SWANA - Saskatchewan Landfill Capital and Operational Costs By Steve Johnson M.Eng., P.Eng. November 2015.

Slides:



Advertisements
Similar presentations
Overview of the Draft Regional Master Plan Presented to the Solid Waste Management Coordinating Board October 26, 2011.
Advertisements

Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
PREPARED BY- NABANITA SHARMA M.E. 3 RD SEMESTER ROLL NO.-10/12.
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
Korea Energy Management Corporation Climate Technology Partnership Workshop jointly organized by KEMCO, U.S. EPA and NREL June 2004, Seoul, Korea.
1 Results Based Regulation Implications for Municipal Solid Waste Management Presented By: Blake E. Nesbitt Saskatchewan Ministry of Environment SUMA Convention.
Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis.
Brent Hansen Environmental Commercial Composting
NATIONAL SOLID WASTE MANAGEMENT PROGRAMME RIVERTON LANDFILL.
Jfkdlsafjkdljflkajfklasjfkldsjflkjflksdjflkdsjfldsjfl kjflkjflkdsajflkdsjflkdsjflkdsjflksjfdlksjfdkslfjkl dsjfkldsjfldksjdsklfjkdlsfjdklsjaflkdjskdjfkdlsjk.
Water and Wastewater Focus Wireless Sales Push 2009.
Part III Solid Waste Engineering
January 20 th, BudgetActual% YTDChange from prior year Ad Valorem Taxes $ 36,469,256$ 27,782, %$ 1,020,143 Sales Taxes 10,781,313 2,638,615.
Landfills Geography 12 Kala Renard
Prepared by Denese Ballew and Brian Taylor from Land-of-Sky Regional Council Solid Waste Management Study for the Town of Waynesville.
The Process of Siting and Approving a New Landfill in Ontario
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
What Roles, Responsibilities, and Financial Tools for Local Governments? Enid Slack Institute on Municipal Finance and Governance Munk Centre for International.
San Juan County Solid Waste: Funding. Solid Waste Funding Current Solid Waste Revenue Current Solid Waste Revenue Rate Structure used to collect revenue.
Presented to SWAC February 16, 2012 City of Cleveland Automated Waste Collection And Curbside Recycling Program.
Getting to 50% and Beyond: Zero Waste in the RDN.
Resource Recovery Legislation Dave Gordon MWA Spring Workshop May 2015.
LEA Conference, Autumn 2007 Joseph Mello, Land Disposal Program Manager 1 WATER BOARD FINANCIAL ASSURANCE FOR KRFR.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
MODULE “STRATEGY DEVELOPMENT”
San Juan County Solid Waste Program Rate Workshop 12/10/02.
Funding Discussion State of Vermont Solid Waste Management Districts and State Programs.
Shore Reception Facilities
September 16, SWANA 2005 COLORADO CHARLES JOHNSON SOLID WASTE UNIT LEADER.
14 Financial and Economic Aspects 1/13 Content of Lecture 14.1 Costs of solid waste collection, sorting and processing 14.2 Benefits of managing solid.
A Comparison of Estimated Costs of Waste Disposal Options Is there a Future for Waste-to-Energy? Jeffrey F. Clunie R. W. Beck, Inc. N O V E M B E R 2 0.
WASTE TAXES Past Taxes and Projected Changes. Solid Waste Operators of Solid Waste facilities and Transfer facilities pay a $6 per ton tipping fee. Vermonters.
UW Cooperative Extension Land Use Education Programs Comprehensive Planning Overview March 15th Osceola WI Polk County UWEX-Cooperative Extension.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
1 An Overview of EPR Jim Frey, CEO of Resource Recycling Systems What it Means for North Carolina, and What are Viable Alternatives NC SWANA Fall Conference.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Solid Waste Management Chapter Generation (Section 14.2) What is the average per capita MSW generation in the U.S.? A. 1.3 lb/d B. 2.4 lb/d C. 4.6.
Finance Department Presentation to the City of Houston Budget and Fiscal Affairs Committee First Quarter Review General Fund Five Year Scenario and FY2012.
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
Environmental Perspectives ENVM 649: Principles of Waste Management and Pollution Control Dr. Robert Beauchamp.
City of Hamilton 2007 Tax Budget Update January 8th, 2007.
Utilities Department Solid Waste System Tipping Fees November 11, 2008.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Ministry of Environment Environmental Protection Branch Solid Waste Management Strategy November 2015.
SOLID WASTE REGIONALIZATION MONTANA’S JOURNEY Waste & Underground Tanks Management Bureau Solid Waste Section.
Manitoba Association of Regional Recyclers “Presentation on Methane Gas Recovery” Tom Keep Community Development Coordinator – Environment November 7,
Proper Waste Management Today For A Better Tomorrow SWANA Waste Management Workshops Saskatchewan November 2015.
Landfill Closure SWANA November 2015.
Smooth Sailing Ahead Partnering With Sustainability and Waste Compliance & Mitigation Fernando Berton, CIWMB.
Discussion of Priority Activities for Next Eighteen Months Action Plans.
Ellen Lorscheider Solid Waste Section Division of Waste Management Solid Waste Management Annual Report Environmental Review Commission February 18, 2010.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
SOLID WASTE MANAGEMENT CAPITAL PROJECTS ASSESSMENT Board of County Commissioners FEBRUARY 24, 2009.
Solid Waste Study Board of County Commissioners March 20, 2012 Orange County.
Waste and Minerals Core Strategy Preferred Strategy Consultation Land Disposal Workshop Uckfield 3 November 2009 Ian Blake, Team Manager – Waste and Minerals.
Policy Committee Report Virginia Recycling Association Annual Members Meeting Charlottesville, Virginia November 8, VRA Policy Committee Report1.
Results of the Review of MSW Landfill Regulations from Selected States and Countries Landfill Facility Compliance Study presented to California Integrated.
Metro Vancouver New Waste-to-Energy Capacity Project SIWMA Conference, Pemberton September 20, 2013 Sarah Wellman, Acting Project Manager.
Tay Valley Township Landfill Master Plan
Solid Waste Draft AMP 2018/2021.
Hampden Township Stormwater Management Program
First Nation Waste Management Initiative
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Curbside Collection of Leaf & Yard Waste
Mecklenburg County Solid Waste FY 2018.
10 C Strategy Management of Capital Expenditures hapter
2017 Total Revenues were: $9,165, Revenues by program:
SWAC – Agenda 11/27/18 1. City of Bend – Southeast Development Plan
SWAC – Agenda 1/22/19 1. Introduction / Approval of Minutes
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Presentation transcript:

SWANA - Saskatchewan Landfill Capital and Operational Costs By Steve Johnson M.Eng., P.Eng. November 2015

SWANAPage 2 Introduction Saskatchewan Tipping Fee Ranges Landfill Siting and Design Assumptions Range of Operational Costs Assumptions – audience participation Tipping Fee Calculation Development Solid Waste Management Plan Questions

November 2015SWANAPage 3 Saskatchewan Tipping Fee Ranges Poll of room for tipping fees From Internet search larger municipal landfills, with scales, charge $60 to $90 per tonne Smaller municipal landfills, without a scale, charge by the load so can not compare to cost per tonne

November 2015SWANAPage 4 Fictional Landfill – Siting and Design Assumptions Assumptions One quarter section appropriately sited and designed the following design criteria have been used to develop the airspace: –25% (4 horizontal to 1 vertical) grade on waste side slopes, to a height of approximately 15 m; –5% minimum grade on top of the landfill; –1,825,000 m 3 of airspace (1,369,000 tonnes) Landfill Design Infrastructure –1.0 m compacted clay liner (least cost option) –a tireshred leachate collection system (least cost option) –Stormwater pond –Leachate pond –Scale house and maintenance building –Front end transfer area and recycle area Miscellaneous –Contingency, legal appeals, regulatory applications, land purchase, power and utilities, engineering Notes: 1) that capping not included in with Capital estimate 2) New and expanding landfill should develop a landfill Master Plan to outline the staged development of the landfill for regulatory and budgeting purposes.

November 2015SWANAPage 5 Fictional Landfill – Siting and Design Assumptions

November 2015SWANAPage 6 Fictional Landfill – Siting and Design Assumptions

November 2015SWANAPage 7 Fictional Landfill – Capital Costs Assumptions Estimate all landfill capital costs in 2015 dollars. Developed for low and high range for costs Capital Costs

November 2015SWANAPage 8 Fictional Landfill – Capital Costs Assumptions Divide total low and high range costs by the estimated 1,369,000 tonnes of waste disposed to determine the cost per tonne in 2015 dollars

November 2015SWANAPage 9 Fictional Landfill – Operational Costs Assumptions Three case scenario`s for landfills taking 5,000 tonnes per year, 10,000 tonnes per year, and 20,000 tonnes per year Equipment – varied capital depreciation expense on hours and capital cost –Compactor –Dozer –Wheel loader Personnel – varied hours and vested hourly rates –Equipment operator –Scale operator –Manager –Laborer Operations costs - –Soil moving (cover) –Leachate disposal/treatment (assumed annual leachate generation and disposal cost range) –Environmental monitoring –Closure costs (capping) –Post-closure costs (25 years of environmental monitoring) –Steve Johnsons - spreaksheet - SWANA Regional System Landfill Capital and Operational Costs.xlsSteve Johnsons - spreaksheet - SWANA Regional System Landfill Capital and Operational Costs.xls

November 2015SWANAPage 10 Fictional Landfill – Operational Costs Range

November 2015SWANAPage 11 Fictional Landfill – Tipping Fee Range

November 2015SWANAPage 12 Setting the Stage – Solid Waste Management Plan Other regulatory jurisdictions have implemented solid waste management plans for waste disposal and diversion programs. A solid waste management plan, where several municipalities can form an ‘organization’ to manage their waste more effectively. Factors to consider area: –transportation corridors –Existing waste infrastructure (airspace, capacity, age, maintenance, etc.) –Geology –Population –Politics –Regulatory –Public Regulatory and public impetus to increase diversion, find alternative ways to manage waste, resistance to siting new landfills, more stringent landfill design and operations requirements, reduce tax or waste management fee, market value for recyclables, etc.

November 2015SWANAPage 13 Jurisdictions that have SWMPs British Columbia –Environmental Waste Management Act required SWMP –Guide to the Preparation of Regional Solid Waste Management Plans by Regional Districts Ontario –Legislation requiring recycling and diversion –Has a 2007 Policy Statement on Waste Management Planning: Best Practices for Waste Managers to plan for waste management needs over the next 20 to 25 years and obtain 60% diversion –Funding available to develop plan ($15K) –Is not mandatory Nova Scotia –Provincial Act requires SWMP (2007 Act – 300 kg/capita/yr disposal target) –Developed provincial material bans –Set up a resource recovery fund –Established EPR programs (e-waste, tires, beverage containers, lead acid batteries, paints/solvents) –Required municipalities to develop SWMP and provided financial assistance

November 2015SWANAPage 14 SWMP Components Inventory and description of all solid waste handling facilities and future needs Estimate of long range needs for a minimum of 20 years Program for the development of solid waste facilities Considerations for land use planning Financial plan for the next 6 years for the facilities Financial assessment for the capital and operational expenditures for the next six years Program for surveillance and control Comprehensive waste reduction and recycling strategy Inventory and assessment of waste collection needs for the next six years.

November 2015SWANAPage 15 SWMP – Potential Results Increased diversion from landfill and WTE to meet provincial diversion targets Operational efficiency Better use of solid waste resources and infrastructure Possible reduction in capital or operational costs

November 2015SWANAPage 16 Questions

Thank You.