page 10 AAC, February 3, 2009 – Arkadiy Klebaner Safety Full compliance with Fermilab ES&H requirements –Pressure vessels: ASME BPV Code or PED 97/23 –Pressure piping: ASME/ANSI B31 –Oxygen Deficiency Hazard (ODH) mitigation

Page 11 AAC, February 3, 2009 – Arkadiy Klebaner Technical Issues 1. Cryogenic Distribution and Segmentation 2. Capital and Operational Cost Optimization 3. Heat Load Analysis 4. Testing Infrastructure

Page 12 AAC, February 3, 2009 – Arkadiy Klebaner Distribution and Segmentation SCB Picture is courtesy of DESY colleagues

Page 13 AAC, February 3, 2009 – Arkadiy Klebaner Technical Strategy Cryogenic Segmentation (Technical Issue 1) –Study existing cryomodule thermal cycling experience –Development cryogenic process: 2K heat exchanger, steady state, transient, fault, maintenance, and commissioning scenarios –Define tunnel distribution components capacities and location –Conduct components over pressure protection study –Define cryogenic string length limits and segmentation –Develop liquid helium level control strategy –Develop tunnel ODH mitigation strategy

Page 14 AAC, February 3, 2009 – Arkadiy Klebaner Cryogenic Plant Photos are courtesy of LHC and SNS colleagues

Page 15 AAC, February 3, 2009 – Arkadiy Klebaner Technical Strategy (cont’d) Capital and Operating Cost Optimization (Technical Issue 2) –Thermal shield operating parameter optimization –Cryogenic plant cycle optimization –System lifecycle cost optimization –Study effective utilization of existing Fermilab cryogenic assets

Page 16 AAC, February 3, 2009 – Arkadiy Klebaner Technical Strategy (cont’d) Heat Load Analysis (Technical Issue 3) –Investigate static and dynamic loads for all components and sub systems –Define operational overcapacity and heat load estimate uncertainty factors –Fault scenarios heat flux study Excerpts from TESLA and XFEL work

Page 17 AAC, February 3, 2009 – Arkadiy Klebaner Technical Strategy (cont’d) Testing Infrastructure (Technical Issue 4) –Determine SRF testing requirements (type, cryogenic capacity, throughput, etc.) –Define infrastructure needs –Infrastructure optimization (location, equipment selection, etc.)

Page 18 AAC, February 3, 2009 – Arkadiy Klebaner Open Items Finalize External Input Requirements Cryogenic system lifecycle and reliability requirements SRF accelerating component requirement specifications Commissioning scenarios Future upgrade scenarios

Page 19 AAC, February 3, 2009 – Arkadiy Klebaner Goals and Timeline

Page 20 AAC, February 3, 2009 – Arkadiy Klebaner Collaborators TJNAF cryogenic group, in principal, has agreed to lead the Cost Optimization task and to contribute to other tasks at ~0.25 FTE/year level.

Page 21 AAC, February 3, 2009 – Arkadiy Klebaner Summary Project X Cryogenic System RD&D plan will lead to completion of design requirements and will optimize costs The plan is technically feasible. Technical risks deemed to be either low or medium/low. Timely resolution of the Open Items is essential to the successful execution of the plan TJNAF collaborators role requires further definition