Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.

Slides:



Advertisements
Similar presentations
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Advertisements

Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
The Siberian Snake Kai Hock Liverpool Group Meeting, 12 August 2008.
Accelerating Polarized Protons Mei Bai Collider Accelerator Department Brookhaven National Laboratory PHNIX Focus, Feb. 24,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
PHENIX Local Polarimeter PSTP 2007 at BNL September 11, 2007 Yuji Goto (RIKEN/RBRC)
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
RHIC pp 500 GeV development M. Bai C-A Department.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
RHIC Store Energy Scan Mei Bai Collider Accelerator Dept. Brookhaven National Laboratory.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Accelerating Polarized Protons to High Energy Mei Bai Collider Accelerator Department Brookhaven National Laboratory.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Possibility for polarized beam at J-PARC Summary of Satellite Workshop on Polarized Proton Beam at J-PARC Satellite Workshop Program: Overview of the status.
eRHIC with Self-Polarizing Electron Ring
Multiple Partial Siberian Snakes
Update on MEIC Ion Polarization Work
Multiple Partial Siberian Snakes
Status of RCS eRHIC Injector Design
Presentation transcript:

Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because of the design of the cryostat is too tight, it takes much longer time than expected.  Cold snake testing George’s realistic estimate: March 7 (original March1) The testing takes 2 weeks  Cold snake installation If George’s estimate holds, quite part of the installation can be done during the 2 days shutdown time between Cu and pp. If testing fails, this means another couple of month of fixing, which will prevent us from commissioning the cold snake during the FY05 run and lower the polarization project for the FY06/07 run.

Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status of RHIC  A ramp for Physics at 100GeV is prepared(pp21) Fine tuning of dispersion at STAR and PHENIX is in process  Verified with Cu beam, we are able to correct the orbit down to 0.5mm rms along the ramp  Polarimeter CNI:  hardware on schedule  application developed and had its first dryrun Jet  on schedule

Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Machine Configuration for pp physics  Energy Injection: 46.5 Store:  Working point Ramp: 28.72, Store: 28.68,  Lattice: IP Injection: Store:  Collision Pt: IP  RF: No rebucketing at store

Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Timeline  March 1: AGS pp setup  March 24, 0800: end of Cu run and beginning of pp run  March 24 - March 25 Jet installation CNI pol target&detector installation AGS cold snake installation (?)  March 25 – April 1 Machine setup  April 1 – April 15 Ramp up  April 16 – June 19 Physics run

Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Machine Configuration for pp to 205 GeV  Energy Injection: 46.5 Store:  Working point Ramp: 28.72, Store: 28.68,  Lattice: IP Injection: Store:  Collision Pt:  RF: No rebucketing at store

Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Machine Configuration for pp to 170 GeV  Energy Injection: 46.5 Store:  Working point Ramp: 28.72, Store: 28.68,  Lattice: IP Injection: Store:  Collision pt: 6 8  RF: No rebucketing at store

Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact of 1mm rms orbit distortion(achieved) on the polarization transmission efficiency?  How much can we correct the orbit with the existing RHIC orbit correction system at higher energy? To provide a guidance/justification for the full ring re- alignment of RHIC during summer of 2005  Expection Little or no polarization is expected at energy of 217 GeV with 1mm orbit distortion Polarization ramp measurement will be the key technique in exploring the depolarization mechanisms and locations.

Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Plan Simulation  Spin tracking with ~1mm rms orbit distortion  Spin tracking with different orbit distortions to evaluate the tolerance of orbit distortions. With beam  Develop the ramp to 170 GeV(10m – 2m from inj to 100GeV And remain 2m upto the top) Measure the polarization/orbit distortion along the ramp Vary the orbit distortion around 135 GeV where the strong intrinsic resonance is located  Develop the ramp to 205 GeV Measure the polarization/orbit distortion along the ramp

Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Challenge of going beyond 100 GeV p=217 GeV This gives the same Brho as Cu and one can avoid an additional DX magnet training Intrinsic spin resonance Qx=28.73, Qy=29.72, emit= 10 achieved