Technical Support 2008 1 5/8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.

Slides:



Advertisements
Similar presentations
Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.
Advertisements

PHENIX WEEKLY PLANNING 9/13/2007 Don Lynch. 9/13/2007 Weekly Planning Meeting 2007 PHENIX Shutdown April-June 2007: Complete run, De-mount HBD West, Begin.
Technical Support /23/08 PHENIX WEEKLY PLANNING 10/23/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
Technical Support /12/08 PHENIX WEEKLY PLANNING 6/12/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
1 4/2/2009 PHENIX WEEKLY PLANNING 4/2/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
Technical Support /24/08 PHENIX WEEKLY PLANNING 4/24/2008 Don Lynch.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
Technical Support /26/08 PHENIX WEEKLY PLANNING 6/26/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
1 7/16/2009 PHENIX WEEKLY PLANNING 7/16/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch

Technical Support /8/08 Shutdown ’08 Schedule Shutdown PrepDone Mu Trigger, RPC Prototype Installation, New Beampipe, CM Crane, Sta. 1 and MMN Scaffolding ReviewsAll Done, Action Items in progress RPC Prototype C tests (in tent)in progress Install/field fit CM access stairs in progress RPC Gap 0 and 5 base surveyDone MuTr FEE upgrade/MuTr decaps WPDone Remove North access & MMN 4 lampshades Done Remove MMS East vertical Lampshade Done Build MMN scaffolding5/13 Build Sta. 1 N. scaffolding5/26 MuTr Decapacitations (Sta. 1 N and MMN)6/2 RPC Prototype D tests (in tent)Apr-May Design RPC installation fixtures & MuTrigger FEE platformsIn progress

Technical Support /8/08 Shutdown ’08 Schedule, cont’d RICH air control move to DC RackMay 1-30 Prep work for Mutrgr platforms (water/elec)May-June Prep work for RPC proptotype installMay-June move (7) MuID pipes move gap 5 south cable tray End of run Party May 30 Prep RPC Proto, MuTrggr FEE N&S RacksApr-July Install CM Crane Channel SupportsJune-Sept RPC engineering & safety reviewmid June MuTrigger FEE N Install July - Aug. Install MuTrigger N cooling water & airJuly - Aug. HBD InstallJuly-October RPC prototype gas systemJuly - Aug Move shielding for RPC prototype installationJuly - Aug RPC prototype cable routing & supportJuly - Aug Modify crystal palace & vapor barrierJuly - Aug Install MuTrigger FEE N platformJuly 15 – Aug 1 RPC prototype installAug.- Sep. (RPC3 – C. Pearson) (RPC2 – PHENIX)

Technical Support /8/08 Install RPC prototype rack in tunnel southAug Install Mutrigger FEE’s in MMS for RPC testAug Install MuTrigger FEE South platformAug Install MuTrgr N&S rack cooling & electricAug Replace tunnel shieldingNov. (C. Pearson) Connect electronics/gas/water/air for RPCSep. – Nov. Install MuTrigger N& S racksSep. - Nov CM Crane InstallOct. PC1 west work (needs planning)Sep. – Nov. DC East?/West RepairsOct. – Nov. Remove all inst’n equipment(e.g. scaffolds)Oct. - Nov Gap 5 north piping and cable tray re-loc.Oct. – Dec. Gap 2 north cable tray & crate re-mountsOct. - Dec Prep for shutdown 2009Nov. - Dec Prep for run 9Dec Close shield wall start shifts Dec. Start physicsJan 1 Shutdown ’08 Schedule, cont’d

Technical Support /8/08

Technical Support /8/08 1) Install 30KVA UPS in Rack Room. a) Remove existing 15kva UPS and relocate smaller 3KVA Safety System UPS. b) Install new 30KVA UPS, 30 min. reserve capacity battery cabinet and maintenance bypass breaker box along west rack room wall. c) Remove existing #6 UPS feeder cable and replace with larger #2 gauge cable (175 ft. run from feeder breaker to UPS and UPS to load distribution panel). 2) Install HVAC cooling and/or fan power circuits into RPC tent. Install fans/cooling units. 3) Run Power to new MuTrgr FEE racks on MMN and MMS 4) Install HVAC cooling and/or fan power circuits into RPC tent. Install fans/cooling units. 5) Install power and signal cable tray (ceiling suspended) for new DCM rack row – north of existing DCM racks. 6) Assist in signal cable installation for MuTr/RPC upgrades as necessary. 7) Upgrade power capacity of Central Magnet power distribution for future bridge rack loads. a) Remove existing 15KVA transformer and install 45KVA unit. b) Install new (larger size) power cable from rack room to Central Magnet distribution breaker panels. 8) Install power feeds to RPC north & south tunnel racks from IR power panels. NOTE: MuTr north power panel has no available breakers to feed north tunnel racks (south panel has spare breakers for use). More engineering analysis is required to determine if the north power panel should be increased in size or for installation of a sub panel branch can be accomplished. 9) Install 120 volt AC power drops into new control room annunciator alarm rack (rack room). Shutdown ’08 Electrician Work

Technical Support /8/08 Work Permit Requirements Standard Shutdown Commencement tasks (covered by approved procedures) Done MuTrigger FEE Upgrade (North & South) & MuTr Decaps, (including confined space for MMS & MMN and scaffold installation) done, waiting for approval CM Crane Installation RPC Prototype Installation HBD re-installation MuTrigger FEE rack platform installation PC1 Repairs (More will be needed – to be added to the list as appropriate)

Technical Support /8/08 Shutdown Work $$$ Spending priorities meeting last Friday Projects Include: 1.CM Crane 2.New 40 mm ID beampipe 3.RPC Factory 4.RPC Prototype Installation 5.RPC Final Installation 6.MuTrigger FEE Upgrade 7.CM Access Stairs 8.MuTr Decapitations 9.Gas House Reorganizationmaintenance 10.Bridge Rework 11.HBD Re-installation 12.DC East & West Repairs 13.PC1 Repair 14.Rack room UPS upgrade 15.Bridge Power upgrade 16.Rack Room Update 17.Detector Rack Fan tray replacement 18.Safety System Upgrade 19.Cooling Water system upgrade 20.DAQ/Trigger Upgrade 21.DCM II Development 22.VTX support 23.FVTX support 24.NCC support PHENIC Engineering and Technical Support Group Update next Friday, Spreadsheets by Tomorrow

Technical Support /8/08 MuTrgr North FEE Rack Platform

Technical Support /8/08 Exploring alternative configurations To maximize utilization of the bridge Bridge Rack Platform

5/8/0811 Shelf & Pb brick concept

Technical Support /8/08 RPC Prototype Review Rec’d dim’s and lifting points from Larry B. Ready to start work on RPC prototype installation

Technical Support /8/08 RPC Factory Support, cont. (2) ~1 Ton thru-the-wall AC’s available from CA-D 208V Need isolated electrical source Checked and found to be in acceptable working condition, need to be cleaned up and mounted

Technical Support /8/08 Combined CM Crane, MMN & Station 1 scaffolding Review Station 1 platforms rec’d. Remaining components due ~5/28 WP is approved Station 2/3 ready to build. Waiting for administrative approval and. Crane installation Postponed until fall

Technical Support /8/08 New Beampipe Design & Review SS/Be central beampipe 1-5/8” to 3” transitions Drawings Done, C-A getting Quotes for NEG coating BP designs at SAES for NEG quote. Meet w/ Brush Wellman 5/19

Technical Support /8/08 CM Access

Technical Support /8/08 Safety, Security, etc. Reminder PPE Rules: Proper PPE at all times. No shorts in the AH or IR. Proper shoes at all times Please minimize tripping hazards in the AH and IR. We are getting lots of tours lately.

Technical Support /8/08 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Coming soon to a TV near you: Big Bangs and Black Holes: Starring Mike Rau, Jimmy La Bounty and Frank Toldo With expert commentary by Ed O’Brien and Barbara Jacak