1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30, 2013 2.

Slides:



Advertisements
Similar presentations
1. ***Confidential*** Concerns Tag Non Firm Option October 10, 2010 Bert Bressers 2.
Advertisements

Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
BAL-002-WECC-1 Contingency Reserves
1 Utility Wind Integration Group Workshop ACE Diversity Interchange (ADI) Project Sharing Area Control Errors July 2007 Sponsoring Utilities: British Columbia.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
PacifiCorp-CAISO EIM Initiative Overview
IDT Prep 01/24/2014. Announcement IDT 1/21 Preliminary Debrief Presentation on spp.org updated with Regulation Pre-selection data and graphs.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Wind Farm Curtailment Logic. Golden Spread Panhandle Wind Ranch Golden Spread Panhandle Wind Ranch (GS PWR) – 78.2 MW – 34 Turbines – Located just East.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
©2012 | Commercial in Confidence | Proprietary to Ventyx, An ABB Company NYISO Real-time Market Presentation to ERCOT METF – April 26, 2012 Confidential.
Presentation to WECC Market Interface Committee March 24, 2015
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee
Overcoming Challenges To Integrating Renewable Energy Resources May 16, 2013 Paul Roberti, Commissioner Rhode Island Public Utilities Commission.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
Day Ahead Market Working Group March 31, Agenda Review minutes - March 24 Coral Proposal - Working Group Discussion Loads/LDCs and DAM.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Day Ahead Market Working Group April 14, Agenda Discussion of SMD-style DAM review questions posed by the DAM WG and Coral regarding the SMD-
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
1 1 Beacon Power Corporation Energy Storage – Regulation Issues Prepared for: Emerging Technologies Working Group January 5, 2011.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
TOP and BA Responsibilities SPP Wind Workshop May 30, 2013.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Role of Investor Owned Utility in Development of Wind Energy in Iowa from an Engineers perspective Jeff Bales June 2011.
Preliminary IDT Debrief 02/26/ Deployment Test Debrief Overall the Fourteenth Deployment test was a great success All of the BAs.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
14 Minute Ramp Period Testing Workshop June 30, 2009.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Operational Planning Jason Smith. Operational Planning Goals –What Ops Planning is –What Ops Planning is not –What rules we operate under –Limitations.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
MOSC Meeting Operations Market Manual updates October 22, 2003 Presented by:Ron Falsetti Steve Cooper.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Market Release 1.17 MP Testing Kick-Off January 5,
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Wind Management at MISO
Current FRRS Language & Explanation of Posted Data
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Pseudo-tie business procedure
Duke Energy Carolinas Quarterly Stakeholder Meeting
30 Minute Reserves EPFSTF January 4,
Two-Tier Firm Curtailment Overview
NERC Congestion Management
Pseudo-tie business procedure
Presentation transcript:

1

Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,

Agenda Overview of EIS Market Design for Non-Dispatchable Resources Common EIS Market Practices Staff Recommendation Appendix: Changes coming for Marketplace 3

OVERVIEW Section 1 4

EIS Market and Intermittent Resources SPP dispatches Non-Dispatchable Resources to the echo of the resource output every 5 minutes –Wind farms using “Intermittent” status in the resource plan are considered a Non-Dispatchable Resource (NDR)  No economic evaluation is used by the Market for dispatching NDRs –If congestion develops on the system that requires curtailment of the NDRs, SPP uses two methods: 1.Systematic Curtailment through the Market System and Curtailment Adjustment Tool based on transmission priority – New as of March 19, 2013 as a result of three years of stakeholder processes and FERC approval of PRR 240 » More resources will be added on October 15, Manual Curtailment through Reliability Directives using shift factors 5

Systematic NDR Curtailment (PRR 240/242) During non-congested intervals, NDRs are dispatched to persistence (echo of output) For resources under the systematic logic: –In the congestion management process, the SPP Curtailment Adjustment Tool (CAT) includes the unscheduled portion of the output from NDRs in curtailment calculations  Assigns a pro rata relief obligation similar to obligations assigned to other non-firm impacts calculated by SPP CAT and NERC IDC.  GLDF of the unscheduled portion of a NDR is based upon the GSF of the Resource to the constraint and the host BA LSF associated with the constraint. – If GLDF is lower than the cutoff threshold used for interchange transactions no curtailment obligation will be assigned 6

Systematic NDR Curtailment (PRR 240/242) For NDRs with firm transmission service for the full output of the resource: – Any unscheduled output will be assigned a virtual schedule with firm transmission priority (PRR 242 change) For resource without firm transmission service for the full output of the resource: –Any unscheduled output will be assigned a virtual schedule with a non-firm transmission priority of NH2 (in original PRR design) 7

EIS Market and Intermittent Resources MPs may choose to use “Available” status for intermittent resources in the EIS Market, which dispatches based on price and ramp rates –Allows resource to be included in the Market solution and set price –SPP expects the resource to follow dispatch instructions  If the resource does not follow the dispatch instruction it will be subject to URD charges – In addition, adds error to Market solution and causes burden on host BA –Reliability Coordinator can still manually curtail a resource in “Available” status via a directive –Must contact SPP Market Operations before pursuing this option to walkthrough business practices  EIS Market does not use a wind forecast and MPs cannot update resource maxes inside an operating hour systematically – Requires communication to the Market Operator by the Market Participant to update the resource max of the resource in real-time –When using Available status, PRR 240/242 logic does not apply 8

COMMON EIS MARKET PRACTICES Section 2 9

MP Common Practices Many intermittent resources using “Intermittent” status choose to follow the LIP prices for determining when to curtail output –Example:  Wind farm operating at 100MW and sees a price of -$40/MW  Wind farm turns off to 0MW –Reasons:  Market Participants are trying to manage price exposure  Provide relief to the market using the price as a signal of the problem 10

Challenges with Common Practices Challenges with this practice: 1.Creates oscillation in constraint management and pricing in the EIS Market solution  Market solution is always 10 minutes behind real-time Negative LIP  Wind farm turns off  Constraint relieved  Positive LIP  Wind farm turns on  Constraint violated  Negative LIP  process starts over again 2. Causes Reserve Sharing Events for host BA  SPP Criteria requires a BA to report the a loss of generating output of 50 MW or more to the Reserve Sharing Group.  Burdens the host BA for regulation and back-filling the lost generation 11

SPP STAFF RECOMMENDATION Section 3 12

Staff Recommendation If an MP prefers to respond to prices in the EIS Market SPP recommends: –Use “Intermittent” status but only respond in increments of less than 50MW  Causes less price and constraint oscillation in the Market  Prevents host BA from calling RSG event  Limits regulation burden on host BA –Or, use “Available” status in order be apart of the market solution and contact with Market Operations to work through the business practices required 13

Questions 14

APPENDIX Marketplace Changes 15

Marketplace Improvements Marketplace enables Intermittent Resources more flexibility for participation in the market Allows Intermittent Resources to be included in the Market solution, if registered as Dispatchable Variable Energy Resources –Uses the offer curve, ramp rate details, output, and forecast to help determine the optimal dispatch for the resource and the market, together SPP continues to look for way to apply manual curtailments more efficiently 16

Marketplace and Intermittent Resources Variable Energy Resource (VER) –A Resource powered solely by wind, solar energy, run- of-river hydro or other unpredictable fuel source that is beyond the control of the resource operator.  Dispatchable Variable Energy Resource (DVER): – A Variable Energy Resource that is capable of being incrementally dispatched down by SPP – Eligible to offer Regulation-Down, if qualified  Non-Dispatchable Variable Energy Resource (NDVER): – A Variable Energy Resource that is not capable of being incrementally dispatched down by SPP –All VERs must register as a Dispatchable VER except for VERs with an interconnection agreement executed prior to May 21, 2011 that were commerically operational before October 15,

Dispatch of VERs in Marketplace In the Real-Time Balancing Market (RTBM), persistence will be used (echo of actual SCADA output) when there is no congestion on the system –For DVERS:  When there is congestion on the system: – SPP will use the offer curve of the DVER and Market Participants will be a sent a follow signal to lower output  When congestion is over: – SPP will dispatch DVER up at the submitted ramp rate until max limit (lesser of submitted max limit or SPP’s output forecast) is reached –For NDVERs  If SPP needs a NDVER to curtail, the SPP RC will issue a Directive/OOME to curtail the resource down similar to the EIS Market manual process 18