28th May 2009, Madrid XVI MADRID FORUM ERGEG GGPLNG : 2009 monitoring exercise.

Slides:



Advertisements
Similar presentations
1 Harmonization of Cross Border Transmission Tariffs between Portugal and Spain (CNE/ERSE) Public hearing 15 th SG Meeting S-GRI Madrid, 7 th February.
Advertisements

1GTE – October 23rd 2003 Regulation of the gas market in France Dominique JAMME Gas Directorate
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Guidelines for Good Third Party Access Practice For LNG System Operators (GGPLNG) Rocío Prieto ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
André Piérard, ERGEG Project Leader on Complaints Citizens’ Energy Forum, London, September 2009 Draft advice on Customer Complaint Handling, Reporting.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum September 2011 Accessing European LNG terminals.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
Rocío PRIETO – Comisión Nacional de Energía Benoît ESNAULT – Commission de Régulation de l’Energie LNG TF chairs 18th Madrid Forum Madrid, 27/28 September.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Erik Rakhou - Energiekamer 19th Madrid Forum 22 March 2011 Amendment of the Guidelines of Good Practice for Storage System Operators - Capacity allocation.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009.
Walter Boltz, Chairman ERGEG Gas Working Group 16 th Madrid Forum, 29 May 2009 Storage Capacity allocation & congestion management Criteria to determine.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
8th SG Meeting South Gas Regional Initiative 27th April 2009, Paris.
Rocio Prieto - Comisión Nacional de Energía 19th Madrid Forum March 2011 CMPs and anti-hoarding in European LNG terminals Results from public consultation.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Directorate General for Energy and Transport Johannes ENZMANN Administrator DG Energy and Transport European Commission GTE 2nd Annual Conference 23 September.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
PROGRESS REPORT ON THE DEVELOPMENT OF THE IBERIAN GAS MARKET (MIBGAS) Presentation for South Gas Regional Iniciative 17th September 2007.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Autorità per l’energia elettrica e il gas Working Visit of the Federal Tariff Service of the Russian Federation Milan, March ICER VIRTUAL WORKING.
XV Madrid Forum, 6 and 7 November 2008 ERGEG Guidelines of Good Practice for Gas Balancing (GGP-GB): 2008 ERGEG Monitoring Report Mr. Walter Boltz ERGEG’s.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Johannes Mayer (E-Control), Chair ERGEG URB TF Karsten Bourwieg (Bundesnetzagentur), ERGEG URB TF Citizens’ Energy Forum, London, September 2009.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Capacity Allocation and Congestion Management Monitoring results & proposal for new measures Stefanie Neveling (BNetzA) Benoît Esnault (CRE) Madrid Forum,
LNG Study: Is an European Action Plan Necessary? Bucharest, October 24 th, 2008 Pedro Moraleda Energy Markets Advice.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
ETSO-GTE Supporting a secure and liberalized European energy market A Joint Presentation by Mr Geert Joosten, GTE Mr Juha Kekkonen, ETSO 22 January 2003.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Views on the EC Draft LNG Paper
Harmonization of Cross Border Transmission Tariffs between
Gas Transmission Europe
Gas balancing – where next
Introductory Speech FRANCISCO DE LA FLOR - GLE PRESIDENT 26/04/2007
Capacity Allocation Mechanisms
DRAFT DG TREN Staff Working Paper on LNG
Transparency & Services
LNG Workshop Bilbao, March 13th 2009 GLE.
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
ERGEG’s reaction on DGTREN LNG study results and policy conclusions
Presentation transcript:

28th May 2009, Madrid XVI MADRID FORUM ERGEG GGPLNG : 2009 monitoring exercise

2Madrid Forum XVI, 28th May 2009 GGPLNG – 2009 monitoring exercise INDEX 1.Level of participation 2.Results: 2.1. General information 2.2. Tariffs and tariff methodologies 2.3. Roles and responsibilities 2.4. TPA services 2.5. Capacity allocation mechanisms (CAMs) and congestion management procedures (CMPs) 2.6. Transparency 2.7. Trading of capacity rights 3.Recommendations

3Madrid Forum XVI, 28th May Level of participation  NRAs’ and LSOs’ responses NRACountry BELGIUM Commission pour la Régulation de l'Electricité et du Gaz (CREG) FRANCE Commission de Regulation de l'Energie (CRE) GREECE Ρυθμιστική Αρχή Ενέργειας / Regulatory Authority for Energy (PAE / RAE) ITALY Autorità per l’Energia Elettrica e il Gas (AEEG) PORTUGAL Entidade Reguladora dos Serviços Energéticos (ERSE) SPAINComisión Nacional de Energía (CNE) UNITED KINGDOM Office of Gas and Electricity Markets (Ofgem) TOTAL: 7 NRAs (100%) LSO Name Number of terminals Country Bahía de Bizkaia Gas (BBG)1Spain ENAGAS S.A.3Spain Regasificadora del Noroeste, S.A (Reganosa) 1Spain Planta de regasificación de Sagunto S.A. (SAGGAS) 1Spain ELENGY2France Societé du Terminal Méthanier de Fos Cavou 1France GNL Italia S.p.a.1Italy Terminale GNL Adriatico S.r.l.1Italy Fluxys LNG1Belgium Hellenic Gas Transmission System Operator S.A. 1Greece National Grid Grain LNG1United Kingdom REN Atlantico, S.A.1Portugal TOTAL: 12 LSOs, 15 terminals (86%)

4Madrid Forum XVI, 28th May Level of participation  Users’ responses UserCountry User 1Italy, Spain User 2Spain User 3Spain, UK User 4Greece User 5Portugal User 6France, Spain User 7Italy User 8Italy User 9Portugal User 10France, Italy, Spain User 11France User 12France, Portugal Spain. User 13Spain User 14Spain TOTAL: 14 business groups, 21 questionnaires received

5Madrid Forum XVI, 28th May Results: General information More than half of LSOs are also TSOs and 36% are supply undertakings as well. Only 2 LSOs report to be exclusively dedicated to managing their LNG terminals. 38% of users indicate that they are part of the same vertically integrated undertaking with the LSO to which the completed questionnaire applies Only 3 NRAs state having implemented measures to assure confidentiality and avoid competitive imbalances Only 17% of LSOs identified potential incompatibilities between GGPLNG and national regulations

6Madrid Forum XVI, 28th May Results: Tariffs USERS‘ RESPONSES

7Madrid Forum XVI, 28th May % 2.2 Results: Tariffs USERS‘ RESPONSES

8Madrid Forum XVI, 28th May 2009 While NRAs are generally satisfied with the degree of compliance with GGPLNG on tariffs, users believe that there is room for improvement, so an effort needs to be made concerning: Tariff methodology transparency Cost-reflection Efficient tariff incentivising terminal utilisation How to manage congestion revenues 2.2 Results: Tariffs

9Madrid Forum XVI, 28th May 2009 Good degree of GGPLNG implementation on these issues. Room for improvement regarding: Implementation of IT systems by users Cost-reflection in penalties design Development of a balanced framework regarding responsibilities and penalties of LSOs and users. 2.3 Results: Roles and responsibilities

10Madrid Forum XVI, 28th May Results: TPA services. Services offer LSOs‘ RESPONSES

11Madrid Forum XVI, 28th May Results: TPA services. Contracting proccess Standard contracts and terminal codes are being used or under definition in all the terminals LSOs‘ RESPONSES

12Madrid Forum XVI, 28th May 2009 Important degree of harmonisation and transparency when defining bundled services, which almost always include: ship reception and unloading, LNG storage and regasification capacity Interruptible services are not being offered in most of the cases 48% of users indicate that services are defined without market consultation 52 % of users explain that services offered do not accommodate their needs, pointing out other services required as bundled or unbundled (trucks loading, extra LNG storage…). Services to be defined at market request and with market collaboration, preventing distortions among terminals Contracting process to be clearly detailed 2.4 Results: TPA services. Services offer

13Madrid Forum XVI, 28th May 2009 Users view of terminal code show that, 70% comply with the GGPLNG. Aspects that can be improved: To include rules for secondary capacity markets Better definition of CMPs Tolerance levels of services and imbalances Liabilities Users identified lack of visibility regarding available slots GLE to analyse the need to standardise notice periods 2.4 Results: TPA services. Terminal code and scheduling USERS‘ RESPONSES

14Madrid Forum XVI, 28th May 2009 In general, users are satisfied with the cooperation between LSOs and TSOs 2.4 Results: TPA services. LSOs and TSOs cooperation USERS‘ RESPONSES

15Madrid Forum XVI, 28th May Results: CAMs and CMPs LSOs‘ RESPONSES

16Madrid Forum XVI, 28th May 2009 Only 14% of users consider CAMs and CMPs facilitate liquid capacity trading 2.5 Results: CAMs and CMPs LSOs‘ RESPONSES

17Madrid Forum XVI, 28th May Results: CAMs and CMPs LSOs‘ RESPONSES

18Madrid Forum XVI, 28th May Results: CAMs and CMPs 76% of users prefer secondary capacity markets USERS‘ RESPONSES

19Madrid Forum XVI, 28th May 2009 Underused and/or underutilised capacity is only defined in three countries 2.5 Results: CAMs and CMPs. Antihoarding mechanisms NRAs‘ RESPONSES

20Madrid Forum XVI, 28th May 2009 Different mechanisms are applied in different terminals Opinions differ among stakeholders, not only on their understanding of the current type of mechanism, but also on the opportunity for developing new ones Market consultation is not used broadly when designing CAM and CMP. Also a majority of users consider them non market-based Improvements can be made developing: Effective, simple and consistent CAM and CMP Information provided on how mechanisms in place work CAM and CMP compatible with liquid trading and spot markets Clear definition of underused and systematically underutilised capacity 2.5 Results: CAMs and CMPs

21Madrid Forum XVI, 28th May 2009 User’s opinions concerning effective publication of transparency criteria, services offer, used and available capacities, tariffs, etc. indicate global recognition of an adequate transparency level Improvements can be made on: Availability of slots Penalties Accessibility of information in English 2.6 Results: Transparency

22Madrid Forum XVI, 28th May 2009 While 76% of users prefer secondary capacity markets as the best CMP, according to NRAs, only three of the monitored countries have established operative secondary markets 2.7 Results: Trading of capacity rights LSOs‘ RESPONSES

23Madrid Forum XVI, 28th May Recommendations  Users favour greater standardisation, wider services provision and hence, implementation of general practices at the European level  Certain degree of improvement is necessary regarding tariff structures, certain service provision, CAM/CMP definition and anti-hoarding principles  Secondary markets must be fostered for the dynamic and competitive growth of the market, responding to the most common users’ complaint  Rules to avoid congestion problems and the mechanisms to manage them must be settled under consensus-building, taking into account market’s preferences  More time would be beneficial in order to allow NRAs and LSOs the full implementation of GGPLNG provisions in their systems  In some markets the number of users is still low, so new surveys should be undertaken in the future, once market develops

24Madrid Forum XVI, 28th May 2009 Thank you for your attention! Mark your diary for the World Forum on Energy Regulation IV October 18-21, 2009 Athens, Greece